网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

A customer with two x445 servers wants to have two NetXtreme Dual Port Gigabit Ethernet adapters installed in each server.  What is the minimally supported configuration that will allow maximum throughput?()

  • A、Install the two cards in slots 5 and 6 in the x445.
  • B、Install the two cards in slots 3 and 5 in the x445 make sure slots 4 and 6 are not occupied.
  • C、Install an RXE-100 on each x445 and install one card in the x445 and one card in an RXE-100 on each system.
  • D、Connect an RXE-100 between the two x445s and install one card in each x445 and one card in each side of the RXE-100.

参考答案

更多 “A customer with two x445 servers wants to have two NetXtreme Dual Port Gigabit Ethernet adapters installed in each server.  What is the minimally supported configuration that will allow maximum throughput?()A、Install the two cards in slots 5 and 6 in the x445.B、Install the two cards in slots 3 and 5 in the x445 make sure slots 4 and 6 are not occupied.C、Install an RXE-100 on each x445 and install one card in the x445 and one card in an RXE-100 on each system.D、Connect an RXE-100 between the two x445s and install one card in each x445 and one card in each side of the RXE-100.” 相关考题
考题 A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A. operator trainingB. cache size of the two clustersC. fibre bandwidth capability between the sitesD. number of stacked tape drives attached to each cluster

考题 A customer plans to install ten Microsoft Windows servers, three Linux servers, and five AIX servers, with two Fibre Channel host bus adapters each as part of an IBM DS8700 implementation.What multipathing driver is required to build a redundant solution?()A.RDACB.MPIOC.SSPCD.SDDPCM

考题 A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration:  (1)two Brocade 20-Port SAN Switch Modules  (2)two Nortel Networks 1/10 GB Uplink ESM  (3)a redundant AMM  What is the minimum number of power supplies needed for this configuration to have full redundancy?()A、4B、3C、2D、8

考题 A customer uses an IBM xSeries x366 for their network server.They experienced downtime when the NIC failed earlier this year.Their Novell 6.5 server needs to be accessible all the time at the highest speed possible.Slots are available where network adapters can still be added.  High availability is the primary requirement, but increased network bandwidth on the server is also required. Which of the following is the most cost-effective solution to satisfy all of the customer’s requirements?()A、Upgrade the network switches to 10Gb speed.B、Install a dual port gigabit Ethernet adapter and configure adapter load balancing teaming with the onboard adapters.C、Install one extra adapter to team with the internal adapter and configure adapter failover.D、Install two additional NICs and configure adapter load balancing teaming with the onboard adapters.

考题 A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications.  Each partition requires two of the following:  OS boot drives, fiber adapters, and gigabit Ethernet adapters.  The customer has an HMC with an available serial port.  In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()A、One 7311-D20 drawerB、Two 7311-D20 drawersC、Two 7311-D10 drawersD、One 7311-D10 drawers

考题 Company.com wants to put two Micro-Partitions on a p5-570 and attach to a SAN. What is the best LPAR configuration to maximize SAN availability using four Host Bus Adapters (HBAs)?()A、Two HBAs assigned to each redundant VIOS which provides VSCSI access to LUNsB、Two HBAs assigned to each LPAR with each LPAR owning HBAs on the same PCI bussesC、Two HBAs assigned to each LPAR with each LPAR owning HBAs on separate PCI bussesD、One HBA assigned to each LPAR and two HBAs assigned to a VIOS providing VSCSI access to LUNs

考题 Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()A、One single port Ethernet adapterB、Four dual port Ethernet adaptersC、Two single port Ethernet adaptersD、Eight single port Ethernet adapters

考题 Companycom is implementing a pair of Virtual IO Servers to service four LPARs. If each operating system image requires 15GB of disk space, what is the minimum amount of SCSI resource necessary?()A、Two SCSI paths and two 73GB SCSI disksB、Two SCSI paths and two 36GB SCSI disksC、Four SCSI paths and four 73GB SCSI disksD、Two dual port SCSI RAID adapters with two 73GB SCSI disks

