Which tool is available for IBM BladeCenter that allows the direct power monitoring by IBM Systems Director 6.2 through the AMM?()
A
PowerExecutive
B
Active Energy Manager (AEM)
C
Tivoli Provisioning Manager (TPM)
D
Energy Monitoring and Control (EMC)
参考答案
参考解析
解析:
暂无解析
更多 “单选题Which tool is available for IBM BladeCenter that allows the direct power monitoring by IBM Systems Director 6.2 through the AMM?()A PowerExecutiveB Active Energy Manager (AEM)C Tivoli Provisioning Manager (TPM)D Energy Monitoring and Control (EMC)” 相关考题
考题
单选题A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?()A
6B
8C
10D
12
考题
单选题A customer has successfully upgraded their System x servers. Now the are very concerned about their applications. They have a historical collection of various applications that do not interact. Which of the following should the sales professional suggest?()A
Rewrite applications using Linux to limit licensing feesB
Port applications toanAIX or UNIX server to conserve energy and floor spaceC
SAP or similar all encompassing applicationsD
Webenable all applications
考题
单选题Which of the following is a management strategy of iDataPlex?()A
IBM Systems Director manages all components as single imageB
Rack Management Appliance manages the homogeneous imageC
HMC manages dissimilar componentsD
Tivoli Provisioning Manager (TPC) manages all components as single image
考题
单选题A client’s CIO validates that IBM proposed virtualization/consolidation solution addresses their key pain points. However, the CFO is more concerned with risk mitigation as a result of the new economic environment and has delayed the deal indefinitely. Which of the following strategies is the best way to address this situation?()A
Modify the deployment schedule of the solution over an extended period of time to reduce the initial cash outlay.B
Gain the CFO’s agreement to revisit the solution next quarter and follow-up with an aggressively priced solution.C
Present financing options to the CFO showing how to implement the solution while minimizing the monthly cash outlay.D
Meet with the CFO to demonstrate the financial impact of the solution to reduce operational expenses and TCO
考题
单选题A retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere. Which of the following should be discussed with this customer?()A
Consider two servers for redundancy and failoverB
Web content static or dynamic informationC
Processor utilization of the existing web serversD
SCSI orFibre Channel storage solution
考题
单选题A customer is considering BladeCenter H and S chassis. Which of the following is a reason to implement BladeCenter H?()A
Support for10Gb internal networkB
Support for SSDC
Support for integrated disk drivesD
Support for8Gb FC Switch Modules
考题
单选题A IBM Director V5 customer is considering Systems Director V6 and updating their BladeCenter servers. The sales professional is asked how BladeCenter Configuration Manager works with Director V6. Which of the following is correct?()A
This was replaced by Configuration Manager for V6B
This must be upgraded toBladeCenter Open Fabric Manager (BOFM) for V6C
Automation Manager must be used with Director V6D
This is common to both V5 and V6, no change is required
考题
单选题A customer asks the sales professional how to update the UEFI on the HX5. They do not want to use AMM. Which is the procedure of the following?()A
InstallServerGuide CD/DVD,boot the HX5 blade and follow the promptsB
Boot the blade from the HX5 Bootable Media Creator (BoMC) and follow the promptsC
Press F1 while the HX5 is booting,incert the CD/DVD and select OKD
Mount the IMM virtual disk