网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The unit of duration of a dash in Morse Code is().
A

one and one-half times the length of a dot

B

twice the length of a dot

C

three times the length of a dot

D

four times the length of a dot


参考答案

参考解析
解析: 暂无解析
更多 “单选题The unit of duration of a dash in Morse Code is().A one and one-half times the length of a dotB twice the length of a dotC three times the length of a dotD four times the length of a dot” 相关考题
考题 哪种情况下()提示患者有发生坠床跌倒的高度风险,护士需落实坠床跌倒的防范措施。 A、Morse评分≥45分、Humpty-Dumpty≥12分B、Morse评分≥40分、Humpty-Dumpty≥8分C、Morse评分≥45分、Humpty-Dumpty≥11分D、Morse评分≥40分、Humpty-Dumpty≥10分

考题 Project schedule management is made up of six management processes including: activity definition, activity sequencing()and schedule control by order. A.activity duration estimating, schedule developing, activity resource estimatingB.activity resource estimating, activity duration estimating, schedule developmentC.schedule developing, activity resource estimating, activity duration estimatingD.activity resource estimating, schedule developing, activity duration estimating

考题 Atoll的uSeR pRofile中主要对以下参数进行设置:() A.SeRviCe、teRmiNAl、CAll/houR、duRAtioN、UL/DLvolumeB.CAll/houR、duRAtioN、UL/DLvolumeC.SeRviCe、teRmiNAlD.SeRviCe、teRmiNAl、CAll/houR、duRAtioN

考题 ● XP is (1)of interesting twists that encourage one to think -- for example, how about "Test and then code"? I’ve worked with software companies and a few IT organizations in (2)programmer performance was measured on lines of code delivered and testing was measured on defects found ---- (3)side was motivated to reduce the number of defects prior to testing. XP uses two types of testing: unit and functional.(4), the practice for unit testing involves developing the test for the feature prior to writing the code and further states that the tests should be automated. Once the code is written, it is immediately (5)to the test suite bringing instant feedback.(1)A. filled B. stuff C. pack D. full(2)A. them B. where C. that D. which(3)A. both B. neither C. no D. either(4)A. whereas B. Although C. However D. And then(5)A. subjected B. submitted C. sent D. suffered

考题 XP is (71) of interesting twists that encourage one to think--for example, how about "Test and then code"? I've worked with software companies and a few IT organizations in (72) programmer performance was measured on lines of code delivered and testing was measured on defects found-- (73) side was motivated to reduce the number of defects prior to testing. XP uses two types of testing: unit and functional. (74) , the practice for unit testing involves developing the test for the feature prior to writing the code and further states that the tests should be automated. Once the code is written, it is immediately (75) to the test suite bringing instant feedback.A.filledB.stuffC.packD.full

考题 CDMA for cellular system can be described as follows. As with FDMA, each cell is allocated a frequency (71) , when is split into two parts, half for reverse (mobile unit to base station) and half for (72) (base station to mobile unit). For full-duplex (73) , a mobile unit both reverse and forward channels. Transmission is in the form. of direct-sequence spread (74) , which used a chipping code to increase the data rate of the transmission, resulting is an increased signal bandwidth. Multiple access is provided by assigning (75) chipping codes to multiple users, so that the receiver can recover the transmission of an individual unit from multiple transmissions.A.wareB.signalC.bandwidthD.domain

考题 Any person maintaining a listening watch on a bridge to bridge radio-telephone must be able to ______.A.Speak EnglishB.Speak SpanishC.Send Morse codeD.Repair the unit

考题 CDMA for cellular systems can be described as follows.As with FDMA,each cell is allocated a frequency( ),which is split into two parts,half for reverse(mobile unit to base station)and half for( )(base station to mobile unit).For full-duplex( ).a mobile unit uses both reverse and forwardchannels.Transmission is in the form of direct-sequence spread(本题),which uses a chipping code to increase the data rate of the transmission,resulting inan increased signal bandwidth.Multiple access is provided by assigning( )chipping codes to multiple users,so that the receiver can recover the transmission of an individual unit from multiple transmissions.A.structure B.spectrum C.stream D.strategy

考题 With reference to the requirements under IMO MODU CODE,Operating manuals containing guidance for the safe operation of the MODU unit for both normal and envisaged emergency conditions, to the satisfaction of the Administration should be provided on board and be readily available to all concerned. The manuals should, in addition to providing the necessary general information about the unit, contain guidance on and procedures for the operations that are vital to the safety of personnel and the unit.The operating manual for normal operations should include the following general descriptive information()A、a description and particulars of the unitB、a capacity plan showing the capacities and the vertical, longitudinal and transverse centers of gravity of tanks and bulk material stowage spacesC、Fuel oil storage and transfer proceduresD、All of above

考题 Which logical unit number must be configured on an interface using PPP encapsulation?()A、unit 0B、unit 1C、unit 100D、unit 255

