网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs.  The current applications are certified on AIX 5.2 but not yet on AIX 5.3.  The customer wants to understand the advantages and disadvantages of this solution versus a pair of 4-way p5-550s with 16GB each in testing their current applications. Which of the following points should the pSeries technical specialist highlight?()
A

The p5-570 would save rack space over a pair of p5-550 servers.

B

The p5-570 allows for more CPU and memory resources to be dynamically allocated to any LPAR for performance testing.

C

The p5-570 can only be upgraded to 64GB of RAM without replacing memory.

D

The p5-570 supports advanced features such as Micro-Partitioning and Virtual I/O allowing more LPARs of the customer’s applications with fewer processors and fewer I/O adapters.


参考答案

参考解析
解析: 暂无解析
更多 “单选题A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs.  The current applications are certified on AIX 5.2 but not yet on AIX 5.3.  The customer wants to understand the advantages and disadvantages of this solution versus a pair of 4-way p5-550s with 16GB each in testing their current applications. Which of the following points should the pSeries technical specialist highlight?()A The p5-570 would save rack space over a pair of p5-550 servers.B The p5-570 allows for more CPU and memory resources to be dynamically allocated to any LPAR for performance testing.C The p5-570 can only be upgraded to 64GB of RAM without replacing memory.D The p5-570 supports advanced features such as Micro-Partitioning and Virtual I/O allowing more LPARs of the customer’s applications with fewer processors and fewer I/O adapters.” 相关考题
考题 The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?() A. capacity above 500 TBB. first in customer locationC. a new model has been releasedD. sold without implementation service

考题 A customer is looking for a solution to provide high performance storage. A competing vendor has proposed a solution based on a loosely coupled model of 1Gbps iSCSI and SATA disks.What alternative solution could be proposed that is cost-effective and high-performance?()A. DS8000B. HDS VSPC. EMC V-Max standard configurationD. XIV system 15 module configuration

考题 A customer wants to run eight production partitions each with the following:   ? 0.7 CPU 1.65-GHz   ? 4GB of RAM   ? 2 Ethernet adapters   They do not have room for many RIO drawers since rack space is currently scarce in their data center.  They have significant unused SAN attached disk.  In addition to the Advanced POWER Virtualization feature, which of the following is the minimum recommended configuration needed to meet the customer’s requirements?()A、p5-570 6-way 1.65-GHz, 32GBB、p5-570 8-way 1.65-GHz, 32GBC、p5-570 6-way 1.65-GHz, 48GBD、p5-570 8-way 1.65-GHz, 48GB

考题 The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()A、capacity above 500 TBB、first in customer locationC、a new model has been releasedD、sold without implementation service

考题 A customer has an 8-way p5-570 with eight internal disk drives and AIX 5.2.  Which of the following must be added, if anything, to the configuration to support four LPARs, assuming each LPAR requires twodisk drives?()A、7311-D20 drawer with four disksB、Upgrade to AIX 5.3C、Fiber adapters to attach to SAND、Nothing

考题 Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool. Prior to the implementation of the system, the customer informs the technical specialist that one of the applications is only supported on AIX 5L 5.2. Which of the following changes to the system design should the technical specialist make to accommodate this change?()A、Create all the partitions as AIX 5.2, each having two dedicated processors.B、Purchase a system with two additional processors that can be assigned to the AIX 5.2 Partition.C、Specify an AIX 5.2 partition using dedicated processors, reducing the number of processors in the shared pool.D、Use the virtual I/O server to manage the disks and network connections removing the need for different levels of device drivers.

考题 A customer had been given a proposal for a p5-570 6-way 32GB system running in Full Partition mode.  After review, the customer asked that the configuration be modified to enhance the reliability and availability of the solution.  However, the customer does not want to pay for HACMP or additional machines.  What change would be most likely to improve the reliability of the solution?()A、Add CUoD memory.B、Provide CUoD processors.C、Provide redundant disks on separate SCSI buses.D、Add redundant power supplies in the p5-570 CEC (Central Electronics Complex).

