网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

An LPAR has hung during a reboot, reporting a 0552LED code. What does this signify?()

  • A、varyon of the paging device failed.
  • B、fsck of the root (/) filesystem failed.
  • C、varyon of the root volume group failed.
  • D、IPL device could not be opened or a read failed.

参考答案

更多 “An LPAR has hung during a reboot, reporting a 0552LED code. What does this signify?()A、varyon of the paging device failed.B、fsck of the root (/) filesystem failed.C、varyon of the root volume group failed.D、IPL device could not be opened or a read failed.” 相关考题
考题 A server is being set up at a client location. The system has been powered up for a clean install of the base OS. The CD is in the drive. After 5 minutes, the system is hung. There is no activity with the CD-ROM drive and nothing to select on the screen. Which of the following procedures should be performed next?()A.Boot off diskette and change boot device to CDB.Change the bootlist for normal mode and rebootC.Reboot and press 5/F5 after keyboard is displayed on the screenD.Press enter to open SP menus once OK is showing in the LEDs

考题 A client is experiencing issues after cloning an LPAR using alt_disk_install. DLPAR functions are not available for the new LPAR. Also, there is a lot of network traffic to the HMC. What is the most probable cause of this problem?()A、DLPAR functions are not available for cloned partitionsB、The new partition has the same node number as the original LPARC、Additional filesets need to be reinstalled after the alt_disk_install cloningD、The speed and duplex settings on the Ethernet adapter on the new LPAR is misconfigured

考题 An administrator has implemented the following LPARs on a Power 570 with 32 GB memory with 512 MB remaining for allocation: LPAR 1 memory : min = 10 GB des = 15 GB max = 24 GB  LPAR 2memory : min = 10 GB des = 15 GB max = 24 GB The administrator receives a request to add 2 GB to LPAR 1. The only way to do this is by moving memory from LPAR 2 to LPAR 1. The administrator attempts to move the memory, but the operation fails. The administrator can  however allocate 512 MB that is free to LPAR 1 on the 570.  What is the most likely cause of this failure when dynamically moving memory?()A、 Maxperm% is set too low on LPAR 2B、 Insufficient paging space on LPAR 1C、 Service IBM.DRM is unavailable on LPAR 1D、 Insufficient pinnable memory frames available on LPAR 2

考题 As a best practice, when should the server be rebooted to apply the reboot required patches?()A、During scheduled downtimeB、Once a yearC、As soon as the patches are finished installingD、At the same time every day

考题 A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()A、 Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.B、 Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.C、 Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.D、 Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.

考题 A system administrator has been instructed to attach storage in their client LPARs, in a Power 770, with fibre channel adapters using N_port ID virtualization (NPIV). Which of the following partitions has the minimum requirements to utilize virtual fibre channel?()A、LPAR-A with 1Gb FC HBA and SAN connectionB、LPAR-B with 2Gb FC HBA and SAN connectionC、LPAR-C with 4Gb FC HBA and SAN connectionD、LPAR-D with 8Gb FC HBA and SAN connection

考题 The administrator changed the number of virtual processors from 1 to 2 in the default_profile of an LPAR. The operator ran thecfgmgr command expecting to see 2 processors after that, but did not see them. What action must be done to apply the changes?()A、Reboot AIX within the LPAR.B、Run cfgmgr against the device sys0.C、Shutdown and then activate the default_profile.D、Ensure the RSCT daemon is operative and run cfgmgr again.

考题 A server is being set up at a client location. The system has been powered up for a clean install of the base OS. The CD is in the drive. After 5 minutes, the system is hung. There is no activity with the CD-ROM drive and nothing to select on the screen. Which of the following procedures should be performed next?()A、Boot off diskette and change boot device to CDB、Change the bootlist for normal mode and rebootC、Reboot and press 5/F5 after keyboard is displayed on the screenD、Press enter to open SP menus once OK is showing in the LEDs

考题 A customer has shut down an LPAR after using DLPAR to add or remove processor and memory resources. When the partition is reactivated, the desired changes are missing. What action, or sequence of actions, will immediately and permanently solve this problem?()A、Add or remove the resources in the profile, click 'apply', then 'save'.B、Add or remove the resources using DLPAR and change the partition profile.C、Add or remove the resources using DLPAR, then shutdown and reactivate the LPAR.D、Add or remove the resources in the system profile and reboot the managed system.

考题 A system administrator needs to quickly migrate a machine from AIX 5.1 to AIX 5.2. The administrator will only be allowed enough downtime to reboot the machine. Which installation method should be used to accomplish this task?()A、Perform a migration installation during the reboot process.B、Perform an alternate disk installation and migration using NIM.C、Copy the /usr directory from another 5.2 server to this server.D、Perform an update_all install from 5.2 media to take effect on reboot.

