网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
During storm conditions on a ship,the mooring tensions should be adjusted so that().
A

all mooring lines have a different tension

B

the leeward lines have higher tension than the windward lines

C

the maximum tension of the most heavily loaded line does not exceed the safe working load

D

all horizontal tension forces on the windward lines are no greater than the vertical tension forces


参考答案

参考解析
解析: 暂无解析
更多 “单选题During storm conditions on a ship,the mooring tensions should be adjusted so that().A all mooring lines have a different tensionB the leeward lines have higher tension than the windward linesC the maximum tension of the most heavily loaded line does not exceed the safe working loadD all horizontal tension forces on the windward lines are no greater than the vertical tension forces” 相关考题
考题 () the storm, the ship would have reached its destination on time. A. But forB. In spite ofC. In case ofD. Because of

考题 He found it difficult to _______ the fact that the ship was lost in a heavy storm. A.receiveB.obtainC.keepD.accept

考题 A storm is forecast for the area where your vessel is moored. For its safety you should put ______.A.more slack in the mooring linesB.a strain on the mooring linesC.chafing gear on the mooring linesD.grease on the mooring lines

考题 The dangerous semicircle of a hurricane in the Northern Hemisphere is that area of the storm ______.A.to the right of the storm's trackB.measured from true north clockwise to 180°TC.measured from true north counterclockwise to 180°TD.between the ship's heading and the bearing to the eye

考题 During a storm,the chance of fatigue failure of a mooring line will increase as ______.A.vessel motions increaseB.mooring tensions decreaseC.KG increasesD.KG decreases

考题 The ship changed its course because of there was a storm.A. changed B. course C. of D. a

考题 In Layer 2 topologies, spanning-tree failures can cause loops in the network. These unblocked loops can cause network failures because of excessive traffic. Which two Catalyst 6500 features can be used to limit excessive traffic during spanning-tree loop conditions? ()A、loop guardB、storm controlC、storm suppressionD、broadcast suppressionE、BPDU guard

考题 他们应该注意装卸货情况。()A、They should pay attention to the safety of the ship.B、They should pay attention to the rise and fall of tide.C、They should pay attention to the conditions of loading and unloading.D、They should pay attention to take care of the mooring lines.

考题 A ship is made fast to the quayside ()mooring lines.A、byB、toC、withD、for

考题 In Layer 2 topologies, spanning-tree failures can cause loops in the network. These unblocked loops cancause network failures because of excessive traffic. Which two Catalyst 6500 features can be used to limitexcessive traffic during spanning-tree loop conditions?()A、loop guardB、storm controlC、storm suppressionD、broadcast suppressionE、BPDU guard

考题 单选题While(),they met with a storm weather.A at seaB the ship was at seaC she was at seaD they w re at sea

考题 单选题Survival practice in the mooring system is to slack off the tensions on the leeward side and().A deballast the unit to transit draftB adjust as evenly as practical the windward tensionsC release the anchors on the windward sideD tighten the anchor buoys on the leeward side anchors

考题 单选题The dangerous semicircle of a hurricane in the Northern Hemisphere is that area of the storm ().A to the right of the storm's trackB measured from true north clockwise to 180°TC measured from true north counterclockwise to 180°TD between the ship's heading and the bearing to the eye

考题 单选题The distance from the still water level (corrected for tides and storm surge) to the bottom of the hull of a ship is the().A air gapB freeboardC penetrationD water depth

考题 单选题During storm conditions on a vessel,the mooring tensions should be adjusted so that().A all mooring lines have a different tensionB the leeward lines have higher tension than the windward linesC the maximum tension of the most heavily loaded line does not exceed the safe working loadD all horizontal tension forces on the windward lines are no greater than the vertical tension forces

考题 单选题In a storm,the windward lines of a ship’s mooring system provide().A a positive righting momentB an increase in KMC a negative restoring forceD a positive restoring force

考题 单选题()is put into use in the late years to maintain a preset tension in a mooring line after a ship has been tied up at a pier.A The large-tension mooringB The small-tension mooringC The variable-tension mooringD The constant-tension mooring

考题 单选题During a storm,the chance of fatigue failure of a mooring line will increase as().A vessel motions increaseB mooring tensions decreaseC KG increasesD KG decreases

考题 单选题In the constant-tension mooring, the mooring lines holding the ship to the pier will maintain a constant tension even with changes in tide or ship’s draft, ().A without the necessity of manually adjusting the linesB without the necessity of automatically adjusting the linesC with the necessity of manually adjusting the linesD with the un-necessity of automatically adjusting the lines

考题 单选题Which mooring line is likely to undergo the most strain when docking a ship under normal conditions?()A Bow lineB Breast lineC Spring lineD Stern line

考题 单选题During the voyage from Singapore, my vessel()No.9904 tropical storm.A metB sawC watchedD encountered

考题 单选题他们应该注意装卸货情况。()A They should pay attention to the safety of the ship.B They should pay attention to the rise and fall of tide.C They should pay attention to the conditions of loading and unloading.D They should pay attention to take care of the mooring lines.

考题 单选题A storm is forecast for the area where your vessel is moored. For its safety you should put ().A more slack in the mooring linesB a strain on the mooring linesC chafing gear on the mooring linesD grease on the mooring lines

考题 单选题What kind of conditions would you observe as the eye of a storm passes over your ship’s position().A Huge waves approaching from all directions,clearing skies,light winds,and an extremely low barometerB Flat calm seas,heavy rain,light winds,and an extremely low barometerC Flat calm seas,heavy rain,light winds,and high pressureD Huge waves approaching from all directions,clearing skies,light winds,and high pressure

考题 单选题The line-throwing appliance provided on board ship is().A for the saving of lifeB for fire-fightingC for mooring purposeD for towing purpose

考题 单选题A ship is made fast to the quayside ()mooring lines.A byB toC withD for

考题 单选题In a storm,the leeward lines of a ship’s mooring system will().A pull the unit in the same direction that the weather is pushing itB pull the unit in the opposite direction that the weather is pushing itC tend to keep the unit on its original location over the well headD affect the unit's draft and inclination as maximum mooring tensions are reached