考题 A customer is looking for a solution to provide high performance storage. A competing vendor has proposed a solution based on a loosely coupled model of 1Gbps iSCSI and SATA disks. What alternative solution could be proposed that is cost-effective and high-performance?()A、DS8000B、HDS VSPC、EMC V-Max standard configurationD、XIV system 15 module configuration

考题 A customer requires an 8-way 16GB AIX system.  They are evaluating the following three systems: ? p5-570   ? p5-570 Express  ? p650   The pSeries technical specialist has been asked to explain the pros and cons of the three solutions.   What information will help the customer decide on the best solution for their environment?()A、The p5-570 Express can support DDR2 memory.B、The p650 and p5-570 Express provide faster processors.C、The p5-570 Express is limited to eight 1.5GHz processors.D、Neither the p5-570 nor the p5-570 Express supports Capacity on Demand.

考题 A Business Partner has proposed an IBM System Storage DS8700 that will have several AIX, Windows, and Sun Solaris servers attached via SAN. The customer has asked for detailed documentation on the steps needed to install the latest adapter drivers.  What is the best document the Business Partner can suggest to accomplish this requirement()A、the IBM System Storage DS8000 Interoperability MatrixB、the IBM System Storage DS8000 Introduction and Planning GuideC、the IBM System Storage DS8000 Host System Attachment GuideD、the IBM System Storage DS8000 User’s Guide

考题 A solution provider has proposed a pSeries solution to a new customer.  The solution is complex with a number of technologies that are new to the customer. They have a tight timeline for implementation.  The solution provider has not been able to get a clear understanding as to how the customer will backup the system.  What would be the most appropriate action to address the risks with this solution?()A、Sell SysbackB、Conduct a SARC、Sell SupportlineD、Provide a project timeline

考题 A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs.  The current applications are certified on AIX 5.2 but not yet on AIX 5.3.  The customer wants to understand the advantages and disadvantages of this solution versus a pair of 4-way p5-550s with 16GB each in testing their current applications. Which of the following points should the pSeries technical specialist highlight?()A、The p5-570 would save rack space over a pair of p5-550 servers.B、The p5-570 allows for more CPU and memory resources to be dynamically allocated to any LPAR for performance testing.C、The p5-570 can only be upgraded to 64GB of RAM without replacing memory.D、The p5-570 supports advanced features such as Micro-Partitioning and Virtual I/O allowing more LPARs of the customer’s applications with fewer processors and fewer I/O adapters.

考题 The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors.  The system is a test system to run AIX 5.2.  The customer has stated a preference for internal disks for the boot devices.  The customer has said they may later need to run three or four LPARs without increasing the number of processors. What should the pSeries technical specialist tell the customer about the ability of the p5-570 to meet their requirements?()A、It will require additional SCSI adapters and I/O drawers or external disks to support more than two LPARs.B、It has sufficient built-in SCSI controllers and disk enclosures to support four total LPARs by only adding the necessary additional disks.C、It is unable to use internal disks for LPARs and therefore additional adapters I/O drawers or external disks must be used to support all LPARs.D、It can support six LPARs with internal disks but will require special features, cables and an adapter to support the additional LPARs with internal disks.

考题 A customer has been quoted a DS8800. Which part of the TDA process would ensure that there isenough power in the customer location to operate the system?()A、 Pre-sale B、 Post-sale C、 Pre-install D、 Post-install

考题 A customer indicates that a system is experiencing printing problems. After checking the system, and successfully printing, no problem has been found.  Which of the following procedures should be performed next to further clarify the problem?()A、 Reboot the system.B、 Check the file system sizes.C、 Have the customer repeat the task to recreate the problem.D、 Inform the customer that no problems were found, and to call back if the problem reoccurs.

考题 A customer needs an Oracle Database Server. Based on the customer’s sizing data, the IBM Oracle Competency Center has determined that the server requirements can be met with a 4-way p5-550 or a 4-way p5-570.  If the pSeries technical specialist proposes a p5-570 versus a p5-550 system, what key differences should be pointed out to the customer?()A、The p5-570 is rack mounted but the p5-550 is not.B、The p5-570 will provide more growth, but at a higher cost.C、The p5-570 is 200-240 volt only and the p5-550 is 110 volt only.D、The p5-570 needs a special feature to become a deskside machine.