考题 A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()A、Two switch ports will be needed on a switch,two Ethernet cables will be needed for theserver each connecting to two different Ethernet cards,and one IP address will be neededB、Two switch ports will be needed on two different switches two Ethernet cables will beneeded for the server each connecting to two different Ethernet cards,and one IP address will be neededC、Two switch ports will be needed on two different switches,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,two different IP addresses will be neededD、One switch port will be needed on one switch,a splitter will be needed to split the connection,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,and two different IP addresses will be needed

考题 A customer plans to install ten Microsoft Windows servers, three Linux servers, and five AIX servers, with two Fibre Channel host bus adapters each as part of an IBM DS8700 implementation. What multipathing driver is required to build a redundant solution?()A、RDACB、MPIOC、SSPCD、SDDPCM

考题 A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A、operator trainingB、cache size of the two clustersC、fibre bandwidth capability between the sitesD、number of stacked tape drives attached to each cluster

考题 A customer wants to increase the performance of an existing server. They are running a very network intensive application and feel that increasing the bandwidth to the network will fix their problem.  They are running two 24-port autosensing 10/100 hubs, tied together with a standard Ethernet crossover cable in port 24.  The server is running IPX. After adding a second network card and plugging one card into each hub, they have not seen any performance improvement.  Which two are likely reasons why implementing network adapter teaming has not improved performance?()A、 Adapter teaming is designed to work with switches.B、 Adapter teaming only functions with gigabit network cards.C、 Adapter teaming only provides fault tolerance, not additional bandwidth.D、 Adapter teaming only works with IPX when using switches and network cards with special features that support teaming.

考题 A company wants to buy memory efficiently on their p5 590 to allow for the best performance. What is the best practice for adding memory for performance?()A、Install more cards of smaller capacity and same size across MCMs. Use DDR2(dual data rate) memory if using HPC (High Performance Computing). B、Install fewer cards of larger capacity of the same size across MCMs. Servers with one processor book must have a minimum of four memory cards installed. C、Intermix DDR1 and DDR2 memory so that partitions requiring the higher performance can take advantage of them. Half of the available memory slots in the system should contain memory. D、Use fewer higher density memory cards so that a few memory slots are left open for future growth. Each processor book provides sixteen memory card slots. The p5 590 supports a maximum of 64 memory cards.

考题 A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()A、Two dual-port PCIe adaptersB、A four-port PCIe Ethernet adapterC、Four separate PCIe Ethernet adaptersD、Two embedded Integrated Virtual Ethernet adapters (IVE)

考题 A customer has just purchased an 8-core POWER 570 which has two dual port 1 Gbps  Integrated Virtual Ethernet (IVE) adapters. The customer wants to implement queue pairs (QPs) to take advantage of parallel processing of network traffic to its client logical partitions. Assuming that the system is to utilize the IVEs in both CECs,  which configuration will allow a logical partition to utilize the entire eight cores for network traffic processing?()A、 Set Multiple Core Scaling (MCS) value of the port group to 8 and set multiple core parameter of the client Ethernet adapters to yes.B、 Set Multiple Core Scaling (MCS) value of the port group to 4 and set multiple core parameter of the client Ethernet adapters to yes.C、 Set Multiple Core Scaling (MCS) value of one of the physical port groups to 4 and set multiple core parameter of the client Ethernet adapters to yes.D、 Set Multiple Core Scaling (MCS) value of one of the physical port groups to 8 and set the multiple core parameter of the client Ethernet adapters to yes.

考题 A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()A、Dual power supplies.B、Twice the amount of disk.C、Two dual-port LHEA adapters.D、Two dual-port fibre channel adapters.

考题 A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()A、Two switch ports will be needed on a switch, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.B、Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.C、Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, two different IP addresses will be needed.D、One switch port will be needed on one switch, a splitter will be needed to split the connection, two ethernet cables will be needed for the server each connecting to two different Ethernet cards, and two different IP addresses will be needed.

