网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Electrical wiring on all “T-Boats” must be()。
A

concealed to prevent mechanical damage

B

concealed so the boat can be maintained more easily

C

protected from the weather

D

in an accessible place behind the ceiling


参考答案

参考解析
解析: 暂无解析
更多 “单选题Electrical wiring on all “T-Boats” must be()。A concealed to prevent mechanical damageB concealed so the boat can be maintained more easilyC protected from the weatherD in an accessible place behind the ceiling” 相关考题
考题 Dry powder is used to put out ________A.electrical fireB.oil fireC.common firesD.all kinds of fires

考题 An electrical device which prevents an action from occurring until all other required conditions are met is called a/an _____.A.limitB.monitorC.modulatorD.interlock

考题 The electrical components for each single crane are installed in its ______.A.crane houseB.machinery baseC.turntableD.All of the above

考题 Given two different character sets (A and B), which of the following must be true for A to be considered a strict superset of B?() A. A must contain all of the characters defined in BB. A must be UnicodeC. The encoded values in A must match the encoded values in B for all characters defined in BD. A must be a multibyte character setE. The encoded values in A must match the encoded values in B for all numeric and alphabetic characters in B

考题 We must do something to stop the pollution, and ______ we must make all the people realize how serious the problem is. A.after allB.above allC.in allD.at all

考题 Electrical wiring on all "T-Boats" must be ______.A.concealed to prevent mechanical damageB.concealed so the boat can be maintained more easilyC.protected from the weatherD.in an accessible place behind the ceiling

考题 Which statement concerning reserve sources of energy for GMDSS is FALSE ________.A.While the ship is at sea,there must be available at all times a supply of electrical energy sufficient to operate the radio installations and to charge any batteries used as part of a reserve source of energyB.Both the VHF and MF/HF installations must be simultaneously suppliedC.A means of ensuring a continuous supply of electrical power must be provided to all GMDSS equipment that could be affected by an interruption in powerD.If a UPS or equivalent is used to supply power to the ship's GPS receiver or other source of positional information,a means must be provided to ensure the continuous supply of the information in the event of a failure to the ship's main or emergency source of power

考题 All electrical appliances aboard a vessel should be grounded to ______.A.prevent them from falling when the vessel rollsB.protect personnel from electrical shockC.increase their operating efficiencyD.prevent unauthorized personnel from operating them

考题 Given two different character sets (A and B), which of the following must be true for A to be considered a strict superset of B?()A、 A must contain all of the characters defined in BB、 A must be UnicodeC、 The encoded values in A must match the encoded values in B for all characters defined in B D、 A must be a multibyte character setE、 The encoded values in A must match the encoded values in B for all numeric and alphabetic character

考题 船舶离港之前,所有的吊杆必须纵向收放好。()A、Before leaving the harbour, all derricks must be stowed.B、After leaving the harbour, all derricks must be stowed fore and aft.C、Before leaving the harbour, all derricks must be stowed fore and aft.D、Before leaving the harbour, all heavy derricks must be stowed fore and aft.

考题 () must know the location as well as the operation of the life-saving and fire-fighting appliances.A、All officersB、All engineersC、All the crewD、All sailors

考题 Which of the following are true of Ethernet technology?()A、Hosts use a logical ring topology.B、Hosts use a logical bus topologyC、Hosts must wait for an electronic signal to transfer data.D、Hosts are directly connected to a wiring concentrator called a MSAU.

考题 Lightening causes a power surge and leads to a fire in the datacenter. Following emergency procedures, which of the following is the FIRST thing the server administrator should do?()A、Turn off all electrical powerB、Remove all backup mediaC、Implement fire suppressionD、Evacuate all personnel

考题 What must be done in order to automatically close the purchase requisition (PR) after one or more purchase orders (PO) have been created?  ()A、 All PR lines must be assigned to a PO.B、 The PR must be in the Approved status.C、 The PR must enter the workflow process.D、 All manual company input fields must be completed.

