网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
While explaining to a customer the fault tolerant benefits of x445 they ask what happens if they implement memory mirroring and a DIMM fails in the SMP expansion module.  Which of the following is the most appropriate response?()
A

The DIMM is taken off line, and fault tolerance is available on the other DIMMs only.

B

The memory bank is taken offline and rebuilt with the online hot spare and then brought back on line.

C

The memory bank containing the failed DIMM is taken off line, and the system is no longer fault tolerant until replaced.

D

The DIMM is taken offline, and the online hot spare is initiated and the system remains fault tolerant.


参考答案

参考解析
解析: 暂无解析
更多 “单选题While explaining to a customer the fault tolerant benefits of x445 they ask what happens if they implement memory mirroring and a DIMM fails in the SMP expansion module.  Which of the following is the most appropriate response?()A The DIMM is taken off line, and fault tolerance is available on the other DIMMs only.B The memory bank is taken offline and rebuilt with the online hot spare and then brought back on line.C The memory bank containing the failed DIMM is taken off line, and the system is no longer fault tolerant until replaced.D The DIMM is taken offline, and the online hot spare is initiated and the system remains fault tolerant.” 相关考题
考题 Which of the following replication methods is MOST fault tolerant?() A. Hot siteB. Active/passive clustering at the same siteC. Disk-to-disk replication in the same serverD. Warm site

考题 A server has six drives of equal size attached to a RAID controller. Which of the following fault tolerant RAID levels would allow the maximum amount of data to be stored?() A. RAID 1 +0B. RAID 5C. RAID 0D. RAID 1

考题 While the accounting department is closed, all billing questions will be __________by the customer service department.A.expired B.attended C.replied D.handled

考题 PLC IO Rack Fault翻译为: PLC I/O支架故障。

考题 An installed manufacturing customer has a mission-critical application that requires a rack mount server that will protect them against downtime in the event memory DIMM failure occurs. They also need load balancing, fault tolerant NICS and redundant power supplies and fans. Which of the following servers meets these requirements.()A、x3200 M3B、x3250 M3C、x3200 M3 and x3250 M3D、x3650 M3

考题 While explaining to a customer the fault tolerant benefits of x445 they ask what happens if they implement memory mirroring and a DIMM fails in the SMP expansion module.  Which of the following is the most appropriate response?()A、The DIMM is taken off line, and fault tolerance is available on the other DIMMs only.B、The memory bank is taken offline and rebuilt with the online hot spare and then brought back on line.C、The memory bank containing the failed DIMM is taken off line, and the system is no longer fault tolerant until replaced.D、The DIMM is taken offline, and the online hot spare is initiated and the system remains fault tolerant.

考题 What are two benefits for prospects, derived from the Cisco SBR Methodology?()A、Creates a Link between Business and IT PlanningB、Increase Customer RoyaltyC、Lowers TCOD、Increase Profitability

考题 Which two options are benefits of the Cisco Technical Assistance Center?()A、Increase the performance of the current featuresB、Possesses broad expertise in Cisco technologiesC、Enhances network and/or application availability, reliability and stabilityD、Provides rapid fault isolation in a complex environment, leading to quick resolution

考题 A server has six drives of equal size attached to a RAID controller. Which of the following fault tolerant RAID levels would allow the maximum amount of data to be stored? ()A、 RAID 1+0B、 RAID 5C、 RAID 0D、 RAID 1

考题 Which of the following replication methods is MOST fault tolerant?()A、 Hot siteB、 Active/passive clustering at the same siteC、 Disk-to-disk replication in the same serverD、 Warm site

考题 A customer has a question about the repairs needed for their desktop computer. While asking their question to a technician, the technician receives a personal phone call on their cell phone. Which of the following should the technician do NEXT?()A、Ask the customer to wait and answer the phone call.B、Talk on the phone while listening to the customer.C、Hand the phone to a coworker to answer the call.D、Silence the phone and then listen to the customer.

考题 A distribution customer requires a fault-tolerant disk subsystem for their x3650 M2 server. They purchased and attached two EXP3000 External Expansion Enclosures to a ServerRAID MR10M RAID controller. The customer requires the highest performance possible, regardless of cost for the EXP-based drives. Which RAID level meets these requirements?()A、RAID-1B、RAID-5C、RAID-10D、RAID-50

考题 An application vendor wants to choose a fault tolerant platform for their new application.  The application benefits from multiple processors and has been tested on Red Hat Advanced Server 3.  To determine the memory requirements for the application, which of the following is the best procedure?()A、The application should be tested and baselines should be measured with simulated user loads.B、The application should be tested with the minimum amount of memory then increase the memory in increments until an acceptable response is achieved.C、The application should be tested with differing amounts of memory and the fastest response time is reached it should be used as the acceptable configuration.D、The application should be tested with the maximum amount of memory then decrease the memory in increments until an acceptable price/performance ratio is reached.

