网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The ladder shall().
A

be secured in a position so that it rests firmly against the ship's side from which the discharge operations are carried out

B

have at least two replacement steps which are secured in position by a method different from that used in the original construction

C

have battens made of hardwood,or other material of equivalent properties,in one piece and not less than 1.80metres long provided at such intervals as will prevent the pilot ladder from twisting

D

have steps made of softwood,or other material of equivalent properties,made in one piece free of knots,having an efficient slip surface


参考答案

参考解析
解析: 暂无解析
更多 “单选题The ladder shall().A be secured in a position so that it rests firmly against the ship's side from which the discharge operations are carried outB have at least two replacement steps which are secured in position by a method different from that used in the original constructionC have battens made of hardwood,or other material of equivalent properties,in one piece and not less than 1.80metres long provided at such intervals as will prevent the pilot ladder from twistingD have steps made of softwood,or other material of equivalent properties,made in one piece free of knots,having an efficient slip surface” 相关考题
考题 What()I do()I miss the train. A.shall,becauseB.shall,ifC.can,becauseD.shall,although

考题 何谓off-ladder?

考题 Is the pilot ladder all right at this ________?A.higherB.highC.heightD.heighten

考题 Where one of two vessels is to keep out of the way the other________.A.shall not keep her course but shall keep her speedB.shall not keep her course and speedC.shall keep her course but change her speedD.shall keep her course and speed

考题 ALL GEAR,SUCH AS PILOT LADDER,ACCOMMODATION LADDER,HOIST,ETC.,NECESSARY FOR A SAFE TRANSFER OF THE PILOT is known as ______.A.RigginsB.GearsC.Boarding arrangementsD.Fittings

考题 No oil or mixture containing oil ______ into Singapore waters from any vessel.A.shall not be dischargedB.shall be dischargedC.shall be filledD.shall not be filled

考题 In accordance with Bareboat Charter,______ and the mortgagee(s)advised of the intended employment,planned dry-docking and major repairs of the Vessel,as reasonably required.A.the Charterers shall keep the OwnersB.the Charterers shall keep the ShippersC.the Owners shall keep the CharterersD.the Owners shall keep the Shippers

考题 In the event the Buyers do not take delivery of the Vessel within the period specified,______ the liquidated damage for each day of the delay up to the tenth(10th )day of the delay.A.the Buyers shall pay to the SellersB.the Buyers shall pay to the CharterersC.the Sellers shall pay to the BuyersD.the Sellers shall pay to the Charterers

考题 The ladder shall ______.A.be secured in a position so that it rests firmly against the ship's side from which the discharge operations are carried outB.have at least two replacement steps which are secured in position by a method different from that used in the original constructionC.have battens made of hardwood,or other material of equivalent properties,in one piece and not less thanD.have steps made of softwood,or other material of equivalent properties,made in one piece free of knots,having an efficient slip surface

考题 材料:At around 0545 hrs the Cutter PILOT-5 approached the Vessel.The cutters skipper drew the pilots attention to the fact that the pilot ladder was hanging free in the air and did not stick to the ships side surface and he suggested to transfer the ladder more to the midship position.The answer to his suggestion was that it was not him who had to climb the ladder.At that time the vessel weighed the anchor and started her engine.Half the propeller was emerged from the water.The pilot called the vessel and ordered to stop her engine. Because the gangway was already extended,the skipper decided to approach the vessel from the bow.The 2nd Officer was standing at the upper platform. of the gangway while the 3rd Officer was standing at the lower platform. in order to secure the pilot.The ladder was correctly lit and the Officers had a radio contact with the bridge.At around 0600 hrs the pilot,assisted by the pilot boat engineer,stepped on the pilot ladder and started to climb up.PILOT-5 turned backwards and its crew was observing the Pilot embarkation.When the Pilot climbed up to the lower platform. he asked for help.The 3rd Officer extended his hand to him.At that moment the pilots hands slipped off the pilot ladder lines and the pilot fell from a height of 7 metres into the water.问题:The vessel rigged _______.A.pilot ladder onlyB.gangway onlyC.pilot ladder in combination with the gangwayD.neither pilot ladder nor the gangwayThe passage indicates _______.A.the vessel has deep draughtsB.the vessel has large freeboard even fully loadedC.the vessel is in ballastD.the vessel is fully loadedThe pilot ________.A.did not know that the pilot ladder was improperly riggedB.knew that the pilot ladder was not rigged properly but still climbed on itC.did not believe that the pilot ladder was not rigged properlyD.did not see the unstable movement of the vessel when he climbed on the pilot ladderWho is to blame for the accident according to the passage ___________.A.the pilotB.the vesselC.the pilot boatD.the officers onboard the vessel请帮忙给出每个问题的正确答案和分析,谢谢!

考题 你想把引航员梯装在哪一舷?()A、On which side must I rig the pilot ladder?B、On which side do you want the ladder rigged?C、On what side must I rig the pilot ladder?D、On which side do you want the gangway rigged?

考题 On which side shall I rig the pilot ladder? ()A、On deck.B、On right side.C、On starboard.D、On left side.

考题 When the pilot is climbing up the ladder ,what will you say?()A、Careful!B、Watch your step!C、Get hold of the ladder!D、A 、B and C

考题 把引航员梯装在下风舷。()A、Fit the rope ladder in the lee side.B、Rig the rope ladder in the lee side.C、Rig the pilot ladder on the lee side.

考题 单选题()of the ladder!A Get holdB HoldC GetD Hold on

考题 单选题把引航员梯装在下风舷。()A Fit the rope ladder in the lee side.B Rig the rope ladder in the lee side.C Rig the pilot ladder on the lee side.

考题 单选题During the day,a vessel picking up a submarine cable shall carry().A three shapes,the highest and lowest shall be red balls,and the middle shall be a white diamondB two black ballsC three shapes; the highest and lowest shall be black balls,and the middle shall be a red diamondD three shapes; the highest and lowest shall be black balls and the middle shall be a black diamond

考题 单选题Lower the ()ladder.A embarkB embarkationC disembarkD B+C

考题 单选题ALL GEAR,SUCH AS PILOT LADDER,ACCOMMODATION LADDER,HOIST,ETC.,NECESSARY FOR A SAFE TRANSFER OF THE PILOT is known as ().A RigginsB GearsC Boarding arrangementsD Fittings

考题 问答题何谓off-ladder。

考题 单选题What shall be conducted during a fire and boat drill?()A All watertight doors which are in use while the vessel is underway shall be operatedB All lifeboat equipment shall be examinedC Fire pumps shall be started and all exterior outlets openedD All of the above

考题 单选题It is a very difficult problem,but I think I shall worked it out by nine o’clock.A I shall work it outB I shall have worked it outC I shall be working it outD I must have worked it out

考题 单选题A rope ladder with wooden rungs is a().A drop ladderB life ladderC Jacob's ladderD jury ladder

考题 单选题你想把引航员梯装在哪一舷?()A On which side must I rig the pilot ladder?B On which side do you want the ladder rigged?C On what side must I rig the pilot ladder?D On which side do you want the gangway rigged?

考题 单选题On which side shall I rig the pilot ladder? ()A On deck.B On right side.C On starboard.D On left side.

考题 单选题Line throwing apparatus aboard ship must contain().A two rockets,one of which shall be the buoyant typeB three rockets,one of which shall be the buoyant typeC four rockets,two of which shall be the buoyant typeD five rockets,two of which shall be the buoyant type

考题 单选题The step of a pilot ladder which prevents the ladder from twisting is the().A proof barB shifting barC long barD spreader