网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
What restrictions apply to using virtual Ethernet within a cluster containing VIO clients?()
A
IPAT via Aliasing must be used
B
IPAT via Replacement must be used
C
Resilience must be provided by the use of dual VIO servers
D
Hardware Address Takeover (HWAT) must be used to ensure a consistent virtual MAC address
参考答案
参考解析
解析:
暂无解析
更多 “单选题What restrictions apply to using virtual Ethernet within a cluster containing VIO clients?()A IPAT via Aliasing must be usedB IPAT via Replacement must be usedC Resilience must be provided by the use of dual VIO serversD Hardware Address Takeover (HWAT) must be used to ensure a consistent virtual MAC address” 相关考题
考题
单选题What restrictions apply to using virtual Ethernet within a cluster containing VIO clients?()A
IPAT via Aliasing must be usedB
IPAT via Replacement must be usedC
Resilience must be provided by the use of dual VIO serversD
Hardware Address Takeover (HWAT) must be used to ensure a consistent virtual MAC address
考题
单选题What is the maximum number of nodes that can be configured in a single PowerHA cluster?()A
16B
32C
64D
128
考题
单选题An administrator is configuring an application monitor. Upon encountering an unrecoverable error the administrator does not want the resource group to failover. How can the application monitor be configured toachieve this?()A
Configure the application monitor with a restart count of 0B
Configure the application monitor with a monitor mode of NotifyC
Configure the application monitor with a notify method of MonitorD
Configure the application monitor with a failure action of Notify
考题
单选题Which additional application must be installed in order to use WebSMIT?()A
Mozilla for AIXB
An Apache compliant Web serverC
Web Based System Manager (WebSM)D
Websphere Application Server Community Edition
考题
单选题A customer has a resource group rg1 configured on a two node cluster with the following policies:The customer has observed the following scenarios as nodes join the cluster during cluster start up. Scenario 1 Node1 joins cluster as first node - rg1 is acquired by Node1 Node2 joins cluster as second node - rg1 ismoved from Node1 to Node2 Scenario 2 Node2 joins cluster as first node - rg1 is acquired by Node2 Node1 joins cluster as second node - rg1 remainson Node2 Which of the following is the reason for this behavior?()A
rg1 is configured with a delayed fallback timerB
Settling time policy has not been configured for rg1C
Node1 does not have sufficient resources to support rg1D
Node2 is the first in the ’Default Node Priority’ list for resource group rg1
考题
单选题An administrator is configuring a new cluster and has a requirement for a notification to be generated if the /tmp File System becomes greater than 90% full. Which of the following PowerHA components will support theadministrator’s requirement?()A
Pre-defined EventsB
User-defined EventsC
Remote notification methodsD
The integration between RMC and WebSM
考题
单选题An administrator is configuring an application monitor. Upon encountering an unrecoverable error the administrator does not want the resource group to failover. How can the application monitor be configured toachieve this?()A
Configure the application monitor with a restart count of 0B
Configure the application monitor with a monitor mode of NotifyC
Configure the application monitor with a notify method of MonitorD
Configure the application monitor with a failure action of Notify
考题
单选题An administrator is configuring cross-site LVM and wants to ensure that logical volume copies are always onseparate disks. When creating a new logical volume, how could the administrator ensure that this requirement is achieved?()A
Set the allocation policy to strictB
Set the allocation policy to superstrictC
Set the Maximum Number of Physical Volumes to 2D
Set the Number of Copies for each logical partition to 2
考题
单选题An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()A
Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2B
Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’C
Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.D
Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2
热门标签
最新试卷