网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

The ()(千斤滑车) can run the gooseneck.

  • A、heavy derrick
  • B、pulley block
  • C、topping lift block
  • D、guy tackle

参考答案

更多 “The ()(千斤滑车) can run the gooseneck.A、heavy derrickB、pulley blockC、topping lift blockD、guy tackle” 相关考题
考题 Stress on the topping lift of a swinging boom can be reduced by ______.A.rigging a back stayB.raising the boomC.increasing the mechanical advantage of the cargo purchaseD.taking all slack out of the preventer

考题 A band or collar on top end of a boom to which the topping lift, midships guy, and outboard guys are secured, is called the ______.A.collar bandB.guy bandC.pad eye collarD.spider band

考题 A block that can be opened at the hook or shackle end to receive a bight of the line is a _____.A.bight blockB.gin blockC.heel blockD.snatch block

考题 topping lift()A、千斤索B、定位滑车C、稳索D、千斤顶

考题 The jumbo boom can ().A、lift heavy cargoB、load and unloadC、join ropes togetherD、lift light cargo

考题 A ()is used for lifting long heavy cargo.A、derrickB、craneC、jumbo boomD、boom

考题 The ()(双杆联吊) is that two booms are used with a single hook.A、derrickB、union purchaseC、topping lift blockD、crane

考题 The()(千斤索) is a wire used to take the weight off.A、light derrickB、union purchaseC、topping liftD、heavy derrick

考题 A ()is at the end of the cargo runner for picking up the load.A、slingB、hookC、blockD、tackle

考题 The parts of the derrick are: derrick boom rest, gooseneck, center guy, stay, topping lift, topping lift block and so on.()A、吊杆的部件有:吊杆支架、鹅颈头、中心稳索、支索、千斤索和千斤索滑车组等。B、吊杆的部件有:鹅颈头、中心稳索、千斤索、侧稳索、千斤索滑车组和支索等。C、吊杆的部件有:中心稳索、侧稳索、吊杆支架、鹅颈头、千斤索、和千斤索滑车组等。D、吊杆的部件有:侧稳索、中心稳索、鹅颈头、吊杆支架、千斤索、和千斤索滑车组等。

考题 顶部滑车()A、heel blockB、head blockC、cargo blockD、lead block

考题 The ()(重吊杆) can lift heavy cargo.A、heavy cargo derrickB、heavy deckC、jumbo boomD、heavy block

考题 双层底()A、heavy derrickB、single tankC、double tankD、double bottom

考题 There is no power for the ().A、derrickB、winchC、blockD、heavy derrick

考题 起重机()A、derrickB、heavy derrickC、craneD、boom

考题 What is the disadvantage for air transportation? ()A、Quick but not safeB、Less frequencyC、It can’t lift heavy goodsD、The highest cost in all transport modes

考题 ()is the disadvantage for air transportation?A、Quick but not safeB、Less frequencyC、It can’t lift heavy goodsD、the highest cost in all transport modes

考题 葫芦吊()A、derrickB、chainC、chain blockD、bridge

考题 单选题()is the disadvantage for air transportation?A Quick but not safeB Less frequencyC It can’t lift heavy goodsD the highest cost in all transport modes

考题 单选题Stress on the topping lift of a swinging boom can be reduced by().A rigging a back stayB raising the boomC increasing the mechanical advantage of the cargo purchaseD taking all slack out of the preventer

考题 单选题The ()(千斤滑车) can run the gooseneck.A heavy derrickB pulley blockC topping lift blockD guy tackle

考题 单选题A flounder plate,on a topping lift,is().A a fairlead blockB a swivel pin for the topping lift blockC a triangular steel plate with a hole at each cornerD the lower block of a multiple part topping lift

考题 单选题A band or collar on the top end of a boom which the topping lift, midships guy, and outboard guys are secured, is called the().A collar bandB guy bandC pad eye collarD spider band

考题 单选题topping lift()A 千斤索B 定位滑车C 稳索D 千斤顶

考题 单选题What is the disadvantage for air transportation? ()A Quick but not safeB Less frequencyC It can’t lift heavy goodsD The highest cost in all transport modes

考题 单选题A single heavy wire made up for the topping lift is called a().A BaleB Spanner wireC Bull lineD Working guy

考题 单选题The ()(重吊杆) can lift heavy cargo.A heavy cargo derrickB heavy deckC jumbo boomD heavy block