网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()
A

Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.

B

Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.

C

Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.

D

Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer  loops.


参考答案

参考解析
解析: 暂无解析
更多 “单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.B Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.C Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.D Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer loops.” 相关考题
考题 When considering migrating a POWER6 server with PCI-X and PCIe adapters to a Power 720, which statement is true?()A、PCIe adapters are supported only in I/O drawersB、PCI-X adapters are supported in both the CEC and in I/O drawersC、PCI-X adapters are supported in the CEC; PCIe adapters are supported in 12X I/O drawersD、PCIe adapters are supported in the CEC; PCI-X adapters are supported in 12X I/O drawers

考题 An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A、An additional switch for the new HMc  B、Asynchronous adapters on the new HMcC、The two 570 servers are directly connected to the new HMc  D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

考题 A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()A、PCIe adaptersB、PCI-X adaptersC、PCI-X and PCIe adaptersD、PCI, PCI-X and PCIe adapters

考题 A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()A、Two dual-port PCIe adaptersB、A four-port PCIe Ethernet adapterC、Four separate PCIe Ethernet adaptersD、Two embedded Integrated Virtual Ethernet adapters (IVE)

考题 Which of the following statements is true regarding implementing Live Partition Mobility on two existing POWER6 based systems?()A、The systems must use internal storage for boot purposes. B、All virtualized ethernet adapters must be numbered below 10. C、The mobile partition's network and disk access must be virtualized. D、Each system must be controlled by a different Hardware Management Console (HMC). 

考题 A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()A、Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAsB、Move the existing physical network and storage adapters to the new system and virtualize the I/O using a single VIO Server.C、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC connectors and dual HBAs.D、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC connectors and the other with dual HBAs.

考题 A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()A、PCIe adaptersB、PCI-X adaptersC、PCI-X andPCIe adaptersD、PCI, PCI-X andPCIe adapters

考题 A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or laterB、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMCC、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing oneD、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

考题 A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()A、Configure the PCIe SSD adapter and drive modules as a JBODB、Configure a pair of mirrored PCIe SSD adapters and drive modulesC、Configure the PCIe SSD adapter and drive modules in a RAID-6 arrayD、Configure the PCIe SSD adapter and drive modules in a RAID-5 array

考题 A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A、Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.B、Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.C、Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.D、Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer loops.

考题 A Power 770 customer needs to add additional I/O adapters.  There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()A、I/O Planning GuideB、Power Systems data sheetC、Power Systems Facts and FeaturesD、Run FLRT to recommend I/O features

考题 A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A、Populate the Power 750 first then add a GX+ adapter to support PCI-X and PCIe I/O drawer loops.B、Populate the Power 750 first then add 2 GX+ adapters to support PCI-X and PCIe I/O drawer loops.C、Populate the Power 750 first then add a GX++ adapter to support PCI-X and PCIe I/O drawer loops.D、Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X and PCIe I/O drawer loops.

考题 A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers. How many and what kind of drawers are needed to connect these adapters?()A、2 PCI-X drawers and 2 PCIe drawersB、3 PCI-X drawers and 4 PCIe drawersC、4 PCI-X drawers and 3 PCIe drawersD、4 PCI-X drawers and 2 PCIe drawers

考题 单选题A Power 770 customer needs to add additional I/O adapters.  There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()A I/O Planning GuideB Power Systems data sheetC Power Systems Facts and FeaturesD Run FLRT to recommend I/O features

考题 单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A An additional switch for the new HMCB Asynchronous adapters on the new HMCC The two 570 servers are directly connected to the new HMCD One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

考题 单选题A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()A PCIe adaptersB PCI-X adaptersC PCI-X andPCIe adaptersD PCI, PCI-X andPCIe adapters

考题 单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.B Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.C Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.D Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer loops.

考题 单选题When considering migrating a POWER6 server with PCI-X and PCIe adapters to a Power 720, which statement is true?()A PCIe adapters are supported only in I/O drawersB PCI-X adapters are supported in both the CEC and in I/O drawersC PCI-X adapters are supported in the CEC; PCIe adapters are supported in 12X I/O drawersD PCIe adapters are supported in the CEC; PCI-X adapters are supported in 12X I/O drawers

考题 单选题A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()A All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or laterB The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMCC They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing oneD The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

考题 单选题A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers. How many and what kind of drawers are needed to connect these adapters?()A 2 PCI-X drawers and 2 PCIe drawersB 3 PCI-X drawers and 4 PCIe drawersC 4 PCI-X drawers and 3 PCIe drawersD 4 PCI-X drawers and 2 PCIe drawers

考题 单选题Which of the following statements is true regarding implementing Live Partition Mobility on two existing POWER6 based systems? ()A  The systems must use internal storage for boot purposes.B  All virtualized Ethernet adapters must be numbered below 10.C  The mobile partition’s network and disk access must be virtualized.D  Each system must be controlled by a different Hardware Management Console (HMC).

考题 单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A Populate the Power 750 first then add a GX+ adapter to support PCI-X and PCIe I/O drawer loops.B Populate the Power 750 first then add 2 GX+ adapters to support PCI-X and PCIe I/O drawer loops.C Populate the Power 750 first then add a GX++ adapter to support PCI-X and PCIe I/O drawer loops.D Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X and PCIe I/O drawer loops.

考题 单选题A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()A Configure the PCIe SSD adapter and drive modules as a JBODB Configure a pair of mirrored PCIe SSD adapters and drive modulesC Configure the PCIe SSD adapter and drive modules in a RAID-6 arrayD Configure the PCIe SSD adapter and drive modules in a RAID-5 array

考题 单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.B Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.C Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.D Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer loops.

考题 单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A Populate the Power 750 first then add a GX+ adapter to support PCI-X and PCIe I/O drawer loops.B Populate the Power 750 first then add 2 GX+ adapters to support PCI-X and PCIe I/O drawer loops.C Populate the Power 750 first then add a GX++ adapter to support PCI-X and PCIe I/O drawer loops.D Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X and PCIe I/O drawer loops.

考题 单选题A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()A Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAsB Move the existing physical network and storage adapters to the new system and virtualize the I/O using a single VIO Server.C Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC connectors and dual HBAs.D Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC connectors and the other with dual HBAs.

考题 单选题A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()A PCIe adaptersB PCI-X adaptersC PCI-X and PCIe adaptersD PCI, PCI-X and PCIe adapters

考题 单选题A small organization is purchasing a POWER5 to consolidate four applications. Currently, each application has two Host Bus Adapters (HBA) connected to an Enterprise Storage Server (ESS). The customer is concerned about the cost of purchasing eight new HBAs. Which feature of virtualization will be most beneficial to this organization?()A Virtual EthernetB Micro-PartitioningC Virtual I/O ServerD Capped and uncapped partitions