网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A Power 770 customer needs to add additional I/O adapters.  There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()
A

I/O Planning Guide

B

Power Systems data sheet

C

Power Systems Facts and Features

D

Run FLRT to recommend I/O features


参考答案

参考解析
解析: 暂无解析
更多 “单选题A Power 770 customer needs to add additional I/O adapters.  There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()A I/O Planning GuideB Power Systems data sheetC Power Systems Facts and FeaturesD Run FLRT to recommend I/O features” 相关考题
考题 A customer has ordered a rack, a p650, two p630s, and two p615s.  During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit.  However, the specialist knows that the p650 will be racked, but the other systems will arrive separately.  In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()A、Because additional systems would require more power receptaclesB、Because the customer may need to do additional facilities planningC、Because the customer needs additional funding to cover the servicesD、Because postponing the eventual discussion will likely lead to customer dissatisfaction

考题 A web server has to be available all the time.It has its own redundant power source anduninterruptible power supply(UPS).Which of the following actions will provide additional fault to lerance?()A、Add a second DVD driveB、Add an extended runtime module(ERM) to the UPSC、Configure automated system recovery(ASR)D、Add a second NIC

考题 A company needs additional storage for a block I/O based database application. The application has low I/O bandwidth requirements across the campus. The customer has a TCP/IP infrastructure and is interested in low-cost products that are compatible with its environment. Which technology is most appropriate for this customer?()A、SANB、FCoEC、FCIPD、iSCSI

考题 A customer wants to add a new application to their existing IBM System Storage DS5300. Theyexpect that the new application will require a minimum of 15,000 additional IOPS. What toolshould be used to determine what additional disk is required to effectively add the newapplication?()A、eConfigB、Disk MagicC、Capacity MagicD、Tivoli Storage Productivity Center for Data

考题 A customer has an existing DS5300 system attached to two Brocade switches with eight Windowsservers. The customer wants to add their System i p750 server to this SAN. From the followingchoices what is the simplest and least expensive solution for this customer?()A、add twofibre HBAs to the System i and connect to the SANB、add twofibre HBAs to the System i and connect to the Windows ServersC、add twofibre HBAs to the System i and connect to the System i using VIOSD、add two SAS HBAs to the Systemi array and connect directly to the DS5300

考题 A customer server has the maximum local storage installed. The customer plans to share this new storage with other servers. Which of the following provides that server additional storage?()A、Add External Storage via EXP3000B、Replace current storage with more dense drivesC、Add External Storage via SAND、Add storage expansion blade

考题 A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()A、An IBM BladeCenter H chassis for the JS22 Blade serversB、A concurrent KVM daughter cardC、A pair of IBM BladeCenter Power SuppliesD、A second Management Module

考题 A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()A、Two dual-port PCIe adaptersB、A four-port PCIe Ethernet adapterC、Four separate PCIe Ethernet adaptersD、Two embedded Integrated Virtual Ethernet adapters (IVE)

考题 A customer had been given a proposal for a p5-570 6-way 32GB system running in Full Partition mode.  After review, the customer asked that the configuration be modified to enhance the reliability and availability of the solution.  However, the customer does not want to pay for HACMP or additional machines.  What change would be most likely to improve the reliability of the solution?()A、Add CUoD memory.B、Provide CUoD processors.C、Provide redundant disks on separate SCSI buses.D、Add redundant power supplies in the p5-570 CEC (Central Electronics Complex).

考题 A customer is debating whether to use Shared Ethernet versus Virtual Ethernet.  Which of the following best describes a key difference between Shared and Virtual Ethernet?()A、Shared Ethernet runs on POWER4 systemsB、Virtual Ethernet runs on POWER4 systemsC、Shared Ethernet requires a Virtual I/O server and Advanced Power VirtualizationD、Virtual Ethernet requires a Virtual I/O server and Advanced Power Virtualization

考题 A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications.   The pSeries technical specialist should recommend purchasing which of the following?()A、p5 hardware, AIX 5.2, Virtual I/O ServerB、POWER4 hardware, AIX 5.3, Virtual I/O Server,C、p5 hardware, AIX 5.3, Advanced POWER Virtualization featureD、POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature

考题 A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()A、Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAsB、Move the existing physical network and storage adapters to the new system and virtualize the I/O using a single VIO Server.C、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC connectors and dual HBAs.D、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC connectors and the other with dual HBAs.

