网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
The reason for the obligation to load a full cargo()that otherwise the Shipowner would lose freight on account of some part of the ship’s carrying capacity not being utilized.
A
is
B
makes
C
has
D
takes
参考答案
参考解析
解析:
暂无解析
更多 “单选题The reason for the obligation to load a full cargo()that otherwise the Shipowner would lose freight on account of some part of the ship’s carrying capacity not being utilized.A isB makesC hasD takes” 相关考题
考题
Which of the following is the FINAL step in the backup process?()
A. Load differential tapeB. Verify backupC. Load new tapesD. Perform a full backup
考题
The claim for dead freight being a claim for damages for breach of contract,the Shipowner is under a duty,where the Charterer fails to load a full and complete cargo,______ the damage by obtaining other cargo,provided he acts reasonably in so doing.A.to minimizeB.minimizingC.minimizedD.have minimized
考题
You are on a multiple-product tanker and scheduled to load a cargo classed as an aromatic amine.This cargo is incompatible with cargoes classed as ______.A.organic anhydridesB.ketonesC.phenolsD.esters
考题
Cargo securing for Ro-Ro is based on the concept of _______.A.Solid packingB.Rapid loading and dischargeC.Vessel loaded full and down to her marksD.Palletized cargo
考题
If an electric cargo winch is being used to lift a draft of cargo and the engine room loses all power,which will occur ________.A.A pawl,forced by a spring mechanism,will engage the teeth of the bull gear and hold the loadB.An electromagnetic brake will hold the load where it is suspendedC.The load will fall rapidly to the deck unless the foot brake is engagedD.The load will slowly lower to the deck under control of the drag of the winch motor
考题
大副告诉装卸工人不要用钩子装袋装货。()A、The chief officer told the stevedores not to use hooks to load the deck cargo.B、The bosun told the stevedores not to use hooks to load the bagged cargo.C、The chief officer told the stevedores not to use hooks to load the bagged cargo.D、The bosun told the stevedores not to use hooks to load the deck cargo.
考题
Which of the following is the FINAL step in the backup process?()A、 Load differential tapeB、 Verify backupC、 Load new tapesD、 Perform a full backup
考题
单选题If the moisture content of the cargo sample is()the Transportable Moisture Limit,then the cargo should be safe to load.A
aboveB
belowC
equal toD
uncertain
考题
单选题杂货船可以用自己的吊杆装卸货物。()A
General cargo ships may load and discharge by her own winch.B
Bulk carriers may handle cargo by her own derricks.C
General cargo ships may load and discharge by her own derricks.D
General cargo ships may load and discharge by cranes.
考题
单选题The foreman said three ()would come on board to load cargo.A
teamsB
partiesC
gangsD
pairs
考题
单选题The load line certificate is issued by().A
CCSB
the National Cargo BureauC
MSAD
PRC Customs
考题
单选题The term "load on top" is used on many crude oil carriers, is to provide a method for ().A
calculating the ullage in the cargo tanksB
loading ballast by gravityC
the loading of new cargo into the slop tank as a procedure to minimize pollutionD
calculating the ratio of cargo expansion in a cargo tank
考题
单选题The force acting on a single cargo runner which is vertically lifting or lowering a load is greatest when().A
decelerating when lowering the loadB
decelerating when raising the loadC
lowering the load at constant speedD
raising the load at constant speed
考题
单选题Cargo securing for Ro-Ro is based on the concept of().A
solid packingB
rapid loading and dischargeC
vessel loaded full and down to her marksD
palletized cargo
考题
单选题It is not the Charterer’s duty that().A
he must procure a cargo and bring it alongside the vesselB
he must load a full and complete cargoC
he must load in the time stipulatedD
he must have the vessel tightly secured to the quay where the loading is to take place
考题
单选题Which of the following is the FINAL step in the backup process?()A
Load differential tapeB
Verify backupC
Load new tapesD
Perform a full backup
考题
单选题大副告诉装卸工人不要用钩子装袋装货。()A
The chief officer told the stevedores not to use hooks to load the deck cargo.B
The bosun told the stevedores not to use hooks to load the bagged cargo.C
The chief officer told the stevedores not to use hooks to load the bagged cargo.D
The bosun told the stevedores not to use hooks to load the deck cargo.
考题
单选题A ()is at the end of the cargo runner for picking up the load.A
slingB
hookC
blockD
tackle
考题
单选题Which of the following statements is correct regarding a turbocharged four-stroke/cycle diesel generator?()A
At zero load the intake manifold pressure is greater than the exhaust manifold pressureB
At full load the intake manifold pressure and exhaust manifold pressure are equalC
At full load the intake manifold pressure is less than the exhaust manifold pressureD
At full load the intake manifold pressure is greater than the exhaust manifold pressure
考题
单选题A clause in the charter party requires a vessel’s owner to pay dispatch money when the vessel ().A
changes berths to expedite loading or dischargingB
does not load and discharge its cargo in the time specifiedC
is not ready to load or discharge cargoD
loads and discharges its cargo in less time than specified
考题
单选题In a general cargo crane, () is fitted to lift the cargo load.A
the slewing motorB
the luffing motorC
the hoisting motorD
none of the above
考题
单选题In the absence of exceptions clauses,there is()obligation to supply a cargo of the contractual description and quantity.A
a conditionalB
an absoluteC
a considerableD
a substantial
考题
单选题The use of containers will make the cargo-handling safer if()that the man-hours of exposure to risk will decrease.A
for the other reasonB
for the other reason thanC
not for the reasonD
only for the reason
热门标签
最新试卷