网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The account team designed a p5-570 solution to strategically position the customer for future IBM announcements.  The customer was dissatisfied upon implementing the solution.  An AIX v5.1 partition was added to the requirements halfway through the solution design process and it was not considered in the final design. What should the pSeries technical specialist have done to prevent this situation?()
A

Submitted an RPQ (Request for Quote) for AIX v5.1 support on a p5-570

B

Designed a p670 because it supports AIX 5.1 partitions

C

Initially designed a solution supporting AIX 5.1 partitions

D

Gained customer approval for the final design prior to ordering the system


参考答案

参考解析
解析: 暂无解析
更多 “单选题The account team designed a p5-570 solution to strategically position the customer for future IBM announcements.  The customer was dissatisfied upon implementing the solution.  An AIX v5.1 partition was added to the requirements halfway through the solution design process and it was not considered in the final design. What should the pSeries technical specialist have done to prevent this situation?()A Submitted an RPQ (Request for Quote) for AIX v5.1 support on a p5-570B Designed a p670 because it supports AIX 5.1 partitionsC Initially designed a solution supporting AIX 5.1 partitionsD Gained customer approval for the final design prior to ordering the system” 相关考题
考题 ● The project team members should also be aware of one of the fundamental tenets of modern quality management: quality is planned ,designed and built in, not (72 ).(72)A. executed inB. inspected inC. check-inD. look-in

考题 An effective Project Manager does not share project _____ with the team members.A VisionB responsibilityC solution to problemsD accountabilityE status

考题 64 An effective Project Manager does not share project _____ with the team members.A. VisionB. responsibilityC. solution to problemsD. accountabilityE. status

考题 The project team members should also be aware of one of the fundamental tenets of modem quality management: quality is planned, designed and built in, not(72).A.executed inB.inspected inC.check-inD.look-in

考题 The project team members should also be aware of one of the fundamental tenets of modern quality management: quality is planned, designed and built in, not()A、executedinB、inspectedinC、check-inD、look-in

考题 Which of the following statements best describes a Pre-sales Solution Assurance Review?()A、An account team proposal reviewB、An installation planning meetingC、A solution design development methodologyD、A technical inspection of a completed solution design

考题 A customer is very concerned about maintaining a competitive advantage through the use of state-of-the-art technology.  Assuming all solutions meet the customer’s technical requirements, which solution should the IBM team propose to maximize customer satisfaction?()A、p690 with Dynamic LPARB、Grid of SP switch-attached p5-550sC、p690 with Advanced POWER VirtualizationD、p5-570 with Advanced POWER Virtualization

考题 A customer had been given a proposal for a p5-570 6-way 32GB system running in Full Partition mode.  After review, the customer asked that the configuration be modified to enhance the reliability and availability of the solution.  However, the customer does not want to pay for HACMP or additional machines.  What change would be most likely to improve the reliability of the solution?()A、Add CUoD memory.B、Provide CUoD processors.C、Provide redundant disks on separate SCSI buses.D、Add redundant power supplies in the p5-570 CEC (Central Electronics Complex).

考题 A customer requires an 8-way 16GB AIX system.  They are evaluating the following three systems: ? p5-570   ? p5-570 Express  ? p650   The pSeries technical specialist has been asked to explain the pros and cons of the three solutions.   What information will help the customer decide on the best solution for their environment?()A、The p5-570 Express can support DDR2 memory.B、The p650 and p5-570 Express provide faster processors.C、The p5-570 Express is limited to eight 1.5GHz processors.D、Neither the p5-570 nor the p5-570 Express supports Capacity on Demand.

考题 A customer is evaluating an IBM commercial solution against a 16-way rx8620 Integrity (Itanium). The pSeries technical specialist should lead with which of the following IBM systems?()A、IBM p5-570 8-wayB、IBM p5-570 4-wayC、IBM p5-570 2-wayD、IBM p5-570 16-way

考题 A customer needs three 2-way application servers and is evaluating the purchase of three p5-520s versus one partitioned 6-way p5-570.  They like the benefits provided with dynamic processor sparing.  What information should the pSeries technical specialist emphasize to the customer?()A、The p5-570 offers CoD processors.B、The p5-570 requires more rack space than the three p5-520s.C、Redundant power is standard on the p5-570 and is optional on the p5-520.D、Operating system charges will be less expensive with the p5-520 solution.

考题 The client team tends to bring the pSeries technical specialist in very late in the process.  This has caused several problems where the specialist has had to correct some misunderstandings about the technology.  The specialist is getting very frustrated and would like to avoid these misunderstandings in future. What would be the most appropriate way to handle this?()A、Refuse to work with the account team unless they are brought in right at the beginning.B、Talk to the account team and ask them to bring them in earlier so that they can better understand the account.C、Explain the situation to the customer and ask them to talk to the account team about bringing them in earlier.D、Explain the situation to the sales manager and ask him to talk to the account team about bringing them in earlier.

考题 A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs.  The current applications are certified on AIX 5.2 but not yet on AIX 5.3.  The customer wants to understand the advantages and disadvantages of this solution versus a pair of 4-way p5-550s with 16GB each in testing their current applications. Which of the following points should the pSeries technical specialist highlight?()A、The p5-570 would save rack space over a pair of p5-550 servers.B、The p5-570 allows for more CPU and memory resources to be dynamically allocated to any LPAR for performance testing.C、The p5-570 can only be upgraded to 64GB of RAM without replacing memory.D、The p5-570 supports advanced features such as Micro-Partitioning and Virtual I/O allowing more LPARs of the customer’s applications with fewer processors and fewer I/O adapters.

