网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A customer wants to upgrade an existing pSeries system.  In addition to retrieving the IBM configuration records, what else should be done to ensure an accurate upgrade quote is provided?()
A

Request that the pSeries technical specialist provide the discount percentage to the customer.

B

Run both eConfig and PCRS6000 to ensure that both configurators provide the same upgrade quote.

C

Confirm with the customer that the installed inventory accurately reflects what is actually installed.

D

Provide options to the customer so they can choose the most appropriate upgrade for their environment.


参考答案

参考解析
解析: 暂无解析
更多 “单选题A customer wants to upgrade an existing pSeries system.  In addition to retrieving the IBM configuration records, what else should be done to ensure an accurate upgrade quote is provided?()A Request that the pSeries technical specialist provide the discount percentage to the customer.B Run both eConfig and PCRS6000 to ensure that both configurators provide the same upgrade quote.C Confirm with the customer that the installed inventory accurately reflects what is actually installed.D Provide options to the customer so they can choose the most appropriate upgrade for their environment.” 相关考题
考题 A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers.What configuration setting does the storage specialist need to highlight?()A. increase the buffer credits on the HBAsB. increase the number of device logins on the ESX serversC. additional paths will be required between the servers and storageD. multipath option on the ESX servers should be changed to round-robin

考题 A mainframe customer has requested a proposal to replace an existing storage system. Which information does Disk Magic provide?() A. logical volume sizesB. cache usage by applicationC. storage processor utilizationD. disk capacity needed forFlashCopy

考题 An existing IBM customer has a few pSeries servers running DB2 on AIX in their environment.  The DB2 application contains the database for an order entry application.  An xSeries SQL database server replicating from DB2 is added for off-line analysis purposes.  The customer wants to know if consolidating the storage and centralized backup is possible. What are the options available to accomplish this?()A、pSeries and xSeries use different file systems. Consolidating Storage and backup is not achievable.B、Consolidation is possible by connecting pSeries local storage to the xSeries SQL server using the IXA adapter.C、Storage consolidation can be achieved by connecting the pSeries and xSeries servers to a common DS4000 storage server.D、Storage consolidation is only achievable when raw file systems are used by the databases and both servers run the same Linux file system (e.g., EXT3 or Reiser).

考题 A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers.  This is the first p650 in the enterprise.  What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()A、Have the PDU requirements been met?B、Are there sufficient KVM connections?C、Is there sufficient service clearance?D、Is there sufficient space in the existing rack?

考题 A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers. What configuration setting does the storage specialist need to highlight?()A、increase the buffer credits on the HBAsB、increase the number of device logins on the ESX serversC、additional paths will be required between the servers and storageD、multipath option on the ESX servers should be changed to round-robin

考题 A customer wants to upgrade an existing pSeries system.  In addition to retrieving the IBM configuration records, what else should be done to ensure an accurate upgrade quote is provided?()A、Request that the pSeries technical specialist provide the discount percentage to the customer.B、Run both eConfig and PCRS6000 to ensure that both configurators provide the same upgrade quote.C、Confirm with the customer that the installed inventory accurately reflects what is actually installed.D、Provide options to the customer so they can choose the most appropriate upgrade for their environment.

考题 A customer wants to upgrade their existing 6-way p650 to an 8-way.  The installed inventory shows the p650 as only a 4-way.  What should the pSeries technical specialist do in order to best correct IBMinventory records? ()A、Submit an RPO-MES to add the missing 2-way processor card.B、Submit an MES order to add the missing 2-way processor card.C、Request VPD from the customer and then submit an RPO-MES request.D、Request VPD from the customer and then submit an MES order to add the missing 2-way processor card.

考题 A customer is having problems after an AIX version upgrade from 5.2 to 5.3.  Which of the following should the pSeries technical specialist recommend that the customer call?()A、IBM TechlineB、IBM SupportlineC、IBM Software DistributionD、IBM Hardware Support

考题 A customer wants a configuration for a new system that includes Reserve CoD.  Which of the following systems would be the most appropriate to configure for them?()A、p5-550B、p5-520C、pSeries p650D、pSeries p630

考题 A customer with p615, p630 and p650 pSeries servers installed and running AIX is considering Linux as an additional environment. Which Linux capabilities can the pSeries Sales Specialist present as choices that are available to enhance the existing systems?()A、Linux will be restricted to the p650 system, as it is not supported on the p630.B、The customer can run Linux on all the existing systems with or without the presence of AIX.C、Linux can run in LPARs on the existing systems but Linux will require the presence of AIX in at least one LPAR.D、Linux can be installed on all existing systems but will require the AIX Linux Affinity libraries to boot the systems and run Linux.

考题 A solution provider has proposed a pSeries solution to a new customer.  The solution is complex with a number of technologies that are new to the customer. They have a tight timeline for implementation.  The solution provider has not been able to get a clear understanding as to how the customer will backup the system.  What would be the most appropriate action to address the risks with this solution?()A、Sell SysbackB、Conduct a SARC、Sell SupportlineD、Provide a project timeline

考题 A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()A、PCIe adaptersB、PCI-X adaptersC、PCI-X andPCIe adaptersD、PCI, PCI-X andPCIe adapters

考题 A customer requires management capabilities for installed pSeries systems via a Microsoft Windows system. Which of the following should be considered?()A、TSMB、PSSPC、WebSMD、LoadLeveler

考题 A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system.  How might the pSeries technical specialist aid the customer in addressing their concern?()A、Direct the customer to the Installation Guide for each system to identify the power requirements.B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.