考题 用来分离目录名和文件名的字符是()。A、slAsh(/)B、perioD(.)C、DAsh(-)D、Asterisk(*)

考题 Morse跌倒量表(MFS)有静脉输液的评分20分。

考题 Morse跌倒评估量表得分55分,患者()A、跌倒有风险B、跌倒无风险C、得分越高,表示跌倒风险越低D、Morse跌倒评估总分130分

考题 对于过渡动画transition-property以下语法格式应用正确的是()。A、transition-duration:none;B、transition-duration:0.3sC、transition-duration:-1s;D、transition-duration:500ms;

考题 animation过渡动画属性语法正确的是()。A、animationName:important;B、animation-duration:0.3s;C、animation-duration:-1s;D、animation-duration:500ms;

考题 Code Prefetch Unit

考题 Project schedule management is made up of six management processes including: activity definition, activity sequencing()and schedule control by order.A、activity duration estimating, schedule developing, activity resource estimatingB、activity resource estimating, activity duration estimating, schedule developmentC、schedule developing, activity resource estimating, activity duration estimatingD、activity resource estimating, schedule developing, activity duration estimating

考题 Which code causes only a Level 2 adjacency to be formed under the SONET interface so-2/2/2 with Frame Relay encapsulation?()A、so-2/2/2 { unit0 { disable familyiso }}B、isis{ level1 disable; interfaceso-2/2/2.0 { disable } interfaceall;C、so-2/2/2 { unit0 { disablelevel 1; familyiso }}D、isis{ level1 disable; interfaceall; }

考题 单选题When testing a Class A EPIRB you will know the EPIRB is working properly if you hear on 99.5 Mhz FM or any vacant frequency on a nearby AM radio().A a distinctive signalB the Morse Code signal for SOSC a computerized voice announcement of MaydayD your vessel's International Radio Call Sign

考题 单选题You want to perform the database backup when user activity on your system is low, such as between 12:00 a.m. and 2:00 am. Which command terminates with an error if the backup is not complete at the end of the specified duration?()A RMAN BACKUP DURATION 2:00 MINIMIZE LOAD DATABASEB RMAN BACKUP DURATION 2:00 PARTIAL FILESPERSET 1 DATABASEC RMAN BACKUP DURATION 2:00 PARTIAL MINIMIZE TIME DATABASE D RMAN BACKUP AS COPY DURATION 2:00 PARTIAL MINIMIZE LOAD DATABASE

考题 单选题Which signal is detected as originating from a SART?()A The Morse code distress series S-O-S repeated 3 times followed by DE and the vessel's call signB A line of blip code on a radar screen outward from the SART's position along its line of bearingC A line of blip code on a radar screen inward from the SART's position to its own ship along its line of bearingD None of these

考题 单选题For self elevating and column stabilized units, is 100% lifeboat capacity acceptable for the MODU Code?()A No, the MODU Code requires that there should be 100% capacity available when all lifeboats in one location are lost or rendered unusable, or all the lifeboats on any one side, or any one corner of the unit are lost or rendered unusable. Generally, this requirement is met by applying 2 x 100% lifeboat capacitiesB Yes, the lifeboats should be able of carrying the number of personnel onboard the unit., i.e. 1 x 100%C Yes, provided you have additional liferaft capacityD You don’t need lifeboats as long as you have 2 x 100% liferaft capacity

考题 单选题What does a SART signal sound or look like?()A It transmits SOS and the vessel's name and position in slow speed Morse CodeB It will appear on a radar unit's PPI as a line of dots radiating outward with the innermost dot indicating the SART's positionC It will appear on a radar unit's PPI as a line of dots radiating outward with the outermost dot indicating the SART's positionD None of the above

考题 单选题Atoll的uSeR pRofile中主要对以下参数进行设置:()A SeRviCe、teRmiNAl、CAll/houR、duRAtioN、UL/DLvolumeB CAll/houR、duRAtioN、UL/DLvolumeC SeRviCe、teRmiNAlD SeRviCe、teRmiNAl、CAll/houR、duRAtioN

考题 单选题How is a safe water mark,that can be passed close aboard on either side,painted and lighted?()A Black and white stripes with an interrupted quick flashing lightB Black and red stripes with a Morse (A) lightC Black and red stripes with an interrupted quick flashing lightD Red and white stripes with a Morse (A) light

考题 单选题Any person maintaining a listening watch on a bridge to bridge radio-telephone must be able to().A Speak EnglishB Repair the unitC Speak SpanishD Send Morse code

考题 单选题You are scanning the radar screen for a buoy fitted with racon. How should this signal appear on the PPI display?()A Starting with a dash and extending radially outward from the targetB As a broken line from center of PPI to the targetC Starting with a dot and extending radially inward from the targetD Starting with a dash and extending to the right of the target