考题 A customer has an IBM System Storage DS8100 with 128 DDMs and needs to add additional capacity.  What must be verified by the Business Partner during the visit to the computer room()A、the space for the upgrade to a DS8700B、the space on the left of the DS8000 for an expansion frameC、the space on the right of the DS8000 for an expansion frameD、the space to install additional DDMs in the base frame

考题 A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()A、PCIe adaptersB、PCI-X adaptersC、PCI-X andPCIe adaptersD、PCI, PCI-X andPCIe adapters

考题 A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or laterB、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMCC、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing oneD、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

考题 A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()A、A second IVE adapterB、A second processor cardC、PowerVM Enterprise EditionD、An additional cable-management arm

考题 A Power 770 customer needs to add additional I/O adapters.  There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()A、I/O Planning GuideB、Power Systems data sheetC、Power Systems Facts and FeaturesD、Run FLRT to recommend I/O features

考题 A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A、Populate the Power 750 first then add a GX+ adapter to support PCI-X and PCIe I/O drawer loops.B、Populate the Power 750 first then add 2 GX+ adapters to support PCI-X and PCIe I/O drawer loops.C、Populate the Power 750 first then add a GX++ adapter to support PCI-X and PCIe I/O drawer loops.D、Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X and PCIe I/O drawer loops.

考题 A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers. How many and what kind of drawers are needed to connect these adapters?()A、2 PCI-X drawers and 2 PCIe drawersB、3 PCI-X drawers and 4 PCIe drawersC、4 PCI-X drawers and 3 PCIe drawersD、4 PCI-X drawers and 2 PCIe drawers

考题 An IT director needs to deploy 3 partitions, each using dedicated internal boot disk. Which system will support the customer requirement using the least amount of rack space?()A、Power 770 serversB、Power 750 serversC、Power 755 serversD、Power 720 servers

考题 单选题A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()A An IBM BladeCenter H chassis for the JS22 Blade serversB A concurrent KVM daughter cardC A pair of IBM BladeCenter Power SuppliesD A second Management Module

考题 单选题A customer has two Power 770 systems with 4 enclosures each.  Thirty two cores and 1TB of memory are activated on each system.  Each system has 3 database partitions and each partition has 10 cores and 300GB of memory.   Which solution will provide automated recovery of unplanned outages at least cost?()A Purchase PowerVM Enterprise Edition.Use System Director to automate Live Partition Mobility to recover from partition failureB Create additional shared processor partitions as standby nodes.Use PowerHA SystemMirror to activate and use CoD resources when a failover occursC Purchase an additional 32-core Power 750 with PowerHA SystemMirror Standard Edition.Use the new system as standby node with the XD component of PowerHAD Purchase an additional Power 770 system.Locate production and standby database partitions on each system.Use DB2 pureScale to provide automated partition monitoring and failover

考题 单选题A customer has an IBM System Storage DS8100 with 128 DDMs and needs to add additional capacity.  What must be verified by the Business Partner during the visit to the computer room()A the space for the upgrade to a DS8700B the space on the left of the DS8000 for an expansion frameC the space on the right of the DS8000 for an expansion frameD the space to install additional DDMs in the base frame

考题 单选题A customer has no available floor space for expansion and room for only one disk enclosure pair in their DS8700. Four disk enclosure pairs are required to meet the current I/O needs of a data warehousing application. They are only utilizing 10% of their total capacity. Another application workload needs to be added to the system but requires two disk enclosure pairs. The customer is considering SSD and Easy Tier.  Which of the following is the primary function of Easy Tier()A reduce power consumption per unit of storageB balance the total workload with other DAsC automatically moves hot spots to the appropriate resourceD SANtiering permits more flexibility by adding additional data paths

考题 单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()A Explain to the customer that they need an additional HMC for the POWER5 system.B Obtain a PO from the customer to purchase additional serial connections to the HMC.C Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.D Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.

考题 单选题A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition. They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()A A second IVE adapterB A second processor cardC PowerVM Enterprise EditionD An additional cable-management arm