山西省2019年12月ACCA考试成绩公布时间定了!

发布时间:2020-01-10


2019年ACCA最后一次考试(12月考季)已然落下帷幕,很多同学都在关注着自己的考试结果。据悉,ACCA官方将于2020年1月13日(明天)公布本次考试成绩。届时,大家可以在第一时间查询到自己的成绩。下面的ACCA成绩查询方法及流程希望对你有所帮助。

ACCA考试成绩查询方法

1.电子邮件(e-mail

您可以在 MY ACCA 内选择通过 E-mail 接收考试成绩。

2.短信接收(SMS

您可以在 MY ACCA 内选择通过 SMS 接收考试成绩。

3.在线查看考试成绩

所有在ACCA全球网站上登记的考生都可以在线查看自己的考试成绩。

在线查询成绩具体操作流程指导

(1)进入ACCA官网点击右上角My ACCA进行登录;

(2)输入账号、密码登录后进入主页面,点击 Exam status & Results;

(3)跳转页面后选择View your status report;

以上就是关于ACCA成绩查询的相关信息,51题库考试学习网在这里祝大家欧皇附体,成功通过考试!


下面小编为大家准备了 ACCA考试 的相关考题,供大家学习参考。

(c) mandatory continuing professional development (CPD) requirements. (5 marks)

正确答案:

(c) Continuing Professional Development (CPD)
CPD is defined5 as ‘the continuous maintenance, development and enhancement of the professional and personal knowledge
and skills which members of ACCA require throughout their working lives’.
All professional accountants need to maintain their competence and develop new skills to be effective in their current and
future employment. CPD helps keep accountants in practice employable and maintains their reputation with employers,
clients and the public. It also helps maintain the accounting profession’s reputation for producing and supporting high calibre
individuals. Therefore, CPD is something which professional accountants should take personal responsibility for, and be doing
as part of their everyday work.

Mandatory CPD for active members of IFAC member bodies (such as ACCA) was introduced with effect from 1 January 2005
onwards. ACCA has introduced CPD as a requirement for all active members, subject to the phasing-in dates (and waivers).
Tutorial note: IFAC issued International Education Standard (IES) 7, which requires the introduction of CPD for all active
members of IFAC member bodies.
ACCA practising certificate and insolvency licence holders are still required to participate in technical CPD training. All other
members will also be asked to state on their annual CPD return that they maintain competence in professional ethics.
The scheme is being introduced in phases:
■ phase 1 (2005) – members admitted since 1 January 2001, and all practising certificate and insolvency licence
holders;
■ phase 2 (2006) – members admitted between 1 January 1995 and 31 December 2000;
■ phase 3 (2007) – all remaining members.
Tutorial note: However, ACCA encouraged all members to adopt the scheme from 1 January 2005.
Affiliates join the CPD scheme on 1 January following their date of admittance to membership.
There are two routes to participation in ACCA’s CPD scheme:
(1) the unit scheme route (40 units approximate to 40 hours required each year); and
(2) the approved CPD employer route (i.e. where employers are recognised as effectively providing ACCA members with
CPD).
Tutorial note: Alternatively, if an ACCA member is also a member of another IFAC accounting body and that CPD scheme
is compliant with IFAC’s CPD IES 7, they may choose to follow that body’ s route.


3 Clyde Williams is facing a dilemma. He has successfully built up a small family-owned company, Concrete Solutions

Ltd, manufacturing a range of concrete based products used in making roads, pavements and walkways. The

production technology is very low tech and uses simple wooden moulds into which the concrete is poured. As a

consequence he is able to use low skilled and low cost labour, which would find it difficult to find alternative

employment in a region with high unemployment levels. The company has employed many of its workforce since its

creation in 1996. The company’s products are heavy, bulky and costly to transport. This means its market is limited

to a 30-mile area around the small rural town where the manufacturing facility is located. Its customers are a mix of

private sector building firms and public sector local councils responsible for maintaining roads and pavements. By its

nature much of the demand is seasonal and very price sensitive.

A large international civil engineering company has recently approached Clyde with an opportunity to become a

supplier of concrete blocks used in a sophisticated system for preventing coast and riverbank erosion. The process

involves interlocking blocks being placed on a durable textile base. Recent trends in global warming and pressure in

many countries to build in areas liable to flooding have created a growing international market for the patented erosion

prevention system. Clyde has the opportunity to become the sole UK supplier of the blocks and to be one of a small

number of suppliers able to export the blocks to Europe. To do it he will need to invest a significant amount in CAM

(computer aided manufacturing) technology with a linked investment in the workforce skills needed to operate the

new technology. The net result will be a small increase in the size of the labour force but redundancy for a significant

number of its existing workers either unwilling or unable to adapt to the demands of the new technology. Successful

entry into this new market will reduce his reliance on the seasonal low margin concrete products he currently produces

and significantly improve profitability.

