网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
During working of an air compressor, () should be drained.
A

inter cooler

B

cylinder

C

outlet pipe

D

inlet pipe


参考答案

参考解析
解析: 暂无解析
更多 “单选题During working of an air compressor, () should be drained.A inter coolerB cylinderC outlet pipeD inlet pipe” 相关考题
考题 tell us briefly about the working principles of the purifier ,the oil water seperator and air compressor .

考题 what is the use of “unloader “on main air compressor ?

考题 单选题During working, thermostatic expansion valve should be ().A either all the way open or all the way closedB normally fully openC throttled depending on loadD controlled by liquefied pressure

考题 单选题The sudden reduction of pressure occurring within the crankcase of a refrigeration compressor during starting causes the ().A sudden evaporation of wax crystals in the lubricantB sudden evaporation of entrapped air in the lubricantC release of refrigerant from the oil/refrigerant mixtureD release of dissolved lubricant from the refrigerant

考题 单选题Air blowing from the intake air filter of an operating air compressor indicates ().A broken inlet valvesB broken discharge valvesC pulsations in the air distribution systemD overloading of the air distribution system

考题 单选题During working of an air compressor, () should be drained.A oil sumpB oil separatorC outlet pipeD inlet pipe

考题 单选题The unloading system on an air compressor will ().A increase compressor discharge pressure on demandB increase compressor operating speed as necessaryC allow the motor to turn the compressor opposed only by frictionD reduce the compressor frictional load when starting

考题 单选题During the inspection, the starting air valves should be closed () the engine from turning.A to increaseB to speed upC to preventD to reduce

考题 单选题During operation, the ()should check the working condition of the derrick.A foremanB operatorC openerD stevedore

考题 单选题()are supplied by main switchboard directly.A Suez Canal searchlight, air compressor and air conditioning compressorB Air compressor, boiler blower and refrigeration plantC Boiler blower, Suez Canal searchlight and refrigeration plantD Suez canal searchlight, air compressor and boiler blower

考题 单选题Broken valve strips in an operating low pressure, air compressor will cause ().A an immediate crankcase explosionB oil contamination in the compressed airC a decrease in compressor capacityD no immediate loss of the compressed air capacity

考题 单选题Before starting an air compressor, It should be ().A turnedB oil level checkedC filled with waterD A and B

考题 单选题Before starting an air compressor, It should be ().A unloadedB primedC filled with waterD greased

考题 单选题The air compressor pumps air to the ().A expansion tankB combustion chamberC air receiverD evaporator

考题 单选题Air compressors are equipped with unloading systems for the purpose of().A removing all but the frictional load during startingB relieving intercoolers of high temperature buildupsC providing high starting torque in the drive motorD seating valve plates during compressor shutdown

考题 单选题The air compressor pumps air to the ().A air cylinderB combustion chamberC steam drumD expansion tank

考题 单选题The air compressor pumps air to the().A engine cylinderB air bottleC evaporatorD condenser

考题 单选题The air filter is fixed in the () of an air compressor.A inlet pipeB outlet pipeC inter coolerD after cooler

考题 单选题During (), the starting air valves should be closed to prevent the engine from turning.A overhaulB runningC blowing downD All of the above are correct

考题 单选题If an air compressor is used to supply compressed air to outlets throughout the engine room and on deck of a vessel, the system is known as the ().A combustion control air systemB supply air systemC ships service air systemD low pressure deck air system

考题 单选题An un-loader is installed on an air compressor to ().A bypass the high pressure stage to the low pressure stage on 100% of the air compressors in serviceB prevent excessive inter-stage pressure buildupC control compressor discharge pressureD remove all but the frictional load during starting

考题 单选题To prevent the unnecessary loading of an air conditioning system while maintaining the designed dry bulb temperature and relative humidity in an air conditioning system, you should ()A admit only enough fresh outside air to provide proper ventilationB reduce the air reheating system loadC lower the compressor head pressureD operate the purge recovery unit continuously

考题 单选题Air compressor cylinder un-loaders enable the compressor to ().A vary their speed according to temperature and loadB start and come up to speed before air compression beginsC change speed according to overload demandsD reduce compressed air charge density

考题 单选题Air compressor receivers should be “blown down” at least ().A yearlyB quarterlyC monthlyD daily

考题 单选题Routine maintenance on a Central Control Room hermetically sealed air conditioning unit should include ()A changing the air filterB recharging the systemC changing compressor lubricantD renewing container vacuum

考题 单选题If an air compressor is used to supply air primarily to the combustion control system and other pneumatic controllers, the entire system is known as the ().A control air systemB forced draft air systemC supply air systemD ships service air system

考题 单选题During working, when the piston is near the (), the air ignites the fine spray of fuel.A TDCB DTCC BDCD BCD