网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Any oil tanker which is not required to be provided with segregated ballast tanks in accordance with this paragraph may,however,be qualified as a segregated ballast tanker ()it complies with the other requirements of paragraphs of this Convention.
A

provided that

B

on the part of

C

nevertheless

D

notwithstanding


参考答案

参考解析
解析: 暂无解析
更多 “单选题Any oil tanker which is not required to be provided with segregated ballast tanks in accordance with this paragraph may,however,be qualified as a segregated ballast tanker ()it complies with the other requirements of paragraphs of this Convention.A provided thatB on the part ofC neverthelessD notwithstanding” 相关考题
考题 A shipboard oil pollution emergency plan is required of ______.A.all vessels, regardless of size and commercial applicationB.any barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboardC.an oil tanker of 150 gross tons or above, or other ship of 400 gross tons or aboveD.an oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above

考题 Oil slick caused by spillage of oil from tanker ship is ______.A.a drop of oilB.the emulsion of oil at sea surfaceC.the weathered oilD.the oil floating on the surface of the sea water

考题 The tanker has in operation,except as provided for in Regulation 15(5) and (6) of Annex A of MARPOL 73/78,an oil discharge monitoring and control system and ______ as required.A.an IGSB.a scriberC.a P/VD.a slop tank arrangement

考题 An oil tanker,except as provided for otherwise,might discharge certain amount at certain rate of oil or oily mixtures into sea when ______.A.she is not within a special areaB.she is within a special areaC.she has just departured from a special areaD.she is about to enter a special area

考题 Unless such oil tanker carries crude oil which is not suitable for crude oil washing,the oil tanker shall ______ the system in accordance with the requirements of that Regulation.A.operateB.checkC.installD.overhaul

考题 The oil transfer procedures aboard a tanker transferring oil are NOT required to contain ______.A.The name of each person designated as the person in charge of transferB.A line diagram of the vessel's oil transfer pipingC.Special procedures for topping off tanksD.A description of the deck discharge containment system

考题 What is NOT required to be contained in the oil transfer procedures ________.A.A line diagram of the vessel's oil transfer pipingB.The number of persons on duty during oil transfer operationsC.Any special procedures for topping off tanksD.The location and capacity of all fuel and cargo tanks on the vessel

考题 材料:Every new crude oil tanker of 20000 tons deadweight and above shall be fitted with a cargo tank cleaning system using crude oil washing.The Administration shall undertake to ensure that the system fully complies with the requirements of MARPOL within one year after the tanker was first engaged in the trade of carrying crude oil or by the end of the third voyage carrying crude oil suitable for crude oil washing,whichever occurs later.Unless such oil tanker carries crude oil which is not suitable for crude oil washing,the oil tanker shall operate the system in accordance with the requirements of that Regulation.Every existing crude oil tanker of 40000 tons deadweight and above shall be provided with segregated ballast tanks.Existing crude oil tankers may,in lieu of being provided with segregated ballast tanks,operate with a cargo tank cleaning procedure using crude oil washing unless the crude oil tanker is intended to carry crude oil which is not suitable for crude oil washing.Existing crude oil tankers may,in lieu of being provided with segregated ballast tanks or operating with a cargo tank cleaning procedure using crude oil washing,operate with dedicated clean ballast tanks in accordance with the provision of Regulation 13A of this Annex for the following period:for crude oil tankers of 70 000 tons deadweight and above,until two years after the date of entry into force of the present Convention;and for crude oil tankers of 40000 tons deadweight and above but below 70 000 tons deadweight,until four years after the date of entry into force of the present Convention.问题:A new crude oil tanker of 30000 tons deadweight shall ________.A.be fitted with crude oil washing systemB.operate dedicated clean ballast tanksC.be fitted with segregated ballast tanksD.be fitted with washing system other than crude oil washing systemExcept________,the existing crude oil tankers may operate with any of the following installations.A.segregated ballast tanksB.cargo tank cleaning procedure using crude oil washingC.operate with dedicated clean ballast tanksD.protection positionThe latest date for an existing crude oil tanker of 60000 tons deadweight to install dedicated clean ballast tanks is ________.A.until two years after the date of entry into force of the present ConventionB.until four years after the date of entry into force of the present ConventionC.within one year after the tanker was first engaged in the trade of carrying crude oilD.by the end of the third voyage carrying crude oilIt is inferred that ________.A.all oil tankers,both the newly built and existing ones,shall be fitted with a cargo tank cleaning system using crude oil washingB.a new crude oil tanker of 20 000 tons deadweight and above may,in lieu of being provided with crude oil washing system,operate with segregated ballast tanksC.a new crude oil tanker of 20 000 tons deadweight and above may,in lieu of being provided with crude oil washing system,operate with dedicated clean ballast tanksD.a new crude oil tanker of 20 000 tons deadweight and above shall not be fitted with a cargo tank cleaning system using crude oil washing immediately after her entry in the trade of carrying crude oil请帮忙给出每个问题的正确答案和分析,谢谢!

