网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The steam boiler is part of a closed loop steam, whereby, after the energy of the steam is used up and it becomes water again, () is collected and returned back to the boiler for heating up again to steam.
A

the former

B

the first

C

the latter

D

the last


参考答案

参考解析
解析: 暂无解析
更多 “单选题The steam boiler is part of a closed loop steam, whereby, after the energy of the steam is used up and it becomes water again, () is collected and returned back to the boiler for heating up again to steam.A the formerB the firstC the latterD the last” 相关考题
考题 The fuel supply system to an automatic auxiliary boiler, will be automatically shutdown if the boiler() A.salinity is abnormallyB.high steam demand is tooC.feed-water flow is lowD.water level is abnormally low

考题 If the feed pump for an auxiliary boiler fails to deliver the feed water to the boiler, the cause may be ______.A.high steam pressure in the boilerB.abnormally high feed-water temperatureC.abnormally high boiler water temperatureD.steam demand exceeding feed pump capacity

考题 In ______ the control action is independent on the output.A.a closed loop control systemB.an open loop control systemC.a boiler control systemD.a steering gear control system

考题 单选题When lighting off an auxiliary boiler, which of the problems listed could cause the burners to sputter?()A cold fuel oilB low fuel oil pressureC low atomizing steam pressureD water in the fuel oil

考题 单选题Before starting a reciprocating, steam-driven pump that has been idle for a period of time, you should ().A open the steam line mot valveB drain the steam cylinderC close the steam cylinder drainsD open the liquid cylinder drains

考题 单选题The steam boiler is part of a closed loop steam, whereby, after the energy of the steam is used up and it becomes water again, () is collected and returned back to the boiler for heating up again to steam.A the formerB the firstC the latterD the last

考题 单选题What is NOT a function of the steam drum of a marine water-tube boiler().A Receives saturated steam from the generating tubesB Serves as a reservoir of boiler feed waterC Holds internal fittings for separation of moisture from steamD Collects steam exhausted from the turbines

考题 单选题The purpose of the safety relief valves installed on an auxiliary boiler is to ().A relieve excess fuel oil pressure during the “off” fire cycleB admit water to the dry pipeC throttle the forced draft fan output for proper combustionD reduce excess steam pressure in the boiler

考题 单选题Waterside scale in a fire-tube boiler may cause ().A increased heat transferB fireside erosionC high steam demandD overheated tubes

考题 单选题In an auxiliary boiler steam and water system, the highest pressure will be in the ().A steam stop valveB dry pipeC feedwater systemD generating tubes

考题 单选题A () boiler is an auxiliary boiler sometimes included in a steamships installation for supplying steam to auxiliaries in port.A monkeyB donkeyC waste heatD main

考题 单选题Ignition failure in an automatically controlled auxiliary boiler could be caused by()A carbon deposits on the flame scannerB high fuel oil temperatureC low fuel oil viscosityD high steam pressure

考题 单选题A feed pump for an auxiliary boiler might lose suction if the ().A boiler water level is lowB feedwater is too hotC boiler steam demand is lowD feedwater is too cold

考题 单选题In () the control action is independent on(of) the output.A a closed loop control systemB an open loop control systemC a boiler control systemD a steering gear control system

考题 单选题In ()the control action is independent on the output.A a closed loop control systemB an open loop control systemC a boiler control systemD a steering gear

考题 单选题The boiler feed pump discharge pressure is higher than the steam drum pressure to ().A ensure feed water flow into the boilerB keep the steam drum pressure highC prevent water hammer in the feed lineD help the feed water flash to steam

考题 单选题Water level controllers of the boiler must be kept operable to protect external steam-using plant from water “()” danger.A carry offB carry downC carry onD carry over

考题 单选题The water level in a steaming auxiliary boiler will always ()A rise when the steam pressure is increasedB remain constant as long as the feed pump operatesC fall when the steam pressure is decreasedD vary as the steam demand changes

考题 单选题() should be tested and adjusted when the boiler survey is carried out.A The boiler oil tankB The steam pipeC The fire sideD The safety valves

考题 单选题(), iea steam cooler, may be filled in the boiler system to control the superheated steam temperature.A An economizerB An attemperatorC A water dramD A down-comer tube

考题 单选题Foaming in the steam drum may be caused by () in a boiler.A oxygen in the waterB poor boiler designC density too highD excessive steam demand

考题 单选题The boiler is fired () the demand for steam exceeds that available from exhaust gas heating.A wheneverB howeverC whereverD whether

考题 单选题When steam is being raised on a boiler, the water level will normally ().A drop as the boiler warms upB rise as the boiler warms upC remain unchanged until the boiler is hot enoughD rise and fall with the steam demand

考题 单选题If the feed pump for an auxiliary boiler fails to deliver the feed water to the boiler, the cause maybe ().A high steam pressure in the boilerB abnormally high feed water temperatureC abnormally high boiler water temperatureD steam demand exceeding feed pump capacity

考题 单选题Prior to lighting off a cold automatically fired auxiliary boiler, you should ().A check and regulate the water levelB close the air cock once fires are litC blowdown the gage glassD crack the steam stop to assure protective steam flow