网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
“SWL” means ().
A

safe working load

B

safe work load

C

safe worked load

D

safely working load


参考答案

参考解析
解析: 暂无解析
更多 “单选题“SWL” means ().A safe working loadB safe work loadC safe worked loadD safely working load” 相关考题
考题 () much harder work, the volunteers were able to place the raging forest fire(). A.By the means of…under the controlB.By means of…under controlC.By means of…under a controlD.By a means of…under control

考题 Doing()means death. Activity means life. A、everythingB、nothing

考题 One can never find out what the other people think about from his facial expression. A、It means "wearing the mask"B、It means "keeping ideas to herself"C、It means "telling everyone her bright ideas"D、It means "agreeing with others’ ideas"

考题 -Does "am"___ afternoon-No, it morning.A. means,meanB. means, meansC. mean, means

考题 What does “SWL” stand for?/ represent

考题 在核心交换机中设置了各个VLAN,在交换机Sw1中将端口1~20划归销售部,请完成以下配置。Swl(config) interface range fastethernet0/1-20 //进入组配置状态Swl(config-if-range) (4) //设置端口工作在访问(接入)模式Swl(config-if-range) (5) //设置端口1~20为VLAN 10的成员

考题 在默认情况下,交换机刚加电启动时,每个端口都要经历生成树的四个阶段,它们分别是:阻塞、侦听、(6)、(7)。2.根据需求,需要将Swl交换机的端口1~20设置为快速端口,完成以下配置。Swl(config) interface range fastethernet 0/1-20 //进入组配置状态Swl(config-if-range) (8) //设置端口1~20为快速端口

考题 某企业园区网采用了三层架构,按照需求,在网络中需要设置VLAN、快速端口、链路捆绑、Intemet接人等功能。该园区网内部分VLAN和IP地址如表所示。某交换机的配置命令如下。根据命令后面的注释,填写(1)一(3)处的空缺内容,完成配置命令。Switch(config)(1)将交换机命名为SwlSwl(config)interface vlan 1$wl(config—if)(2)设置交换机的IP地址为192.168.1.1/24Swl(config—if)no shutdownSwl(config)(3)设置交换机默认网关地址在核心交换机中设置了各个VLAN,在交换机Swl中将端口1—20划归销售部,请完成以下配置。Swl(config)interface range fastethemet0/l一20进入组配置状态Swl(config—if—range)(4)设置端口工作在访问(接入)模式Swl(config—if—range)(5)设置端口1—20为VLAN 10的成员

考题 On no account ______ to be exceeded.A.is the SWL of the craneB.are the SWL of the craneC.the SWL of the crane isD.the SWL of the crane are

考题 水手应该知道船上吊杆的安全工作负荷。()A、Sailors should know the SWL of cranes on board their ship.B、Sailors should know the SWL of derricks on board their ship.C、Officers should know the SWL of derricks on board their ship.D、Officers should know the SWL of cranes on board their ship.

考题 这个吊杆的安全工作负荷是6吨。()A、The SWL of the derrick is five tons.B、The SWL of the heavy derrick is six tons.C、The SWL of the derrick is six tons.D、The SWL of the crane is six tons.

考题 CTCS2-200H型列控车载设备主机VC上设有SWl、SW2、SW3拨码开关,SWl用于设定()

考题 CTCS2-200H型列控车载设备,对于CRH5型动车组,SWl开关设定为()

考题 单选题这个吊杆的安全工作负荷是6吨。()A The SWL of the derrick is five tons.B The SWL of the heavy derrick is six tons.C The SWL of the derrick is six tons.D The SWL of the crane is six tons.

考题 单选题What DOCS SALT WATER DRAFT means?().A It means summer draftB It means Maximum draftC It means Fresh Water draftD It means Seawater Draft

考题 单选题In relation to cargo gear,what does SWL mean?().A Safe working loadB Ships working liftC Starboard wing liftD Stress , weight , load

考题 单选题In relation to cargo gear,what does SWL mean?().A Safe working loadB Ship's working liftC Starboard wing liftD Stress,weight,load

考题 单选题对吊杆进行保持悬挂试验时,其试验负荷为()KN。A SWL在196KN以下的,试验负荷为SWL³1.125B 对196KN<SWL≤490KN的,试验负荷为SWL+49C SWL在490KN以上的,试验负荷为SWL³1.11D 以上都对

考题 单选题On no account()to be exceeded.A is the SWL of the craneB are the SWL of the craneC the SWL of the crane isD the SWL of the crane are

考题 单选题The MINIMUM acceptable size for a towing bridle would be that size in which the safe working load (SWL) of each leg of the bridle is equal to().A one-half the SWL of the main towing hawserB three-fourths the SWL of the main towing hawserC that of the main towing hawserD twice that of the main towing hawser

考题 填空题CTCS2-200H型列控车载设备,对于CRHl型动车组,SWl开关设定为()

考题 填空题CTCS2-200H型列控车载设备,对于CRH5型动车组,SWl开关设定为()

考题 填空题CTCS2-200H型列控车载设备主机VC上设有SWl、SW2、SW3拨码开关,SWl用于设定()

考题 单选题What does salt water draft mean?().A It means summer draftB It means maximum draftC It means fresh water draftD It means seawater draft

考题 单选题起重设备的试验负荷是根据其SWL来确定的,如其SWL=215.6KN,则其试验负荷应为()。A 1.125³SWLB SWL+1.125C 1.11³SWLD SWL+49

考题 单选题What does the abbreviation SWL stand for?().A Signal wave lettersB Ship without lightC Safe water lineD Safe working load

考题 单选题Cargo booms must be weight tested to recertify the Safe Working Load (SWL) every().A yearB two yearsC four yearsD five years