考题 A customer wants to improve the utilization of the current capacity of their existing N series Tier 1production storage. What solution would the storage specialist discuss with the customer?()A、 compression with IBM Real-time Compression Appliances B、 deduplication with IBM ProtecTIER C、 virtualization with IBM SVC D、 file virtualization with SONAS

考题 A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS.  Which of the following must be completed prior to this migration ()A、Upgrade system firmware to latest levelB、Upgrade to AIX 5.3C、Upgrade HMC to version 6.1D、Convert rootvg filesystems to JFS2

考题 A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A、Order a new HMC to support the p5 system.B、Attach the new p5 system to the existing HMC.C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D、Do nothing.  This system does not require an HMC.

考题 A mainframe customer has requested a proposal to replace an existing storage system. Which information does Disk Magic provide?()A、logical volume sizesB、cache usage by applicationC、storage processor utilizationD、disk capacity needed forFlashCopy

考题 A customer has a pSeries that needs to be upgraded from AIX Version 5.1 to AIX Version 5.2. The customer wants to retain /etc/passwd. Which of the following installation types should be used?()A、Preservation InstallB、Retention InstallC、Overwrite InstallD、Migration Install

考题 单选题A customer wants to improve the utilization of the current capacity of their existing N series Tier 1production storage. What solution would the storage specialist discuss with the customer?()A  compression with IBM Real-time Compression Appliances B  deduplication with IBM ProtecTIER C  virtualization with IBM SVC D  file virtualization with SONAS

考题 单选题A customer has an existing SP system and needs to add cards to some of the nodes.  Which of the following applications must be used to configure the upgrade?()A MRPDPlus toolB Inventory ServicesC PCRS6000 Portable ConfiguratorD eConfig - IBM Configurator for e-Business

考题 单选题A customer with p615, p630 and p650 pSeries servers installed and running AIX is considering Linux as an additional environment. Which Linux capabilities can the pSeries Sales Specialist present as choices that are available to enhance the existing systems?()A Linux will be restricted to the p650 system, as it is not supported on the p630.B The customer can run Linux on all the existing systems with or without the presence of AIX.C Linux can run in LPARs on the existing systems but Linux will require the presence of AIX in at least one LPAR.D Linux can be installed on all existing systems but will require the AIX Linux Affinity libraries to boot the systems and run Linux.

考题 单选题A customer wants to migrate their existing cluster onto new POWER6 hardware, and in addition requires thecluster to be migrated from PowerHA version 5.3 to 5.5. Given that AIX 6.1 and PowerHA 5.5 filesets arealready installed in the new hardware, which of the following methods would allow the customer to maintaintheir current cluster configuration?()A Add the new nodes to the existing cluster, and perform a rolling migration and remove the original nodesfrom the clusterB Add the new nodes to the existing cluster, and perform a non-disruptive upgrade and remove the originalnodes from the cluster.C Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Start cluster serviceson the new cluster and stop the original clusterD Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Stop cluster serviceson the original cluster and start on the new cluster

考题 单选题After months of negotiations and several proposals, the customer indicates that they may be ready to purchase a pSeries system.  Rather than quickly ordering the last configuration proposed, what is the most appropriate next step for a pSeries technical specialist to improve the chance of a successful project?()A Obtain buy-in and feedback from the customer.B First ask the client executive if financing has been arranged.C Plan the installation and rollout schedule before ordering.D Confirm that any additional requirements are handled by others.

考题 单选题A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers.  This is the first p650 in the enterprise.  What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()A Have the PDU requirements been met?B Are there sufficient KVM connections?C Is there sufficient service clearance?D Is there sufficient space in the existing rack?

考题 单选题You are helping the customer customer configure anthentication,a new asyncOS upgradebecomes available,what should you do?()A avoid mentioning the upgrade to the customerB schedule a convenient time to upgrade again, backing up the configuration before and after theupgradeC contact customer support and ask them to run the upgrade for youD immediately show the customer how to run the CLI command upgrade

考题 单选题An existing IBM customer has a few pSeries servers running DB2 on AIX in their environment.  The DB2 application contains the database for an order entry application.  An xSeries SQL database server replicating from DB2 is added for off-line analysis purposes.  The customer wants to know if consolidating the storage and centralized backup is possible. What are the options available to accomplish this?()A pSeries and xSeries use different file systems. Consolidating Storage and backup is not achievable.B Consolidation is possible by connecting pSeries local storage to the xSeries SQL server using the IXA adapter.C Storage consolidation can be achieved by connecting the pSeries and xSeries servers to a common DS4000 storage server.D Storage consolidation is only achievable when raw file systems are used by the databases and both servers run the same Linux file system (e.g., EXT3 or Reiser).

考题 单选题A customer wants to receive automatic notification of critical software problems and fixes for their RS/6000 or eServer pSeries system.  Which is the most appropriate services offering to recommend to them?()A TechlineB ConsultlineC Operational Support Services - RS/6000 SystemWatchD Operational Support Services - Alert for pSeries