考题 材料:Every new crude oil tanker of 20000 tons deadweight and above and every new product carrier of 30000 tons deadweight and above shall be provided with segregated ballast tanks.The capacity of the segregated ballast tanks shall be so determined that the ship may operate safely on ballast voyages without recourse to the use of cargo tanks for water ballast.In all cases,however,the capacity of segregated ballast tanks shall be at least such that,in any ballast condition at any part of the voyage,including the conditions consisting of lightweight plus segregated ballast only,the ship’s draughts and trim can meet each of the following requirements:(a)The moulded draught amidships(dm)meters(without taking into account any ships deformation)shall not be less than dm = 2.0 + 0.02L;(b)The draughts at the forward and after perpendiculars shall correspond to those determined by the draught amidships(dm)as specified in sub-paragraph(a)of this paragraph,in association with the trim by the stern of not greater than 0.015L;and(c)In any case the draught at the after perpendicular shall not be less than that which is necessary to obtain full immersion of the propeller.In no case shall ballast water be carried in cargo tanks,except on those rare voyages when weather conditions are so severe that,in the opinion of the master,it is necessary to carry additional ballast water in cargo tanks for the safety of the ship,or,in exceptional cases where the particular character of the operation of an oil tanker renders it necessary to carry ballast water in excess of the quantity required,provided that such operation of the oil tanker falls under the category of exceptional cases as established by the Organization.问题:According to this passage,it is inferred that ________.A.the crude oil is more pollutive than the productB.the crude oil is less pollutive than the productC.the crude oil and the product are equally pollutiveD.it can not tell whether the crude oil or the product is more pollutiveBallast water ________ carried in cargo tanks on board of oil tankers.A.can beB.can not beC.can not,absolutely,beD.can,only in rare or exceptional cases,beThis passage is most likely extracted from ________.A.Guide to Port EntryB.Notices to MarinersC.SOLASD.MARPOLAssuming the length of a crude oil tanker is 200m,her max aft draft corresponding to her displacement of lightweight plus segregated ballast only should be ________.A.3mB.4.5mC.6mD.7.5m请帮忙给出每个问题的正确答案和分析,谢谢!

考题 材料:The crude oil washing installation and associated equipment and arrangements shall comply with the requirements established by the Administration.Such requirements shall contain at least all the provisions of Specifications for the Design,Operation and Control of Crude Oil Washing Systems adopted by the International Conference on Tanker Safety and Pollution Prevention,1978,in Resolution 15 and as may be revised by the Organization.An inert gas system shall be provided in every cargo tank and slop tank in accordance with the appropriate Resolutions of Chapter II-2 of SOLAS.With respect to the ballasting of cargo tanks,sufficient cargo tanks shall be crude oil washed prior to each ballast voyage in order that,taking into account the tankers trading pattern and expected weather conditions,ballast water is put only into cargo tanks which have been crude oil washed. Every oil tanker operating with crude oil washing systems shall be provided with an Operations and Equipment Manual detailing the system and equipment and specifying operational procedures.Such a Manual shall be to the satisfaction of the Administration and shall contain all the information set out in the Specifications referred to in this Regulation.If an alteration affecting the crude oil washing system is made,the Operations and Equipment Manual shall be revised accordingly.问题:According to this passage,with respect to the ballasting of cargo tanks,ballast water is put only into ________.A.slop tanks which have been cleaned with waterB.gas freed cargo tanksC.inertized cargo tanksD.cargo tanks which have been crude oil washed________ shall be approved by the Administration.A.Specifications for the Design,Operation and Control of Crude Oil Washing SystemsB.Appropriate Resolutions of Chapter II-2 of SOLASC.An Operations and Equipment Manual detailing the crude oil washing system and equipment and specifying operational proceduresD.International Conference on Tanker Safety and Pollution Prevention,1978This paragraph is most likely extracted from________.A.MARPOL 73/78B.SOLASC.IBCD.IGCIt can be concluded that ________.A.it is not necessary to do crude oil washing prior to ballast voyageB.taking into account the tanker's trading pattern and expected weather conditions,it is sometimes necessary to do crude oil washing after each ballast voyageC.if it is possible ballast water shall always be put into cargo tanks prior to commencing their crude oil washing operationsD.sufficient cargo tanks shall be crude oil washed prior to each ballast voyage in order that the tanker could be kept properly ballasted without breaking any regulations in connection with ballasting of cargo tanks请帮忙给出每个问题的正确答案和分析,谢谢!