考题 The account team designed a p5-570 solution to strategically position the customer for future IBM announcements.  The customer was dissatisfied upon implementing the solution.  An AIX v5.1 partition was added to the requirements halfway through the solution design process and it was not considered in the final design. What should the pSeries technical specialist have done to prevent this situation?()A、Submitted an RPQ (Request for Quote) for AIX v5.1 support on a p5-570B、Designed a p670 because it supports AIX 5.1 partitionsC、Initially designed a solution supporting AIX 5.1 partitionsD、Gained customer approval for the final design prior to ordering the system

考题 The sales team has just sold the first pSeries solution to a Windows NT customer.   The team has identified concerns with a non-existent backup strategy and some workable environmental issues.   In addition to these concerns,what other major concern should be considered?()A、Customer skill levelB、Hardware availabilityC、Lack of executive sponsorshipD、Hardware and software compatibility

考题 The sales team has brought in the pSeries technical specialist to recommend the best solution to win the business.   The customer wants the lowest purchase cost four-disk solution using an external I/O solution.  Which of the following offerings provides the required base function at the lowest cost?()A、2104B、ESS800C、FAStT600D、SSA 7133

考题 单选题The sales team has brought in the pSeries technical specialist to recommend the best solution to win the business.   The customer wants the lowest purchase cost four-disk solution using an external I/O solution.  Which of the following offerings provides the required base function at the lowest cost?()A 2104B ESS800C FAStT600D SSA 7133

考题 单选题A customer requires an 8-way 16GB AIX system.  They are evaluating the following three systems: ? p5-570   ? p5-570 Express  ? p650   The pSeries technical specialist has been asked to explain the pros and cons of the three solutions.   What information will help the customer decide on the best solution for their environment?()A The p5-570 Express can support DDR2 memory.B The p650 and p5-570 Express provide faster processors.C The p5-570 Express is limited to eight 1.5GHz processors.D Neither the p5-570 nor the p5-570 Express supports Capacity on Demand.

考题 填空题What is the purpose of the Gmail team in sending this email?They hope the user will ____ the account.

考题 单选题Choose the most accurate statement regarding the account qualification and planning service component in the prepare phase. Select exactly 1 answer(s) from the following:()。A providing a partner with information regarding customer acceptance of a new SolutionB providing information regarding current network infrastructure readinessC using stakeholder interviews to identify stakeholders and decision-makers, high-level solution requirements, timelines, and the scope of an opportunityD adjusting a solution to account for a customers physical site characteristics

考题 单选题The account team designed a p5-570 solution to strategically position the customer for future IBM announcements.  The customer was dissatisfied upon implementing the solution.  An AIX v5.1 partition was added to the requirements halfway through the solution design process and it was not considered in the final design. What should the pSeries technical specialist have done to prevent this situation?()A Submitted an RPQ (Request for Quote) for AIX v5.1 support on a p5-570B Designed a p670 because it supports AIX 5.1 partitionsC Initially designed a solution supporting AIX 5.1 partitionsD Gained customer approval for the final design prior to ordering the system

考题 单选题The account team is putting together a very complex solution for the customer.  During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified.  What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()A Use eConfig to configure and validate each pSeries and p5 system.B Engage Advanced Technical Support to review any outstanding technical issues.C Confirm with the customer that the solution design meets their requirements.D Perform a Pre-Install Solution Assurance Review to validate required power requirements.

考题 单选题The storage specialist has designed a very complex solution with the customer, and needs toverify that all associated equipment will work as expected. Which of the following is designed tohelp lower support cost and improve customer satisfaction?()A ATScon MonitorB Technical and Delivery AssessmentC System Storage Interoperations CenterD Standalone Solutions Configuration Tool

考题 填空题What may happen to the user’s account if it is inactive for 9 months?The Gmail team may have to ____ the user’s account.

考题 单选题A solution to overcome tripping defects is an arrangement of special plates on either side of the flukes, designed to set them in the correct tripping position. These special plates are called().A trippersB stocksC awlD palms

考题 单选题The project team members should also be aware of one of the fundamental tenets of modern quality management: quality is planned, designed and built in, not()A executedinB inspectedinC check-inD look-in

考题 单选题Which of the following statements best describes a Pre-sales Solution Assurance Review?()A An account team proposal reviewB An installation planning meetingC A solution design development methodologyD A technical inspection of a completed solution design

考题 多选题You are the administrator of a Windows 2003 domain The domain contains 20 Windows 2000 Professional computers and two Windows 2003 Server computers. For the domain, you want to set an account policy that locks any user's account after three consecutive failed logon attempts. You also want to ensure that only administrators will be able to unlock the account. Which two actions should you take?() (Each correct answer presents part of the solution. Choose two)ASet the Account lockout duration value to 0.BSet the Account lockout duration value to 3.CSet the Account lockout threshold value to 0.DSet the Account lockout threshold value to 3.ESet the Reset account lockout counter after value to 0.FSet the Reset account lockout counter after value to 3.