网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A ship under construction or major repair will acquire permanent magnetism due to()while sitting stationary in the earth’s magnetic field.
A

hammering and jarring

B

vibration and pounding

C

varying magnetic fields

D

stable or permanent magnetism of the ship


参考答案

参考解析
解析: 暂无解析
更多 “单选题A ship under construction or major repair will acquire permanent magnetism due to()while sitting stationary in the earth’s magnetic field.A hammering and jarringB vibration and poundingC varying magnetic fieldsD stable or permanent magnetism of the ship” 相关考题
考题 Although a ship usually has repair in a shipyard, ________ is also necessaryA.the general repair on boardB.the voyage repairC.the annual repairD.the dock repair

考题 Wetakeourskinforgranteduntilitisburned______repair.A)beyondB)forC)withoutD)under

考题 甲板部由大副负责。A.The captain is the head of a ship.B.The master is the head of a ship.C.The deck department is under the command of the chief officer.D.The pilot is the head of a ship.

考题 What is NOT true about overhaul repair?( ) A.Overhaul repair is a major repair.B.Overhaul repair is carried out in a dock.C.Overhaul repair is carried out once a year.D.Overhaul repair is done for the purpose of rating.

考题 When a ship were found its equipment does not correspond substantially with the particulars of the Certificate by a nominated surveyor and corrective actions unable to be taken, thenA.the Certificate would be withdrawnB.the ship owner would be finedC.the shipping company must be notified immediatelyD.the ship must proceed to the nearest appropriate repair yard for a repair without delay

考题 ______ is issued under the provision of International Convention for the Prevention of Pollution from Ships,1973,as modified by the Protocol of 1978 relating thereto.A.INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATEB.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATEC.CARGO SHIP SAFETY EQUIPMENT CERTIFICATED.CARGO SHIP SAFETY RADIOTELEPHONY CERTIFICATE

考题 A ship under construction or major repair will acquire permanent magnetism due to ______ while sitting stationary in the earth's magnetic field.A.hammering and jarringB.vibration and poundingC.varying magnetic fieldsD.stable or permanent magnetism of the ship

考题 After()the bid, major construction began in Beijing.AwinBwiningCwinningDwon

考题 甲板部由大副负责。()A、The captain is the head of a ship.B、The master is the head of a ship.C、The deck department is under the command of the chief officer.D、The pilot is the head of a ship.

考题 The sailors do cleaning and repair work under the supervision of the ().A、chief officerB、captainC、bosunD、second officer

考题 ()(富余水深) is the depth remaining under a ship’s bottom.A、Under-keel heightB、Under-keel clearanceC、Under-keel draftD、Under-keel depth

考题 The sailors do cleaning and repair work ()the bosun.A、under the supervision ofB、with the help ofC、in charge ofD、in the charge of

考题 单选题The construction portfolio may be included as part of the ship().A general plansB operating manualC builders documentationD CCS file

考题 单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in ().A INTERNATIONAL LOADLINE CERTIFICATEB PASSENGER SHIP SAFETY CERTIFICATEC CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED GENERAL DECLARATION

考题 单选题A mortgagee does not acquire a right to the freight()he has taken actual or constructive possession of the ship.A whereB ifC andD unless

考题 单选题()refers to the repair the ship every year.A Voyage repairB Annual repairC Periodical repairD Survey check

考题 单选题In ship construction,bulkheads in the quarters are generally().A structuralB watertightC non-structuralD continuous

考题 单选题When the ship security alert system is activated, it shall not()A initiate a ship-to-shore security alertB transmit a ship-to-shore security alertC initiate an alert identifying the ship, its locationD raise a security alarm on-board the ship indicating that the ship is under threat

考题 单选题When ship at anchor she shall be deemed to be().A Not under-wayB Not under commandC Restricted in her ability to maneuverD A non-displacement ship

考题 单选题After()the bid, major construction began in Beijing.A winB winingC winningD won

考题 单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().A INTERNATIONAL LOAD LINE CERTIFICATEB PASSENGER SHIP SAFETY CERTIFICATEC CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED GENERAL DECLARATION

考题 单选题()is issued under the provision of International Convention for the Prevention of Pollution from Ships,1973,as modified by the Protocol of 1978 relating thereto.A INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATEB CARGO SHIP SAFETY CONSTRUCTION CERTIFICATEC CARGO SHIP SAFETY EQUIPMENT CERTIFICATED CARGO SHIP SAFETY RADIOTELEPHONY CERTIFICATE

考题 单选题By this time tomorrow, the ship ()its repair work in the engine room.A will doB has doneC had doneD will have done

考题 单选题(), where minor repairs are carried out with a ship service, often during a stay in portThis may be remote from a ship repair site.A voyage repairsB routine dockingC damage repairsD conversion

考题 单选题A simplified construction plan may be included in the ship construction portfolio provided it adequately defines the().A areas where special materials are usedB hazardous areasC location of emergency repair equipmentD type and strength of materials used

考题 单选题The purpose of sheer in ship construction is to().A allow the ship to ride waves with drier decksB eliminate the need for butt strapsC eliminate the need for margin platesD give greater strength at the deck edge

考题 单选题Look out! Don't get too close to the house that roof is under repair.A Look outB getC thatD under repair