网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Each part of the fire-main system located on an exposed deck must be().
A

protected against freezing

B

locked to prevent theft

C

numbered sequentially

D

pressurized at all times


参考答案

参考解析
解析: 暂无解析
更多 “单选题Each part of the fire-main system located on an exposed deck must be().A protected against freezingB locked to prevent theftC numbered sequentiallyD pressurized at all times” 相关考题
考题 The female reproductive system is located in the () A、chestB、pelvisC、stomachD、abdomen

考题 What would NOT require that a detailed report of the release of hazardous cargo be made to the Department of Transportation?A.The valve on an empty portable tank that contained acetone is accidently opened and some of the residue escapes to the open seaB.A carboy of nitric acid is broken on deck while loading and is flushed overboard with no injury or damageC.Part of your deck cargo of five gallon cans of paint is damaged and leaking so you jettison them to eliminate the fire hazardD.Heavy weather causes damage to packages of a hazardous liquid that is subsequently pumped out at sea through the bilge pumping system.

考题 According to the regulations,normally,manholes in LFG tanks are located ______.A.In the ends of each tankB.In the expansion trunk of each tankC.Above the weather deckD.There are no requirements in the regulation

考题 The oil transfer procedures aboard a tanker transferring oil are NOT required to contain ______.A.The name of each person designated as the person in charge of transferB.A line diagram of the vessel's oil transfer pipingC.Special procedures for topping off tanksD.A description of the deck discharge containment system

考题 A fire hose with a nozzle attached must be connected to each hydrant except when exposed to heavy weather or when the ______.A.Fire hose might be damaged by cargo operationsB.Vessel is in portC.Fire-main system is not chargedD.Fire pumps are used for purposes other than supplying water to the fire main

考题 Before starting to hoist provisions, which should be checked?______.A.Hoist rope is not kinkedB.Multiple part lines are not twisted around each otherC.The hook is centrally located over the loadD.All of the above

考题 What is the primary use of the IBM Configuration  Options Guide (COG)? ()A、IBM System x ServicePac part number look upB、Operating system and part number look upC、General server information and part number look upD、Software compatibility charts

考题 艏楼甲板位于船艏部。()A、Forecastle deck is located at the ship’s stern.B、Poop deck is located at the ship’s bow.C、Forecastle deck at located in the ship’s bow.D、Poop deck is located at the ship’s stern.

考题 The company has two thousand servers located around the globe. Which of the following is the BEST method of patch management and deployment?()A、Set all servers to automatically download patches from the manufacturer’s website.B、Install an internal patch management system and deploy from the system.C、Install the patches on each server from a deployment disk.D、RDP into each server, manually download and install the patches.

考题 A system administrator for a business recovery service center needs to test disaster recovery strategies for their clients running Linux. Each client has a different system configuration. Each time a client comes in, the system configuration of the managed system must change. What is the best way to handle this using LPAR?()A、Create a system profile. Reconfigure the managed system by activating and deactivating the system profiles. B、Create one partition profile for each client. Reconfigure the managed system by activating the partition profiles for that client. C、Dynamically move processors and memory as needed into each logical partition. Reconfigure the managed system by activating and deactivating partition profiles. D、Dynamically move processors and memory into each logical partition on the server if additional resources are needed. Reconfigure the managed system by activating and deactivating the system profiles.

考题 Which of the following is true about rmss?()A、 rmss is a part of performance toolbox and stands for Reduced Memory System SimulatorB、 rmss is a part of perfpmr and stands for Real Memory System SimulatorC、 rmss is part of the standard bos.perf filesets and stands for Redundant Memory System SimulatorD、 rmss is part of  WLM and stands for Real Memory System Simulator

考题 单选题Forecastle deck is located in the ship’s().A bow stemB sternC portsideD starboard side

考题 单选题Which of the following is true about rmss?()A  rmss is a part of performance toolbox and stands for Reduced Memory System SimulatorB  rmss is a part of perfpmr and stands for Real Memory System SimulatorC  rmss is part of the standard bos.perf filesets and stands for Redundant Memory System SimulatorD  rmss is part of  WLM and stands for Real Memory System Simulator

考题 单选题A cutoff valve in the fire-main system of a ship may be closed to protect the portion of the system on an exposed deck from().A damage from crane operationsB being used for wash down purposesC accidental diversion of flow to wrong locationD freezing

考题 单选题In the combustion chamber, the part whose surface is exposed to the highest temperature is the ().A cylinder linerB cylinder coverC pistonD exhaust valve

考题 单选题救生艇置放在于艇甲板。()A Lifeboat is located on the boat deck.B Lifeboat is located on the main deck.C Life craft is located on the boat deck.D Lifeboat is located on the lower deck.

考题 单选题The foremost part of the upper deck is called the().A forecastleB tweendeckC hatchesD peak tanks

考题 单选题According to the regulations,normally,manholes in LFG tanks are located().A in the ends of each tankB in the expansion trunk of each tankC above the weather deckD there are no requirements in the regulation

考题 单选题Two navigational hazards are located near to each other,but each is marked by an individual cardinal buoyage system. The buoys of one cardinal system may be identified from the other system by().A the differing light colorsB one system having odd numbers while the other system has even numbersC one system using horizontal bands while the other system uses vertical stripesD the difference in the periods of the light

考题 单选题Before starting to hoist provisions,which should be checked?()A Hoist rope is not kinkedB Multiple part lines are not twisted around each otherC The hook is centrally located over the loadD All of the above

考题 单选题A fire hose with a nozzle attached must be connected to each hydrant except when exposed to heavy weather or when the().A fire hose might be damaged by cargo operationsB vessel is in portC fire-main system is not chargedD fire pumps are used for purposes other than supplying water to the fire main

考题 单选题Forecastle deck is located( 位于) at the ship’s ().A bowB sternC midshipD abeam

考题 单选题If an air compressor is used to supply compressed air to outlets throughout the engine room and on deck of a vessel, the system is known as the ().A combustion control air systemB supply air systemC ships service air systemD low pressure deck air system

考题 单选题The scavenging air ports are located at () that they are just exposed by the upper edge of the piston when the piston is in the bottom dead center position.A so a heightB such a heightC so highD such high

考题 名词解释题外露导电部分(exposed conductive part)

考题 单选题The height of coamings of hatchway above the exposed freeboard deck shall be at least()A 900mmB 600mmC 760mmD 450mm

考题 单选题A System z customer is planning to deploy the IBM System Storage DS6800 in each of threesmall data centers located around a large city. A backup data center with an IBM System StorageDS8100 will serve as the disaster recovery facility. Which advanced function can the customerimplement to meet disaster recovery requirements?()A Global Mirror for zSeriesB Metro MirrorC Global CopyD Metro/Global Mirror