One further complication exists. Concrete Solutions is located in a quiet residential area of its home town. Clyde is

under constant pressure from the local residents and their council representatives to reduce the amount of noise and

dust created in the production process. Any move into making the new blocks will increase the pollution problems

the residents face. There is a possibility of moving the whole manufacturing process to a site on a new industrial estate

being built by the council in a rival town. However closure of the existing site would lead to a loss of jobs in the current

location. Clyde has asked for your help in resolving his dilemma.

Required:

(a) Using models where appropriate, advise Clyde on whether he should choose to take advantage of the

opportunity offered by the international company. (12 marks)

正确答案:

SWOT analysis, including his personal liability to manage the strategic change would be useful. There may be a significant
investment in new technology and employee training to make the new blocks. In effect he will be forming a strategic alliance
with the international company and making significant changes to both the value chain and value system. There will be no
need to invest in sales and marketing as this will be the responsibility of its larger partner. As a major strategic option there
is a need to address issues of its suitability, acceptability and feasibility. In terms of suitability the option seems to address
many of the strategic problems attached to his current product range. It is a product that can be sold all year round and into
a much wider geographical market area. It is in terms of acceptability that the dilemma reveals itself and the impact on the
different stakeholders involved – he may find stakeholder mapping and scenario building useful in coming to a decision. As
the owner of the business he needs to assess the risk involved against the likely returns. Feasibility looks reasonably sound– new resources and skills will be needed but affordable and achievable with the support of the partner.


(c) Discuss the ways in which budgets and the budgeting process can be used to motivate managers to

endeavour to meet the objectives of the company. Your answer should refer to:

(i) setting targets for financial performance;

(ii) participation in the budget-setting process. (12 marks)

正确答案:
(c) Examiner’s Note:
The topic of managerial motivation and budgeting has been a subject of discussion for a number of years. There are links
here to the topics of performance measurement and responsibility accounting. Discussion should be focused on the area of
budgets and the budgeting process, as specified in the question.
Setting targets for financial performance
It has been reasonably established that managers respond better in motivation and performance terms to a clearly defined,
quantitative target than to the absence of such targets. However, budget targets must be accepted by the responsible
managers if they are to have any motivational effect. Acceptance of budget targets will depend on several factors, including
the personality of an individual manager and the quality of communication in the budgeting process.
The level of difficulty of the budget target will also influence the level of motivation and performance. Budget targets that are
seen as average or above average will increase motivation and performance up to the point where such targets are seen as
impossible to achieve. Beyond this point, personal desire to achieve a particular level of performance falls off sharply. Careful
thought must therefore go into establishing budget targets, since the best results in motivation and performance terms will
arise from the most difficult goals that individual managers are prepared to accept4.
While budget targets that are seen as too difficult will fail to motivate managers to improve their performance, the same is
true of budget targets that are seen as being too easy. When budget targets are easy, managers are likely to outperform. the
budget but will fail to reach the level of performance that might be expected in the absence of a budget.
One consequence of the need for demanding or difficult budget targets is the frequent reporting of adverse variances. It is
important that these are not used to lay blame in the budgetary control process, since they have a motivational (or planning)
origin rather than an operational origin. Managerial reward systems may need to reward almost achieving, rather than
achieving, budget targets if managers are to be encouraged by receiving financial incentives.
Participation in the budget-setting process
A ‘top-down’ approach to budget setting leads to budgets that are imposed on managers. Where managers within an
organisation are believed to behave in a way that is consistent with McGregor’s Theory X perspective, imposed budgets may
improve performance, since accepting the budget is consistent with reduced responsibility and avoiding work.
It is also possible that acceptance of imposed budgets by managers who are responsible for their implementation and
achievement is diminished because they feel they have not been able to influence budget targets. Such a view is consistent
with McGregor’s Theory Y perspective, which holds that managers naturally seek responsibility and do not need to be tightly
controlled. According to this view, managers respond well to participation in the budget-setting process, since being able to
influence the budget targets for which they will be responsible encourages their acceptance. A participative approach to
budget-setting is also referred to as a ‘bottom-up’ approach.
In practice, many organisations adopt a budget-setting process that contains elements of both approaches, with senior
management providing strategic leadership of the budget-setting process and other management tiers providing input in terms
of identifying what is practical and offering detailed knowledge of their area of the organisation.

声明:本文内容由互联网用户自发贡献自行上传,本网站不拥有所有权,未作人工编辑处理,也不承担相关法律责任。如果您发现有涉嫌版权的内容,欢迎发送邮件至:contact@51tk.com 进行举报,并提供相关证据,工作人员会在5个工作日内联系你,一经查实,本站将立刻删除涉嫌侵权内容。