The safe working load of each derrick is five ().
A

tones

B

tonnages

C

tons

D

dunnage


参考答案

参考解析
解析: 暂无解析
更多 “单选题The safe working load of each derrick is five ().A tonesB tonnagesC tonsD dunnage” 相关考题
考题 What ________ the safe working load of the derrick?A.isB.beC.areD.has

考题 Cargo booms must be weight tested to recertify the Safe Working Load(SWL)every ______.A.YearB.Two yearsC.Four yearsD.Five years

考题 The safe working load for the assembled cargo gear and the minimum angle to the horizontal for which the gear is designed shall be marked on the ______.A.deckB.head of the boomC.heel of the boomD.mast or king post

考题 When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.A.winch speedB.boom strengthC.load radiusD.cable strength

考题 In relation to cargo gear, what does SWL mean ?______.A.Safe working loadB.Ship’s working liftC.Starboard wing liftD.Stress, weight, load

考题 The safe working load of the derrick is 5 tons.()A、吊杆的安全工作负荷量是5吨B、龙门吊的安全工作负荷量是5吨C、起货机的安全工作负荷量是5吨D、重吊杆的安全工作负荷量是5吨

考题 英文备注“the derrick safe working load 3t”的中文意思是:()A、吊杆的重量为3tB、吊杆吊起的重量是3tC、吊杆工作时不能吊起3t的货物D、吊杆安全负荷量3t

考题 The sailor on duty is ()the derrick now.A、doingB、adjustingC、workingD、working on

考题 The safe working load of the derrick is ().A、5 tonsB、5 metresC、5 feetD、5 years

考题 这个吊杆的安全工作负荷是6吨。()A、The SWL of the derrick is five tons.B、The SWL of the heavy derrick is six tons.C、The SWL of the derrick is six tons.D、The SWL of the crane is six tons.

考题 安全负荷量()A、the loadB、safe working loadC、safe workingD、safe loading work

考题 Sailors should know the ()(安全工作负荷量)of derricks.A、safe working loadB、safety work loadC、safe work loadD、safe working loading

考题 “SWL” means ().A、safe working loadB、safe work loadC、safe worked loadD、safely working load

考题 You are working on an existing Web site. You need to secure the Web site by redirecting all users to the logon page, Login.aspx. After logging on, users must be sent back to the page that they originally requested. Which code segment should you use? ()A、 In the Web.config file: authorization deny users=”?”//authorization On each page in the Web site: void Page_Load(Object sender, EventArgs E){ FormsAuthentication.Initialize(); //Rest of the Page_Load code goes here}B、On each page in the Web site: void Page_Load(Object sender, EventArgs E){ FormsAuthentication.RedirectToLoginPage(“login.aspx”); //Rest of the Page_Load code goes here}C、On each page in the Web site: void Page_Load(Object sender, EventArgs E){ Response.Redirect(“login.aspx”);//Rest of the Page_Load code goes here}D、In the Web.config file: authentication mode=”Forms” forms name=”.ASPXUSERDEMO” loginUrl=”login.aspx” protection=”All”timeout=”60” / /authentication

考题 单选题这个吊杆的安全工作负荷是6吨。()A The SWL of the derrick is five tons.B The SWL of the heavy derrick is six tons.C The SWL of the derrick is six tons.D The SWL of the crane is six tons.

考题 单选题In determining a safe speed()shall not be among those taken into account.A the characteristics,efficiency and limitation of the radar equipmentB any constraints imposed by the radar range scale in useC the effect on radar detection of the sea state,weather and other sources of interferenceD the safe working load of the cranes both on board and ashore

考题 单选题The safe working load of the derrick is ().A 5 tonsB 5 metresC 5 feetD 5 years

考题 单选题During operation, the ()should check the working condition of the derrick.A foremanB operatorC openerD stevedore

考题 单选题Which statement is TRUE about nylon line?()A Manila line will usually last longer than nylon lineB Nylon line is excellent for use in alongside towingC A normal safe working load will stretch nylon line 50%D Nylon stoppers should be used with nylon line

考题 单选题The MINIMUM acceptable size for a towing bridle would be that size in which the safe working load (SWL) of each leg of the bridle is equal to().A one-half the SWL of the main towing hawserB three-fourths the SWL of the main towing hawserC that of the main towing hawserD twice that of the main towing hawser

考题 单选题Thirty-five percent of the breaking strength of an anchor cable is generally accepted as the().A safe operating loadB normal operating tensionC emergency working loadD allowable storm load

考题 单选题Electric cargo winches have an overload safety device which normally cuts the current to the winch motor().A after torque causes line pull to exceed the rated capacity of the winchB before the line pull reaches the rated capacity of the winchC when the line pull reaches the breaking strength of the fallD before the safe working load of the fall is reached

考题 单选题“SWL” means ().A safe working loadB safe work loadC safe worked loadD safely working load

考题 单选题The safe working load for the assembled cargo gear and the minimum angle to the horizontal for which the gear is designed shall be marked on the().A deckB head of the boomC heel of the boomD mast or king post

考题 单选题The safe working load of the derrick is 5 tons.()A 吊杆的安全工作负荷量是5吨B 龙门吊的安全工作负荷量是5吨C 起货机的安全工作负荷量是5吨D 重吊杆的安全工作负荷量是5吨

考题 单选题The safe working load of the ()is 100 tons.A single derrickB derrickC heavy derrickD deck

考题 单选题Cargo booms must be weight tested to recertify the Safe Working Load (SWL) every().A yearB two yearsC four yearsD five years