考题 A resource was dynamically assigned to an LPAR. The customer wants to make the assignment permanent.  What does the technical specialist need to do to reconfigure the LPARs to make the assignment permanent?()A、Reboot the source LPAR.B、Remove the resource from the source LPAR.C、Rediscover the managed system from the HMC.D、Add the resource to the profile of the LPAR.

考题 A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()A、A CD or DVD with installation mediaB、An internal SCSI adapter in the target LPARC、An Ethernet adapter for access to an FTP serverD、Advanced Power Virtualization feature of the p5 590

考题 A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()A、4B、8C、16D、32

考题 After making changes to the profile for an LPAR, the administrator asks the operator to bring the LPAR back up into a running state with the new changes. Which of the following is the correct way to do this?()A、Shutdown and activate the partition profileB、Reboot the partition using the reboot commandC、Reboot the partition using the 'shutdown -r' commandD、Right click on the partition profile and select the 'apply changes' option

考题 An LPAR has hung during a reboot, reporting a 0552 LED code. What does this signify?()A、varyon of the paging device failed.B、fsck of the root (/) filesystem failed.C、varyon of the root volume group failed.D、IPL device could not be opened or a read failed.

考题 A user has an application server LPAR with a physical Ethernet adapter. They want to have a database LPAR also connected to the application LPAR via virtual Ethernet. Their security policies require a firewall between the application LPAR and database LPAR. Which of the following virtual Ethernet configurations satisfies the customer’s requirements?()A、The application server,firewall,and database server on the same VLANB、The application server and firewall on one VLAN,and the database server on a second VLANC、The application server on one VLAN,and the database server and firewall on a second VLAND、The application server and firewall on one VLAN,and the firewall and database server on a second VLAN

考题 System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems. What is the most probable cause of this problem?()A、The LPAR Configuration backup is corruptB、The LPAR Configuration has been altered using DLPARC、The LPAR Configuration backup was performed on a different HMCD、The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed

考题 单选题A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()A  Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.B  Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.C  Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.D  Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.

考题 单选题A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()A A CD or DVD with installation mediaB An internal SCSI adapter in the target LPARC An Ethernet adapter for access to an FTP serverD Advanced Power Virtualization feature of the p5 590

考题 单选题One of the workers has hung the curtains that had been laying on the floor.A hasB hungC hadD laying

考题 单选题After making changes to the profile for an LPAR, the administrator asks the operator to bring the LPAR back up into a running state with the new changes. Which of the following is the correct way to do this?()A Shutdown and activate the partition profileB Reboot the partition using the reboot commandC Reboot the partition using the 'shutdown -r' commandD Right click on the partition profile and select the 'apply changes' option

考题 单选题Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB Use DLPAR to move resources from the test LPAR to training when training is activeC Install Partition Load Manager to share resources between the test and training environmentsD Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs

考题 单选题An administrator has implemented the following LPARs on a Power 570 with 32 GB memory with 512 MB remaining for allocation: LPAR 1 memory : min = 10 GB des = 15 GB max = 24 GB  LPAR 2memory : min = 10 GB des = 15 GB max = 24 GB The administrator receives a request to add 2 GB to LPAR 1. The only way to do this is by moving memory from LPAR 2 to LPAR 1. The administrator attempts to move the memory, but the operation fails. The administrator can  however allocate 512 MB that is free to LPAR 1 on the 570.  What is the most likely cause of this failure when dynamically moving memory?()A  Maxperm% is set too low on LPAR 2B  Insufficient paging space on LPAR 1C  Service IBM.DRM is unavailable on LPAR 1D  Insufficient pinnable memory frames available on LPAR 2

考题 单选题System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems. What is the most probable cause of this problem?()A The LPAR Configuration backup is corruptB The LPAR Configuration has been altered using DLPARC The LPAR Configuration backup was performed on a different HMCD The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed

考题 单选题A user has an application server LPAR with a physical Ethernet adapter. They want to have a database LPAR also connected to the application LPAR via virtual Ethernet. Their security policies require a firewall between the application LPAR and database LPAR. Which of the following virtual Ethernet configurations satisfies the customer’s requirements?()A The application server,firewall,and database server on the same VLANB The application server and firewall on one VLAN,and the database server on a second VLANC The application server on one VLAN,and the database server and firewall on a second VLAND The application server and firewall on one VLAN,and the firewall and database server on a second VLAN

考题 单选题A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()A 4B 8C 16D 32

考题 单选题Companycom has a p5 590 that has their production LPAR, their Tivoli Storage Manager (TSM) LPAR, and several other LPARs. What method would provide connectivity between the production LPAR, and the TSM LPAR, but be isolated from the other LPARs in the system without utilizing a Virtual IO Server or physical adapter resources?()A Use shared memory and semaphores to transfer the data to the TSM LPARB Provide gigabit Ethernet adapters in each LPAR and run a crossover cableC Create a Virtual Ethernet between the production server and the TSM LPARsD Create a Virtual Ethernet between the TSM server LPAR and the non-production LPARs