网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
On an anchor windlass,the wheel over which the anchor chain passes is called a().
A

brake compressor wheel

B

devil's claw

C

wildcat

D

winchhead


参考答案

参考解析
解析: 暂无解析
更多 “单选题On an anchor windlass,the wheel over which the anchor chain passes is called a().A brake compressor wheelB devil's clawC wildcatD winchhead” 相关考题
考题 On an anchor windlass,the wheel over which the anchor chain passes is called a______.A.brake compressor wheelB.devil's clawC.wildcatD.winch head

考题 An anchored vessel on pilotage duty must show which light(s) at night?A.A sternlight onlyB.Anchor lights onlyC.A white light over a red light onlyD.A white light over a red light and anchor lights

考题 The sprocket wheel in a windlass,used for heaving in the anchor,is called a ______.A.capstanB.dog wheelC.fairleadD.wildcat

考题 The opening in the deck beneath the anchor windlass that leads to the chain locker is the ______.A.Hawse pipeB.Fall pipeC.Drop-pipeD.Spill pipe

考题 Lower the anchor until it is clear of ()(锚链筒).A、chain lockerB、hawse pipeC、windlassD、anchor chain

考题 In anchor orders, “Up and down” means “()”.A、The chain is not uprightB、The chain is uprightC、The chain is slackD、The chain is not slack

考题 When the order “Let go the anchor” is received ,you should ().A、release the brakeB、hoist the anchor ballC、turn the windlass over slowlyD、A and B

考题 单选题A permanent chain chasing system is used to().A clean anchor chain as it's hauled inB recover anchors which have lost their buoysC run and retrieve anchorsD prepare anchor chain for inspection

考题 单选题Prior to taking over the deck watch in port,the relieving officer shall not be informed by the officer in charge of the deck watch as to().A the depth of the water at the berthB the ship‟s draughtC the duty of the relieving officerD the arrangement of anchor and the scope of the anchor chain

考题 单选题The part of the anchor windlass that engages the anchor chain for lifting is called the ().A warping headB fairleadC wildcatD capstan

考题 单选题You are riding to a single anchor.The vessel is yawing excessively.Which action should be taken to reduce the yawing().A Veer chain to the riding anchorB Heave to a shorter scope of chain on the riding anchorC Drop the second anchor at the extreme end of the yaw and veer the riding anchorD Drop the second anchor at the extreme end of the yaw,then adjust the cables until the scope is equal

考题 单选题Moving of an anchor over the sea bottom to control the movement of the vessel defines().A dredging ( of anchor )B dragging ( of anchor )C weighing anchorD walking out anchor

考题 单选题When the order “Let go the anchor” is received ,you should ().A release the brakeB hoist the anchor ballC turn the windlass over slowlyD A and B

考题 单选题In a combination chain and wire rope mooring system,the anchor chain is deployed at the anchor end of the line to().A increase fatigue life of the systemB reduce the time to retrieve the lineC increase the holding powerD reduce the catenary

考题 单选题When anchored,increasing the scope of the anchor chain normally serves to().A prevent fouling of the anchorB decrease swing of the vesselC prevent dragging of the anchorD reduce strain on the windlass

考题 单选题The purpose of the stripping bar on an anchor windlass is to().A clean off any mud that may have accumulated on the chainB engage or disengage the wildcatC fairlead the chain from the hawse pipe to the wildcatD prevent the chain from fouling the wildcat

考题 单选题After deploying the anchor,a permanent chain chaser is().A removed from the anchor chainB connected to a buoy at the anchorC stripped back to the rig and securedD connected to a buoy halfway down the chain

考题 单选题The opening in the deck beneath the anchor windlass that leads to the chain locker is the().A hawse pipeB fall pipeC drop-pipeD spill pipe

考题 单选题A design modification of an anchor chain which prevents kinking is the().A detachable linkB stud linkC Kenter linkD connecting link

考题 单选题What is meant by veering the anchor chain? ()A Bringing the anchor to short stayB Heaving in all the chainC Locking the windlass to prevent more chain from running outD Paying out more chain

考题 单选题The sprocket wheel in a windlass,used for heaving in the anchor,is called a().A capstanB dog wheelC fairleadD wildcat

考题 单选题Your vessel is anchored in an open roadstead with three shots of chain out on the port anchor.The wind freshens considerably and the anchor begins to drag.Which action should you take FIRST().A Drop the starboard anchor short with about one shot of chainB Sheer out to starboard using the rudder,then drop the starboard anchor with about four shots of chainC Put the engines slow ahead to help the anchorD Veer out more chain on the port anchor

考题 单选题If the pump for a hydraulic anchor windlass is over heating, the cause may be ().A increased pump speedB excessive pump discharge pressureC too low of a tilting box angleD low pump speed

考题 单选题What is a spill pipe?()A A drainage pipe that carries rain or spray from an upper deck to a lower deckB A pipe under the anchor windlass leading to the chain lockerC A chute,usually over the stern,to lead dumped garbage clear of the hullD An opening in the deck leading outside the hull

考题 单选题What is the bow type anchor shackle primarily used for().A Chain to chain connectionsB Chain to anchor connectionsC Kenter link to anchor connectionsD Wire rope connections

考题 单选题If your vessel is dragging her anchor in a strong wind,you should().A shorten the scope of anchor cableB increase the scope of anchor cableC put over the sea anchorD put over a stern anchor

考题 单选题Which safety check(s)should be made before letting go the anchor().A See that the anchor is clear of obstructionsB See that the chain is all clearC See that the wildcat is disengagedD All of the above