网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()
A

The new system requires 1 installed processor card for the GX++ bus adapter

B

The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter

C

The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter

D

The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand  cluster adapter


参考答案

参考解析
解析: 暂无解析
更多 “单选题What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A The new system requires 1 installed processor card for the GX++ bus adapterB The new system requires a minimum of 2 installed processor cards for the GX++ bus adapterC The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterD The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter” 相关考题
考题 Which of the following is MOST critical when installing a new processor in an existing system?() A. Thermal pasteB. FansC. Drive speedsD. Cable management

考题 In the event of a catastrophic disaster, after which you need to replace the entire UCS blade system (that is, new fabric interconnects, new IOMs, new chassis, and new blades), what type of backup would provide the most complete set of information?()A、 logical configurationB、 all configurationC、 full stateD、 system configuration

考题 A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimum configuration which will support this?()A、One processor card and one GX+ expansion cardB、Two processor cards and one GX++ expansion cardC、One processor card, one GX+ expansion card, and one GX++ expansion cardD、Two processor cards, one GX+ expansion card, and one GX++ expansion card

考题 An HP customer would like to discuss IBM system advantages. Their current system platform is a partitioned HP rp8400. Which of the following pSeries systems and advantages should be discussed?()A、p630. Maximum partitions, maximum storage, I/O bus speedB、p670. Maximum partitions, maximum memory, number of I/O slotsC、p655. Maximum number of CPUs, processor speed, number of I/O slotsD、p690. Maximum number of CPUs, peak system bandwidth, peak I/O bandwidth

考题 Which of the following is MOST critical when installing a new processor in an existing system?()A、Thermal pasteB、FansC、Drive speedsD、Cable management

考题 A technician has just installed an upgraded graphics card. The computers power turns off before itfinishes booting. Which of the following is the cause of the problem? ()A、The monitor cannot display the increased resolution that is a feature of the new graphics card.B、The power supply does not provide enough wattage to power the new graphics card.C、The new graphics card is incompatible with the existing processor.D、The computer does not have enough RAM to support the new graphics card.

考题 A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()A、e-ConfigB、System Planning Tool (SPT)C、IBM Workload Estimator (WLE)D、IBM Performance Monitor (PM)

考题 A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A、 vmstat and iostat data from the older machines B、 The number of CPUs that were installed in the original machines C、 Data from Workload Estimator (WLE) and IBM Performance Management (PM) D、 Performance data that is collected from the new system after it has been put into production

考题 A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()A、Configure the PCIe SSD adapter and drive modules as a JBODB、Configure a pair of mirrored PCIe SSD adapters and drive modulesC、Configure the PCIe SSD adapter and drive modules in a RAID-6 arrayD、Configure the PCIe SSD adapter and drive modules in a RAID-5 array

考题 A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()A、Power 710B、Power 720C、Power 730D、Power 740

考题 What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A、The new system requires 1 installed processor card for the GX++ bus adapterB、The new system requires a minimum of 2 installed processor cards for the GX++ bus adapterC、The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterD、The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter

考题 A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()A、A second IVE adapterB、A second processor cardC、PowerVM Enterprise EditionD、An additional cable-management arm

考题 A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A、Order a new HMC to support the p5 system.B、Attach the new p5 system to the existing HMC.C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D、Do nothing.  This system does not require an HMC.

考题 单选题In the event of a catastrophic disaster, after which you need to replace the entire UCS blade system (that is, new fabric interconnects, new IOMs, new chassis, and new blades), what type of backup would provide the most complete set of information?()A  logical configurationB  all configurationC  full stateD  system configuration

考题 单选题A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()A e-ConfigB System Planning Tool (SPT)C IBM Workload Estimator (WLE)D IBM Performance Monitor (PM)

考题 单选题A technician has just installed an upgraded graphics card. The computers power turns off before itfinishes booting. Which of the following is the cause of the problem? ()A The monitor cannot display the increased resolution that is a feature of the new graphics card.B The power supply does not provide enough wattage to power the new graphics card.C The new graphics card is incompatible with the existing processor.D The computer does not have enough RAM to support the new graphics card.

考题 单选题A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A  vmstat and iostat data from the older machinesB  The number of CPUs that were installed in the original machinesC  Data from Workload Estimator (WLE) and IBM Performance Management (PM)D  Performance data that is collected from the new system after it has been put into production

考题 单选题What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A The new system requires 1 installed processor card for the GX++ bus adapterB The new system requires a minimum of 2 installed processor cards for the GX++ bus adapterC The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterD The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter

考题 单选题A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A  vmstat and iostat data from the older machines B  The number of CPUs that were installed in the original machines C  Data from Workload Estimator (WLE) and IBM Performance Management (PM) D  Performance data that is collected from the new system after it has been put into production

考题 单选题An HP customer would like to discuss IBM system advantages. Their current system platform is a partitioned HP rp8400. Which of the following pSeries systems and advantages should be discussed?()A p630. Maximum partitions, maximum storage, I/O bus speedB p670. Maximum partitions, maximum memory, number of I/O slotsC p655. Maximum number of CPUs, processor speed, number of I/O slotsD p690. Maximum number of CPUs, peak system bandwidth, peak I/O bandwidth

考题 单选题A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()A Configure the PCIe SSD adapter and drive modules as a JBODB Configure a pair of mirrored PCIe SSD adapters and drive modulesC Configure the PCIe SSD adapter and drive modules in a RAID-6 arrayD Configure the PCIe SSD adapter and drive modules in a RAID-5 array

考题 单选题A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()A Power 710B Power 720C Power 730D Power 740

考题 单选题A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A Order a new HMC to support the p5 system.B Attach the new p5 system to the existing HMC.C Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D Do nothing.  This system does not require an HMC.

考题 单选题Which of the following is MOST critical when installing a new processor in an existing system?()A Thermal pasteB FansC Drive speedsD Cable management

考题 单选题A customer requires an infrastructure to support disaster recovery of critical applications between two remote data centers. One data center is in Tokyo and one is in Beijing. The customer’s Recovery Point Objective (RPO) requires a six-hour window for a bandwidth of 100 MB/s and a new storage system for a total of 4 TB of data. They estimate 100 MB of new data produced hourly. What data synchronization method would be recommended to meet the requirements()A Metro MirrorB FlashCopyC Global MirrorD Snapshot

考题 单选题A customer wants to migrate their existing cluster onto new POWER6 hardware, and in addition requires thecluster to be migrated from PowerHA version 5.3 to 5.5. Given that AIX 6.1 and PowerHA 5.5 filesets arealready installed in the new hardware, which of the following methods would allow the customer to maintaintheir current cluster configuration?()A Add the new nodes to the existing cluster, and perform a rolling migration and remove the original nodesfrom the clusterB Add the new nodes to the existing cluster, and perform a non-disruptive upgrade and remove the originalnodes from the cluster.C Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Start cluster serviceson the new cluster and stop the original clusterD Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Stop cluster serviceson the original cluster and start on the new cluster

考题 单选题Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations.  Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()A IBM eConfigB IBM Performance MonitorC IBM Workload Estimator (WLE)D IBM System Planning Tool (SPT)

考题 单选题A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimum configuration which will support this?()A One processor card and one GX+ expansion cardB Two processor cards and one GX++ expansion cardC One processor card, one GX+ expansion card, and one GX++ expansion cardD Two processor cards, one GX+ expansion card, and one GX++ expansion card