考题 A retailer is considering deploying an online transaction application on xSeries to serve their buyers.  The server will need no more than four processors and will run on Red Hat Linux AS.  The storage requirement is for 5TB of usable storage, and the maximum memory requirement is 4GB of RAM.  Which solution will provide the best price and performance while maintaining fault tolerance?()A、An x260 with dual fault tolerant ServeRAID adapters and 12 internal drivesB、An x366 with dual fault tolerant NICs with a single Fibre HBA directly attached to a DS4300 with three EXP710s fully populated with 146GB Fibre DrivesC、An x366 with dual fault tolerant NICs and two Fibre HBAs directly attached to a DS4300 Turbo with three EXP700s fully populated with 146GB drivesD、An x445 server with dual fault tolerant HBAs and a DS4500 with two additional EXP710s fully populated with 146GB Drives

考题 A customer has received a quotation from Dell for Intel-based 1U servers.  What is the first step in submitting your quotation? ()A、Try to sell IBM X-Architecture technology to the customer and explain its benefits.B、Take the customer to the Dell Web site for determining a similar server configuration.C、Submit a special bid to receive additional discount on 1U servers.D、Design a comparable solution while highlighting IBM advantages.

考题 单选题A customer wants to purchase a Windows 2003 DataCenter Edition system to run an application.  The application benefits the most by caching a vast amount of data in RAM so the user does not have to wait for disk I/O while editing.  Processing is second in importance.  If cost is not an issue, what machine will have the best performance?()A Use an x360 running 4 MP processors with 16GB of RAMB Use an x360 running 4 DP processors with 16GB of RAMC Use an x445 running 2 DP processors with 64GB of RAMD Use an x445 running 4 DP processors with 64GB of RAM

考题 多选题Which two benefits of network integration would be critical to a large metropolitan hospital?()Acomputerization of order entry for physiciansBcompliance with HIPPA requirementsCimproved bandwidthDgreater fault tolerance

考题 问答题Practice 1  ● Recently, your company has received a letter complaint concerning the delay of an order. As the manager of the Department of Customer Service, you are to handle this.  ● Write the letter to the customer:  ● explaining the reason for the delay,  ● apologizing for the delay,  ● offering some measures to make up for the delay.

考题 单选题A server has six drives of equal size attached to a RAID controller. Which of the following fault tolerant RAID levels would allow the maximum amount of data to be stored? ()A  RAID 1+0B  RAID 5C  RAID 0D  RAID 1

考题 单选题A distribution customer requires a fault-tolerant disk subsystem for their x3650 M2 server. They purchased and attached two EXP3000 External Expansion Enclosures to a ServerRAID MR10M RAID controller. The customer requires the highest performance possible, regardless of cost for the EXP-based drives. Which RAID level meets these requirements?()A RAID-1B RAID-5C RAID-10D RAID-50

考题 单选题Defining employee “customer” segments meansA offering some employees more and the other less.B relating the customers to the employees’ benefits.C varying benefits according to different employees.D dividing employees into different groups.

考题 单选题Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined.  The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits. How should the pSeries technical specialist best address this?()A Design the solution and present it confidently so the customer does not question it.B Design the solution and ensure the customer understands the unknowns with the new technology.C Explain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.D Explain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.

考题 单选题Which of the following replication methods is MOST fault tolerant?()A  Hot siteB  Active/passive clustering at the same siteC  Disk-to-disk replication in the same serverD  Warm site

考题 单选题A retailer is considering deploying an online transaction application on xSeries to serve their buyers.  The server will need no more than four processors and will run on Red Hat Linux AS.  The storage requirement is for 5TB of usable storage, and the maximum memory requirement is 4GB of RAM.  Which solution will provide the best price and performance while maintaining fault tolerance?()A An x260 with dual fault tolerant ServeRAID adapters and 12 internal drivesB An x366 with dual fault tolerant NICs with a single Fibre HBA directly attached to a DS4300 with three EXP710s fully populated with 146GB Fibre DrivesC An x366 with dual fault tolerant NICs and two Fibre HBAs directly attached to a DS4300 Turbo with three EXP700s fully populated with 146GB drivesD An x445 server with dual fault tolerant HBAs and a DS4500 with two additional EXP710s fully populated with 146GB Drives

考题 单选题Which implement phase service component consists of explaining the benefits and limitations of purchased support options to a customer and ensuring that the customer understands operational processes and responsibilities? Select exactly 1 answer(s) from the following:()。A Staging and System MigrationB Post Implementation Support Handoff MeetingC Detailed Design DevelopmentD Staff Training

考题 单选题A customer is building a database server, and the server does sequential write most of the time.  They are planning to use an IBM x445 and a ServeRAID-6M adapter.  Which of the following fault tolerant RAID levels will perform best for sequential write?()A RAID-5 with cache write backB RAID-1E with cache write backC RAID-10 with cache write thruD RAID-50 with cache write thru

考题 单选题An installed manufacturing customer has a mission-critical application that requires a rack mount server that will protect them against downtime in the event memory DIMM failure occurs. They also need load balancing, fault tolerant NICS and redundant power supplies and fans. Which of the following servers meets these requirements.()A x3200 M3B x3250 M3C x3200 M3 and x3250 M3D x3650 M3