A technician has found that the uninterruptible power supply (UPS) connected to a server does not have sufficient battery power to allow the server to shutdown gracefully. Which of the following is the MOST cost effective way to allow this server to shutdown gracefully?()
A

Install a second UPS.

B

Increase the size of the swapfile.

C

Increase the size of the pagefile.

D

Install an extended battery pack into the UPS


参考答案

参考解析
解析: 暂无解析
更多 “单选题A technician has found that the uninterruptible power supply (UPS) connected to a server does not have sufficient battery power to allow the server to shutdown gracefully. Which of the following is the MOST cost effective way to allow this server to shutdown gracefully?()A Install a second UPS.B Increase the size of the swapfile.C Increase the size of the pagefile.D Install an extended battery pack into the UPS” 相关考题
考题 Which of the following is the MOST important physical consideration when deploying a new server?() A. Humidity monitors, Biometrics, and fire suppressionB. Cooling, rack space, and power requirementsC. Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD. Biometrics, fire suppression, and power requirements

考题 An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?() A. Verify uninterruptible power supply (UPS) loadB. Verify if server consumes 220VC. Verify CPU loadD. Verify if server consumes 110V

考题 An administrator has a malfunctioning uninterruptible power supply (UPS). Which of the following is the MOST likely cause of the problem?() A. Battery needs to be replacedB. Light switch is turned offC. Smart cable is disconnectedD. UPS needs a firmware update

考题 A technician turns on a PC and before the computer boots up, the technician is prompted for apassword. The technician does not know the password. Which of the following can the techniciando to allow access to the PC?() (Select TWO).A、Set the clear password jumper on the motherboardB、Enter the BIOS setup and select the clear password settingC、Remove the power cord from the power supply and then plug it back inD、Power cycle the PCE、Remove the CMOS battery for 15 minutes

考题 Which of the following is the MOST likely to cause a server power supply fan to fail but allows the power supply to still be functional?()A、DustB、Power SurgeC、Excessive humidityD、High temperatures

考题 An administrator is working on a rack mount server with all newly installed equipment. Theuninterruptible power supply (UPS) in the rack starts beeping loudly. Which of the following is the FIRST troubleshooting step that should be taken?()A、Ensure that the power cable for the UPS is plugged in.B、Ensure the battery in the UPS is still good.C、Check the smart cable connecting the UPS to the server.D、Reset the UPS to determine if the problem persists.

考题 Which of the following should be kept in uninterruptible power supply (UPS) documentation records?()A、 Antivirus software versionB、 Battery replacement dateC、 Wire shelving diagramD、 IP address for network printerE、 Shutdown delay timing

考题 A Windows server has rebooted by itself several times.There are several functioning non-Windows servers in the same rack that are connected to the same uninterruptible power supply(UPS).Which of the following is the MOST likely cause of the reboots?()A、The UPS is malfunctioning.B、The user traffic to the server is too high.C、A BSOD is occurring.D、The non-Windows servers cannot be located on the same UPS as the Windows server.

考题 A technician has found that the uninterruptible power supply (UPS) connected to a server does not have sufficient battery power to allow the server to shutdown gracefully. Which of the following is the MOST cost effective way to allow this server to shutdown gracefully?()A、Install a second UPS.B、Increase the size of the swapfile.C、Increase the size of the pagefile.D、Install an extended battery pack into the UPS

考题 An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()A、 Verify uninterruptible power supply (UPS) loadB、 Verify if server consumes 220VC、 Verify CPU loadD、 Verify if server consumes 110V

考题 An administrator has a malfunctioning uninterruptible power supply (UPS). Which of the following is the MOST likely cause of the problem?()A、Battery needs to be replacedB、Light switch is turned offC、Smart cable is disconnectedD、UPS needs a firmware update

考题 Which of the following factors is the MOST important to consider when choosing an uninterruptible power supply (UPS) for a single server? ()A、 UPS form factorB、 Server form factorC、 Server power supplys wattage ratingD、 Desired runtime