考题 Company.com has two POWER5 servers. They want the two servers’ virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?()A、Configure a Shared Ethernet Adapter on the Virtual I/O Server.B、Use the same virtual LAN ID on each LPAR.C、Set up IP routing through an LPAR on each system.D、Set up an IP firewall through an LPAR on each system.

考题 A manufacturing customer has a requirement to add 12 additional dual-attached servers to theirexisting two Brocade 16 port SAN switches that have no more ports available. Which of thefollowing should be recommended to accommodate the current capacity requirements, allow forfuture growth and provide 8 and 4 Gb support?()A、two SAN16B B、two SAN80B-4 C、two SAN24B-4 D、two SAN04B-R

考题 A customer is purchasing a 12-way p5-570 to run light development workloads on eight AIX 5.3 partitions with two network adapters each.  When the current network configuration was reviewed, it was discovered that they only have four Ethernet ports available on their network switch.  Which of the following solutions would prevent them from having to buy another network switch or hub?()A、Add two HMCs with two Ethernet adapters each and run EtherChannel for the original eight partitions.B、Add two HMCs with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.C、Add two hosting partitions with two Ethernet adapters each and run EtherChannel for the original eight partitions.D、Add two hosting partitions with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.

考题 You are designing a DHCP strategy to meet the business and technical requirements.  What should you do?()A、 Install one DHCP server in each branch office and one DHCP server in Los Angeles.B、 Install one DHCP server in each branch office and two DHCP servers in Los Angeles.C、 Install two DHCP servers in each branch office and one DHCP server in Los Angeles.D、 Install two DHCP servers in each branch office and two DHCP servers in Los Angeles.

考题 Your company purchases 15 new 64-bit servers as follows: èFive of the servers have a single processor.    èFive of the servers have a single dual core processor. èFive of the servers have two quad core processors.   You plan to deploy Windows Server 2008 R2 on the new servers by using Windows Deployment Services (WDS).  You need to recommend a WDS install image strategy that meets the following requirements: Minimizes the number of install images   Supports the deployment of Windows Server 2008 R2 What should you recommend?()A、one install image file that contains three install imagesB、one install image file that contains a single install imageC、two install image files that each contain a single install imageD、three install image files that each contain a single install image

考题 单选题A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()A Two dual-port PCIe adaptersB A four-port PCIe Ethernet adapterC Four separate PCIe Ethernet adaptersD Two embedded Integrated Virtual Ethernet adapters (IVE)

考题 单选题A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()A Two switch ports will be needed on a switch,two Ethernet cables will be needed for theserver each connecting to two different Ethernet cards,and one IP address will be neededB Two switch ports will be needed on two different switches two Ethernet cables will beneeded for the server each connecting to two different Ethernet cards,and one IP address will be neededC Two switch ports will be needed on two different switches,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,two different IP addresses will be neededD One switch port will be needed on one switch,a splitter will be needed to split the connection,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,and two different IP addresses will be needed

考题 单选题Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()A One single port Ethernet adapterB Four dual port Ethernet adaptersC Two single port Ethernet adaptersD Eight single port Ethernet adapters

考题 单选题A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()A Two switch ports will be needed on a switch, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.B Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.C Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, two different IP addresses will be needed.D One switch port will be needed on one switch, a splitter will be needed to split the connection, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and two different IP addresses will be needed.

考题 单选题A customer with two x445 servers wants to have two NetXtreme Dual Port Gigabit Ethernet adapters installed in each server.  What is the minimally supported configuration that will allow maximum throughput?()A Install the two cards in slots 5 and 6 in the x445.B Install the two cards in slots 3 and 5 in the x445 make sure slots 4 and 6 are not occupied.C Install an RXE-100 on each x445 and install one card in the x445 and one card in an RXE-100 on each system.D Connect an RXE-100 between the two x445s and install one card in each x445 and one card in each side of the RXE-100.