网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
In an automatic mooring winches, the wire is paid off the barrel at() a tension and is recovered at()tension.
A

lower;igher

B

maximum;higher

C

predetermined minimum;higher

D

predetermined maximum;lower


参考答案

参考解析
解析: 暂无解析
更多 “单选题In an automatic mooring winches, the wire is paid off the barrel at() a tension and is recovered at()tension.A lower;igherB maximum;higherC predetermined minimum;higherD predetermined maximum;lower” 相关考题
考题 Susan was determined to become a doctor and her persistence paid _______. (A) back(B) for(C) off(D) out

考题 The spur geared mooring winches have advantages over worm geared ones in .A.higher efficiency of the gear train while reversingB.the higher gear ratioC.the multi-start featureD.higher recovering speed

考题 With the booming internet subscribers, ( ) in the information technology finally paid off. A. investB. investigationC. investmentD. debt

考题 Roll-on/roll-off ships are equipped with ________ .A.cargo elevatorsB.conveyor beltsC.rampsD.derricks and winches for cargo handling

考题 Given the same water depth and line tension, the holding power of a 19 pound / foot wire rope mooring system in comparison to the holding power of a 90 pound / foot chain mooring system will be ______.A.weakerB.equalC.greaterD.Indeterminable

考题 In a combination chain and wire rope mooring system, the anchor chain is deployed at the anchor end of the line to ______.A.increase fatigue life of the systemB.reduce the time to retrieve the lineC.increase the holding powerD.reduce the catenary

考题 “If we fail to act now,” said Tom, “We’ll find ourselves ______ in action later on.”A.paid back B.paid for C.paid up D.paid off

考题 The()(千斤索) is a wire used to take the weight off.A、light derrickB、union purchaseC、topping liftD、heavy derrick

考题 单选题The majority of automatic mooring winches are spur geared to improve the backward efficiency of the gear train for rendering()A spur gearedB screw gearedC worm gearedD belt driven

考题 单选题Two mooring lines may be placed on the same bollard and either one cast off first if().A the eye of the second line is dippedB the mooring lines are doubledC the bollard has two hornsD one of the lines is a breast line

考题 单选题The spur geared mooring winches have advantages over worm geared ones in()A higher efficiency of the gear train while reversingB the higher gear ratioC the multi-start featureD higher recovering speed

考题 单选题Chafing gear should be placed().A at all wearing points of mooring linesB at the bitter ends of all standing riggingC around running riggingD on wire rope only

考题 单选题In an automatic mooring winches, the wire is paid off the barrel at() a tension and is recovered at()tension.A lower;igherB maximum;higherC predetermined minimum;higherD predetermined maximum;lower

考题 单选题Roll-on/roll-off ships are equipped with().A cargo elevatorsB conveyor beltsC rampsD derricks and winches for cargo handling

考题 单选题In a combination chain and wire rope mooring system,the anchor chain is deployed at the anchor end of the line to().A increase fatigue life of the systemB reduce the time to retrieve the lineC increase the holding powerD reduce the catenary

考题 单选题What does the term end-for-end refer to in regard to a wire towing hawser().A Cutting off the bitter and towing ends of the wire ropeB Splicing two wire ropes togetherC Removing the wire rope from the drum and reversing it so that the towing end becomes the bitter endD Removing the wire rope from the drum and turning it over so that the wire bends in the opposite direction when rolled on a drum

考题 单选题Mooring winches are often combined with () units so that one prime mover drives both.A craneB hatch coverC windlassD steering gear

考题 单选题In automatic () the winch may be overhauled and wire is paid off the barrel at a pre-determined maximum tension.A cranesB windlassC capstansD mooring winches

考题 单选题Vessels lying afloat at buoys for more than 24 hours should use anchor chain for()and insurance wire for().A bow mooring/stern lineB forward spring/after springC forward breast rope/forward springD slip rope/stern line

考题 单选题() may be fitted for operating the derrick topping lift (the wire which adjusts the derrick height).A A capstanB A holdC A warp endD A mooring drum

考题 单选题A common class of wire rope used for mooring is the 6x19 class. What does the 6 represent?()A Factor of safetyB Number of wires per strandC Number of strands per wire ropeD Number of wires in the core

考题 单选题Worm geared automatic mooring winches are () as the multi-start feature reduces the advantage of worm gear iethe high gear radio.A popularB commonC in lead positionD uncommon

考题 单选题()connectors hold best if a wire is accidentally pulled or a connection becomes loose.A Ring typeB Fork typeC Spade typeD Push on pull off type

考题 单选题When the power is shut off, the wire()A becomes slackB can not be paid out unless the brake is overhauled or recover wire unless manually operatedC will be let out because the brake is out of workD may be pay out due to no power

考题 单选题Given the same water depth and line tension,the holding power of a 19 pound/foot wire rope mooring system in comparison to the holding power of a 90 pound/foot chain mooring system will be().A weakerB equalC greaterD indeterminable

考题 单选题A “spring line” is().A any wire rope used for mooringB a fire-warpC a mooring line running diagonally to the keelD a mooring line perpendicular to the keel

考题 单选题() shall be continuously powered and shall have an automatic changeover to a stand by power supply in case of loss of normal power supply.A Cooling systemB Alarm systemC The air conditioning installationD The mooring equipment

考题 单选题Which statement concerning an automatic towing engine is FALSE? ()A It automatically maintains tow line tensionB It prolongs the life of the hawser by distributing chafing as the hawser is paid out and taken inC As tension on the hawser increases,more line is taken in by the automatic towing engineD As tension on the hawser decreases,more line is taken in by the automatic towing engine