考题 单选题Water fog from an all-purpose nozzle may be used to().A fight an electrical fireB fight a magnesium fireC eliminate smoke from a compartmentD All of the above

考题 单选题Accidental grounds in a shipboard electrical system must be repaired as soon as possible as they will ()A result in immediate power outagesB damage circuit breakersC appear on the ground detection systemD damage insulation and may cause outages

考题 单选题When a rescuer finds an electrical burn victim in the vicinity of live electrical equipment or wiring,his first step is to().A flush water over any burned area of the patientB apply ointment to the burned areas on the patientC get assistance to shut down electrical power in the areaD remove the patient from the vicinity of the live electrical equipment or wiring

考题 单选题Which statement concerning reserve sources of energy for GMDSS is FALSE().A While the ship is at sea,there must be available at all times a supply of electrical energy sufficient to operate the radio installations and to charge any batteries used as part of a reserve source of energyB Both the VHF and MF/HF installations must be simultaneously suppliedC A means of ensuring a continuous supply of electrical power must be provided to all GMDSS equipment that could be affected by an interruption in powerD If a UPS or equivalent is used to supply power to the ship's GPS receiver or other source of positional information,a means must be provided to ensure the continuous supply of the information in the event of a failure to the ship's main or emergency source of power

考题 单选题A ground can be defined as an electrical connection between the wiring of a motor and its().A shunt fieldB circuit breakerC metal frameworkD inter-pole

考题 多选题Given two different character sets (A and B), which of the following must be true for A to be considered a strict superset of B?()AA must contain all of the characters defined in BBA must be UnicodeCThe encoded values in A must match the encoded values in B for all characters defined in BDA must be a multibyte character setEThe encoded values in A must match the encoded values in B for all numeric and alphabetic characters in B

考题 单选题To repair a small electrical motor that has been submerged in saltwater, you should ().A wash it with fresh water and apply an external source of heatB renew the windingsC send it ashore to an approved service facilityD rinse all electrical parts with a carbon tetrachloride cleaning solvent and then blow dry the motor with compressed air

考题 单选题The source of energy fitted in GMDSS complying vessels must be().A the main source of energyB emergency source of electrical powerC the reserve source of energyD all of above

考题 单选题All electrical appliances aboard a vessel should be grounded to().A prevent them from falling when the vessel rollsB protect personnel from electrical shockC increase their operating efficiencyD prevent unauthorized personnal from operating them

考题 多选题Which three options are prerequisites to configuring Cisco AutoOoS?()ACisco Express Forwarding (CEF) must be globally enabled.BPrior to the enabling of the Cisco AutoOoS feature, the bandwidth command must be applied on all interfaces or subinterfaces.CAfter the enabling of the Cisco AutoOoS feature, the bandwidth command must be applied on all interfaces or subinterfaces .DOoS policies must be enabled on all interfaces that will participate in the AutoOoS configuration.EAn IP address must be configured on all low-bandwidth interfaces (768 kb/s or lower) that will participate in the AutoOoS configurationFAn IP address must be configured on all interfaces that will participate in the AutoOoS configuration

考题 单选题What must be done in order to automatically close the purchase requisition (PR) after one or more purchase orders (PO) have been created?  ()A  All PR lines must be assigned to a PO.B  The PR must be in the Approved status.C  The PR must enter the workflow process.D  All manual company input fields must be completed.

考题 单选题Storage batteries on T-Boats must be located().A in sight of the main engine(s)B in a tray lined with suitable material that resists damage from the electrolyteC in locked closets with restricted ventilationD near the bilge to lower the center of gravity and improve stability

考题 单选题Which action should be taken when an auxiliary boiler in is operation?()A Clean all electrical connectionsB Lift the relief valves by handC Inspect and clean all solenoid valvesD Inspect for oil and water leaks