网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
When is dock survey carried out?()
A

During annual repair

B

Usually during dock repair

C

Before sea trial

D

After 5 years from last annual survey


参考答案

参考解析
解析: 暂无解析
更多 “单选题When is dock survey carried out?()A During annual repairB Usually during dock repairC Before sea trialD After 5 years from last annual survey” 相关考题
考题 Every possible test () to decide the nature of her illness. A、carries outB、carried outC、was carried outD、has carried out

考题 What is NOT true about overhaul repair?( ) A.Overhaul repair is a major repair.B.Overhaul repair is carried out in a dock.C.Overhaul repair is carried out once a year.D.Overhaul repair is done for the purpose of rating.

考题 ______, where the ship is docked for hull coating renewal, and for any other required underwater work to be carried out, when the opportunity is taken to make other repairs.A.Voyage repairsB.Routine dockingC.Damage repairsD.Conversion

考题 When the tail-shaft is drawn from a vessel in dry-dock, which of the following inspections is required to be carried out?A.The propeller hub taper and shaft keyway should be inspected for cracks or corrosionB.The stern bearing alignment with the stern frame should be checkedC.The interior of the stern tube should be inspected for leaksD.The shaft liner should be removed and inspected for cracks

考题 Preventive maintenance______.A.should not be carried out during the watchesB.can only be carried out in portC.is a kind of maintenances carried out prior to the occurrenceD.is a kind of maintenances carried out after the occurrence

考题 At ______ an occasional survey has been carried out.A.the remind of the masterB.the refer of the masterC.the render of the masterD.the request of the master

考题 When loading bulk liquid cargo,what is the first action you should take if a cargo valve jammed open?A.Call the owner,operator,or terminal supervisorB.Unplug the deck scuppersC.Order the dock man to shut downD.Run out the vessel's or terminal's fire hose

考题 If passengers are on board when an abandon ship drill is carried out,they should ______.A.take partB.watchC.go to their quartersD.stay out of the way and do what they want

考题 When attempting an upstream landing while pushing empty barges ahead in a hard onshore wind,the approach is best made ______.A.With bow out,stern inB.With bow in,stern outC.Parallel to the dock,as close in as possibleD.Parallel to the dock,as far out as possible

考题 The()into the fire accident was carried out by two policemen.AquestionBdoubtCinvestigationDinformation

考题 Scheduled preventative maintenance visits should be carried out:()A、after two unplanned service calls.B、according to manufacturers specifications.C、when the device is becoming unreliable.D、every sixty days.

考题 单选题Please arrange the survey()early.A to be carried outB carry outC be carried outD will carry out

考题 单选题When loading bulk liquid cargo,what is the FIRST action you should take if a cargo valve jammed open?()A Trip the pump relief valveB Order the dock man to shut downC Call the owner,operator,or terminal supervisorD Run out the vessel's or terminal's fire hose

考题 单选题When loading bulk liquid cargo,what is the first action you should take if a cargo valve jammed open?()A Call the owner,operator,or terminal supervisorB Unplug the deck scuppersC Order the dock man to shut downD Run out the vessel's or terminal's fire hose

考题 单选题Which of the following procedures should be carried out when a large, low-speed, diesel engine is operated with one cylinder secured?()A Lubrication to the defective cylinder should be increasedB Cooling water temperature to the engine should be increasedC Only the turbocharger speed should be reducedD Engine speed should be reduced

考题 单选题When the tail-shaft is drawn from a vessel in dry-dock, which of the following inspections is required to be carried out?()A The propeller hub taper and shaft keyway should be inspected for cracks or corrosionB The stern bearing alignment with the stern frame should be checkedC The interior of the stern tube should be inspected for leaksD The shaft liner should be removed and inspected

考题 单选题Medium survey should be carried out () times during the valid period of the certificate.A 2B 3C 4D 1

考题 单选题(),where the ship is docked for hull coating renewal, and for any other required underwater work to be carried out, when the opportunity is taken to make other repairs.A Voyage repairsB Routine dockingC Damage repairsD Conversion

考题 单选题If passengers are on board when an abandon ship drill is carried out,they should().A take partB watchC go to their quartersD stay out of the way and do what they want

考题 单选题When the PSCO would like to witness a fire drill carried out by the crew, he should consult ()to locate a simulated fire.A the manager of the companyB the surveyor of the Classification SocietyC the master of the vesselD the chief engineer of the vessel

考题 单选题() should be tested and adjusted when the boiler survey is carried out.A The boiler oil tankB The steam pipeC The fire sideD The safety valves

考题 单选题Preventive maintenance ().A should not be carried out during the watchesB can only be carried out in portC is a kind of maintenances carried out prior to the occurrenceD is a kind of maintenances carried out after the occurrence

考题 单选题When attempting an upstream landing while pushing empty barges ahead in a hard onshore wind,the approach is best made().A with bow out,stern inB with bow in,stern outC parallel to the dock,as close in as possibleD parallel to the dock,as far out as possible

考题 单选题When putting changes into practice, if emotions of employees draw all the attention,A employees will be grateful to leaders.B the workplace will present a new appearance.C leaders will be considered nice and easy-going.D any change will never be carried out.

考题 单选题At()an occasional survey has been carried out.A the remind of the masterB the refer of the masterC the render of the masterD the request of the master

考题 单选题Which of the following precautions should always be carried out in dry dock?()A Liquids should never be transferred between tanks without consulting the dock masterB If sea valves have been disassembled, all bonnets must be checked for leakage when the ship is re-floatedC Before re-floating, all sea chest strainers should be verified as having been replacedD All of the above

考题 单选题When checking a mooring line,you should().A ensure the bight is not fouled between the ship and the dock by taking up slackB pay out slack smartly and keep free for runningC secure more turns to hold the line against any strain,then clear the areaD surge the line so that it maintains a strain without parting