网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
Before the()of the derrick, check all the tackle closely.
- A、operation
- B、operate
- C、operated
- D、operator
参考答案
更多 “Before the()of the derrick, check all the tackle closely.A、operationB、operateC、operatedD、operator” 相关考题
考题
The net productivity per gang-hour can be improved through a decrease of ______.A.cranes/derricksB.crane/derrick cyclesC.crane/derrick cycle timeD.weight per package
考题
把吊杆甩向码头。()A、Please swing the derrick to wharf side.B、Just go down the derrick , please.C、Just a moment , please.D、Please swing the derrick to inboard.
考题
请修理一下受损吊杆。()A、Please have the damaged derrick readjusted.B、Please have the damaged derrick repaired.C、Please have the damaged derrick painted.D、Please have the damaged derrick brushed.
考题
Do you want the derrick adjusted upwards or downwards? ()A、Top the derrick.B、Yes, I do.C、No, I don’t.D、Sorry, I don’t know.
考题
请把吊杆甩到舱口上方好吗?()A、Will you please swing the heavy derrick over the hatch?B、Will you please swing the derrick over the hatch?C、Will you please lower the derrick over the hatch?D、Will you please top the heavy derrick over the hatch?
考题
The ()(吊杆托架) supports the derrick.A、derrick boom restB、derrick headC、derrick mastD、derrick guy
考题
This ()was repaired in Singapore.A、damaged derrickB、damaging derrickC、derrick to be damagedD、derrick
考题
重吊杆用于吊大的重件。()A、Heavy derrick is used for lifting large heavy cargo.B、Derrick is used for lifting large heavy cargo.C、Heavy derrick is used for lifting dry bulk cargo.D、Derrick is used for lifting dry bulk cargo.
考题
这个吊杆的安全工作负荷是6吨。()A、The SWL of the derrick is five tons.B、The SWL of the heavy derrick is six tons.C、The SWL of the derrick is six tons.D、The SWL of the crane is six tons.
考题
单选题这个吊杆的安全工作负荷是6吨。()A
The SWL of the derrick is five tons.B
The SWL of the heavy derrick is six tons.C
The SWL of the derrick is six tons.D
The SWL of the crane is six tons.
考题
单选题The net productivity per gang-hour can be improved through a decrease of().A
Cranes/derricksB
Crane/derrick cyclesC
Crane/derrick cycle timeD
Weight per package
考题
单选题When the union purchase derrick is operated, one derrick is positioned over the quayside and the other almost vertically over the ().A
dockB
holdC
pedestalD
machinery space
考题
单选题Do you want the derrick adjusted upwards or downwards? ()A
Top the derrick.B
Yes, I do.C
No, I don’t.D
Sorry, I don’t know.
考题
单选题请调高一下吊杆。()A
Lower the derrick, please.B
Top the derrick, please.C
Swing the derrick, please.D
Adjust the derrick, please.
考题
单选题A warp end may be fitted for operating the derrick topping wire which adjusts the derrick ().A
lengthB
slackC
heightD
rotation direction
考题
单选题() may be fitted for operating the derrick topping lift (the wire which adjusts the derrick height).A
A capstanB
A holdC
A warp endD
A mooring drum
考题
单选题Before the operation of the derrick, check all ()(索具)closely and everything must be in good condition.A
blocksB
goosenecksC
tackleD
guys
考题
单选题Before the()of the derrick, check all the tackle closely.A
operationB
operateC
operatedD
operator
热门标签
最新试卷