考题 A 35000 ton product oil tanker will be delivered in a few days, as a surveyor, you go on board for finally confirming the documentations required by SOLAS, which shall be equipped on board. Which of them as below are correct:()A、Fire control planB、Muster list and Emergency proceduresC、Nautical publicationsD、International code of signals and Inmarsat manualE、Training manual

考题 多选题A 35000 ton product oil tanker will be delivered in a few days, as a surveyor, you go on board for finally confirming the documentations required by SOLAS, which shall be equipped on board. Which of them as below are correct:()AFire control planBMuster list and Emergency proceduresCNautical publicationsDInternational code of signals and Inmarsat manualETraining manual

考题 单选题Which of the following operations aboard a tanker must be recorded in the Oil Record Book ()A Any internal transfer of oil cargo during a voyageB The discharge overboard in port or at sea of any bilge water accumulated in machinery spacesC The loading or unloading of any or all oil cargoD All of the above

考题 单选题Ballast water can only be()in cargo tanks in exceptional cases where the particular character of the operation of an oil tanker renders it necessary to carry ballast water in excess of the quantity required,provided that such operation of the oil tanker falls under the category of exceptional cases as established by the Organization.A carriedB containedC filledD stuffed

考题 单选题Which of the listed diesel engine operating conditions should be checked immediately after any diesel engine is started?()A Exhaust temperatureB Lube oil levelC Lube oil pressureD Water level in the expansion tank

考题 单选题A shipboard oil pollution emergency plan is required of ().A all vessels, regardless of size and commercial applicationB any barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboardC an oil tanker of 150 gross tons or above, or other ship of 400 gross tons or aboveD an oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above

考题 单选题A shipboard Oil Pollution Emergency Plan is required of().A all vessels,regardless of size and commercial applicationB any barge or ship constructed or operated in such a manner that no oil in any form can be carried aboardC an oil tanker of 150 gross tons and above,or other ship of 400 gross tons and aboveD an oil tanker of 400 gross tons and above,or other ships of 150 gross tons and above

考题 单选题Oil Record Book Part I shall be provided to every oil tanker of 150 tons gross tonnage and above and every ship of 400 tons gross tonnage and above, () oil tankers, to record relevant machinery space operations.A as well asB as long asC rather thanD other than

考题 单选题An oil tanker,except as provided for otherwise,might discharge certain amount at certain rate of oil or oily mixtures into sea when().A she is not within a special areaB she is within a special areaC she has just departured from a special areaD she is about to enter a special area

考题 单选题Except as provided for otherwise,an oil tanker might discharge certain amount at certain rate of oil or oily mixtures into sea when().A the tanker is within 50 nautical miles from the nearest landB the tanker is no more than 50 nautical miles from the nearest landC the tanker is more than 50 nautical miles from the nearest landD the tanker is not more than 50 nautical miles from the nearest land

考题 单选题Which is a mandatory section of the shipboard Oil Pollution Emergency Plan().A Reporting requirementsB Removal equipment listC Planned exercisesD List of individuals required to respond

考题 单选题() shall be provided to every oil tanker of 150 tons gross tonnage and above to record relevant machinery space and cargo/ballast operations.A Oil Record Book Part ⅠB Oil Record Book Part ⅡC Oil Record Book Part Ⅰ or Part ⅡD Oil Record Book Part Ⅰ and Part Ⅱ

考题 单选题Which list is NOT required to be provided as part of the appendices of the Shipboard Oil Pollution Emergency Plan?()A A list of agencies or officials of Coastal State Administrators responsible for receiving and processing incident reportsB A list of agencies or officials in regularly visited portsC A list specifying who will be responsible for informing the parties listed and the priority in which they must be notifiedD A list of personnel duty assignments

考题 单选题Sufficient cargo tanks shall be()prior to each ballast voyage in order that,taking into account the tanker’s trading pattern and expected weather conditions,ballast water is put only into cargo tanks which have been crude oil washed.A inertedB crude oil washedC gas freedD batterned down

考题 单选题Fuel oil transfer systems used onboard diesel propelled vessels are required to have ().A two fuel oil transfer pumps provided where one is to be independent of the main engineB two fuel oil transfer pumps, with a combined capacity exceeding the maximum consumption of the main engineC engine driven transfer pumps and only used in constant speed applicationsD the capacity of the engine driven pump exceed the consumption rate of the engine to which it is attached

考题 单选题Every()shall be fitted with a cargo tank cleaning system using crude oil washing.A existing crude oil tanker of 20000 tons deadweight and underB new crude oil tanker of 20000 tons deadweight and underC existing crude oil tanker of 20000 tons deadweight and aboveD new crude oil tanker of 20000 tons deadweight and above

考题 单选题Every new crude oil tanker of 20000 tons deadweight and above and every new product carrier of 30000 tons deadweight and above shall be provided with().A segregated ballast tanksB moulded draught measurement systemC additional ballast water systemD dedicated clean ballast tanks system