考题 单选题A customer requires an 8-way 16GB AIX system.  They are evaluating the following three systems: ? p5-570   ? p5-570 Express  ? p650   The pSeries technical specialist has been asked to explain the pros and cons of the three solutions.   What information will help the customer decide on the best solution for their environment?()A The p5-570 Express can support DDR2 memory.B The p650 and p5-570 Express provide faster processors.C The p5-570 Express is limited to eight 1.5GHz processors.D Neither the p5-570 nor the p5-570 Express supports Capacity on Demand.

考题 单选题Purging air from a hydraulic system is necessary when()A adding small amounts of oil to the systemB the system has been overheatedC the system has been drained and then filled with new oilD the system has been idle for a long period of time

考题 单选题A customer has been quoted a DS8800. Which part of the TDA process would ensure that there isenough power in the customer location to operate the system?()A  Pre-sale B  Post-sale C  Pre-install D  Post-install

考题 单选题A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()A The room temperature has reached 23C (73.4F). B A Blade within the chassis has been shut down. C The ambient temperature in the data center has increased D One of the additional System X servers in the BladeCenter rack has failed.

考题 单选题A Business Partner has proposed an IBM System Storage DS8700 that will have several AIX, Windows, and Sun Solaris servers attached via SAN. The customer has asked for detailed documentation on the steps needed to install the latest adapter drivers.  What is the best document the Business Partner can suggest to accomplish this requirement()A the IBM System Storage DS8000 Interoperability MatrixB the IBM System Storage DS8000 Introduction and Planning GuideC the IBM System Storage DS8000 Host System Attachment GuideD the IBM System Storage DS8000 User’s Guide

考题 单选题A customer needs an Oracle Database Server. Based on the customer’s sizing data, the IBM Oracle Competency Center has determined that the server requirements can be met with a 4-way p5-550 or a 4-way p5-570.  If the pSeries technical specialist proposes a p5-570 versus a p5-550 system, what key differences should be pointed out to the customer?()A The p5-570 is rack mounted but the p5-550 is not.B The p5-570 will provide more growth, but at a higher cost.C The p5-570 is 200-240 volt only and the p5-550 is 110 volt only.D The p5-570 needs a special feature to become a deskside machine.

考题 单选题The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()A capacity above 500 TBB first in customer locationC a new model has been releasedD sold without implementation service

考题 单选题A state agency has recently deployed a new application on an 8-way p5-570 that is critical to the agency’s operation.  There is no manual method to perform the business process.  The state government has just mandated that all state agencies have disaster recovery plans that allow the agencies to recover critical applications in acceptable periods of time with no loss of performance. Based on this new business requirement, what is this agency most likely to need?()A HACMP and four processors for the p5-570B HACMP and eight processors for the p5-570C HACMP-XD and a 4-way p5-570 in a second locationD HACMP-XD and a 8-way p5-570 in a second location

考题 单选题After months of negotiations and several proposals, the customer indicates that they may be ready to purchase a pSeries system.  Rather than quickly ordering the last configuration proposed, what is the most appropriate next step for a pSeries technical specialist to improve the chance of a successful project?()A Obtain buy-in and feedback from the customer.B First ask the client executive if financing has been arranged.C Plan the installation and rollout schedule before ordering.D Confirm that any additional requirements are handled by others.

考题 单选题A customer indicates that a system is experiencing printing problems. After checking the system, and successfully printing, no problem has been found.  Which of the following procedures should be performed next to further clarify the problem?()A  Reboot the system.B  Check the file system sizes.C  Have the customer repeat the task to recreate the problem.D  Inform the customer that no problems were found, and to call back if the problem reoccurs.

考题 单选题A customer has been receiving warning alerts on their storage units. All data is protected nightlyby a backup and has been tested without any issues. What should the customer do prior tocontacting IBM Support?()A collect all support dataB implement a current backupC update all firmware levelsD shut down the storage system

考题 单选题A customer plans to purchase a p5-570 that will run in SMP mode to host a large financial database on AIX 5.2.  The application is sized for an 8-way 1.65-GHz machine.  They do not currently have an existing HMC that supports p5 machines. This organization experiences unpredictable short-term spikes in processor utilization.  To mitigate the risk to their business, they are interested in IBM’s CoD offering.  In addition to the 8-way system, what else should the pSeries technical specialist recommend to the customer?()A Another p5-570 building blockB Capacity Backup p5-570 building blockC Another p5-570 building block and at least one HMCD Capacity Backup p5-570 building block and at least one HMC