考题 Which of the following is the MOST important physical consideration when deploying a new server?()A、 Humidity monitors, Biometrics, and fire suppressionB、 Cooling, rack space, and power requirements冷C、 Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD、 Biometrics, fire suppression, and power requirements

考题 Which of the following is the MOST important physical consideration when deploying a new server?()A、Humidity monitors, Biometrics, and fire suppressionB、Cooling, rack space, and power requirementsC、Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD、Biometrics, fire suppression, and power requirements

考题 A technician is responsible for overseeing twelve remote offices. There was a report of a power outage at one of the remote offices the night before, and now one of the servers there has not rebootedeven though it was shut down gracefully. The technician was forced to travel two hours just to turn theserver on.  Which of the following is the MOST cost effective way to prevent future travel?()A、 Install a generator onsite.B、 Install a remote management card in the server.C、 Install an uninterruptible power supply (UPS) onsite.D、 Move the server to the main office.

考题 单选题A technician is building a Windows 2008 server and has installed a motherboard, processor, and power supply. Which of the following optical drives should the technician install?()A Flash DriveB DVD-RWC CD-ROMD SSD

考题 单选题A technician is responsible for overseeing twelve remote offices. There was a report of a power outage at one of the remote offices the night before, and now one of the servers there has not rebootedeven though it was shut down gracefully. The technician was forced to travel two hours just to turn theserver on.  Which of the following is the MOST cost effective way to prevent future travel?()A  Install a generator onsite.B  Install a remote management card in the server.C  Install an uninterruptible power supply (UPS) onsite.D  Move the server to the main office.

考题 单选题An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()A  Verify uninterruptible power supply (UPS) loadB  Verify if server consumes 220VC  Verify CPU loadD  Verify if server consumes 110V

考题 单选题An administrator is working on a rack mount server with all newly installed equipment. Theuninterruptible power supply (UPS) in the rack starts beeping loudly. Which of the following is the FIRST troubleshooting step that should be taken?()A Ensure that the power cable for the UPS is plugged in.B Ensure the battery in the UPS is still good.C Check the smart cable connecting the UPS to the server.D Reset the UPS to determine if the problem persists.

考题 单选题Which of the following is the MOST important physical consideration when deploying a new server?()A  Humidity monitors, Biometrics, and fire suppressionB  Cooling, rack space, and power requirements冷C  Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD  Biometrics, fire suppression, and power requirements

考题 单选题An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()A Verify uninterruptible power supply (UPS) loadB Verify if server consumes 220VC Verify CPU loadD Verify if server consumes 110V

考题 单选题A Windows server has rebooted by itself several times.There are several functioning non-Windows servers in the same rack that are connected to the same uninterruptible power supply(UPS).Which of the following is the MOST likely cause of the reboots?()A The UPS is malfunctioning.B The user traffic to the server is too high.C A BSOD is occurring.D The non-Windows servers cannot be located on the same UPS as the Windows server.

考题 单选题Which of the following factors is the MOST important to consider when choosing an uninterruptible power supply (UPS) for a single server? ()A  UPS form factorB  Server form factorC  Server power supplys wattage ratingD  Desired runtime

考题 单选题Which of the following is the MOST likely to cause a server power supply fan to fail but allows the power supply to still be functional?()A DustB Power SurgeC Excessive humidityD High temperatures

考题 单选题There is a power outage and all servers are shut down properly by the uninterruptible power supply (UPS) software. When one of the servers starts up it displays a logical drive failed error. This server has two processors, 16GB of memory, and a RAID 5 array with 10 drives. Which of the following is the MOST likely cause?()A A failed RAID controllerB Two failed processorsC Two failed sticks of memoryD Two failed drives

考题 单选题Which of the following is the MOST important physical consideration when deploying a new server?()A Humidity monitors, Biometrics, and fire suppressionB Cooling, rack space, and power requirementsC Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD Biometrics, fire suppression, and power requirements

考题 单选题An administrator has a malfunctioning uninterruptible power supply (UPS). Which of the following is the MOST likely cause of the problem?()A  Battery needs to be replacedB  Light switch is turned offC  Smart cable is disconnectedD  UPS needs a firmware update