An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()
A

LPAR Planning Tool.

B

System Planning Tool.

C

LPAR Validation Tool.

D

System Validation Tool.


参考答案

参考解析
解析: 暂无解析
更多 “单选题An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A LPAR Planning Tool.B System Planning Tool.C LPAR Validation Tool.D System Validation Tool.” 相关考题
考题 An administrator wants to deploy a complex LPARenvironment on a 595.What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A.LPAR Planning Tool.B.System Planning Tool.C.LPAR Validation Tool.D.System Validation Tool.

考题 You are planning to deploy Windows 7.   You have a custom line-of-business application that is not compatible with Windows 7.   You need to design a solution that allows the application to run.   What should you do?()A、Use the Setup Analysis Tool.B、Use the Compatibility Administrator.C、Use the Update Compatibility Evaluator.D、Use the Windows Compatibility Evaluator.

考题 When planning for a logically partitioned system,which of the following should be used as part of a review to ensure that each partition has the required resources? ()A、Use the Workload Estimator capacity planning tool.B、Use prtconf output from legacy systems.C、Use the LPAR Validation Tool.D、Use Performance Management Services.

考题 An administrator has implemented the following LPARs on a Power 570 with 32 GB memory with 512 MB remaining for allocation: LPAR 1 memory : min = 10 GB des = 15 GB max = 24 GB  LPAR 2memory : min = 10 GB des = 15 GB max = 24 GB The administrator receives a request to add 2 GB to LPAR 1. The only way to do this is by moving memory from LPAR 2 to LPAR 1. The administrator attempts to move the memory, but the operation fails. The administrator can  however allocate 512 MB that is free to LPAR 1 on the 570.  What is the most likely cause of this failure when dynamically moving memory?()A、 Maxperm% is set too low on LPAR 2B、 Insufficient paging space on LPAR 1C、 Service IBM.DRM is unavailable on LPAR 1D、 Insufficient pinnable memory frames available on LPAR 2

考题 Companycom has a p5 590 that has their production LPAR, their Tivoli Storage Manager (TSM) LPAR, and several other LPARs. What method would provide connectivity between the production LPAR, and the TSM LPAR, but be isolated from the other LPARs in the system without utilizing a Virtual IO Server or physical adapter resources?()A、Use shared memory and semaphores to transfer the data to the TSM LPARB、Provide gigabit Ethernet adapters in each LPAR and run a crossover cableC、Create a Virtual Ethernet between the production server and the TSM LPARsD、Create a Virtual Ethernet between the TSM server LPAR and the non-production LPARs

考题 Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A、Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB、Use DLPAR to move resources from the test LPAR to training when training is activeC、Install Partition Load Manager to share resources between the test and training environmentsD、Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs

考题 A System p customer is planning to implement virtualization and is concerned about how to respond  to an increased workload and what limitations there are for very small workloads.  Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()A、Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.B、Smallest partition 10% of a processor, as small 1% of a processor may be transferred.C、Smallest partition one processor, as small 1% of a processor may be transferred.D、Smallest partition one core, as small 10% of a processor may be transferred.

考题 An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A、LPAR Planning Tool.B、System Planning Tool.C、LPAR Validation Tool.D、System Validation Tool.

考题 A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()A、e-ConfigB、System Planning Tool (SPT)C、IBM Workload Estimator (WLE)D、IBM Performance Monitor (PM)

考题 An electrician needs to know what type of receptacle is required. What is the most up-to-date resource to identify the plug type for the feature code ordered?()A、InfocenterB、ITSO RedbooksC、Facts and FeaturesD、System Planning Tool

考题 An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A、LPAR Planning Tool.B、System Planning Tool.C、LPAR Validation Tool.D、System Validation Tool.

考题 What type of configuration can provide the best availability in a Virtual IO Server environment?()A、Provide multiple paths to all resources through 2 or more Virtual IO ServersB、Mirror all disk resources on the Virtual IO Server to present to the client LPARC、Mirror all disk resources on the client LPAR to the shared SCSI on the Virtual IO ServerD、Trunk multiple Ethernet adapters on the Virtual IO Server to a single Shared Ethernet Adapter (SEA)

考题 What current IBM resource can be used for simple-to-complex configurations and can be exported in different formats for the pricing of System x, BladeCenter and System x storage products?()A、System x Sales Configuration Aid (xSCA)B、Standalone Solutions Configuration Tool (SSCT) C、Configuration  Options Guide - (COG)D、ServerProven

考题 During the pre-installation planning of a customer’s recently purchased IBM System Storage DS8700 the port configuration, cabling, and disk layout were discussed.  What other topic should be discussed in this solution review()A、LPAR capacity planningB、logical volume configurationC、data migration processD、audit hosts for HBA worldwide port names

考题 Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated. Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()A、Dynamic LPARB、Workload ManagerC、Partition Load ManagerD、Shared Processor Pools

考题 System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems. What is the most probable cause of this problem?()A、The LPAR Configuration backup is corruptB、The LPAR Configuration has been altered using DLPARC、The LPAR Configuration backup was performed on a different HMCD、The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed

考题 单选题When planning for a logically partitioned system,which of the following should be used as part of a review to ensure that each partition has the required resources? ()A Use the Workload Estimator capacity planning tool.B Use prtconf output from legacy systems.C Use the LPAR Validation Tool.D Use Performance Management Services.

考题 单选题A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()A e-ConfigB System Planning Tool (SPT)C IBM Workload Estimator (WLE)D IBM Performance Monitor (PM)

考题 单选题An administrator has implemented the following LPARs on a Power 570 with 32 GB memory with 512 MB remaining for allocation: LPAR 1 memory : min = 10 GB des = 15 GB max = 24 GB  LPAR 2memory : min = 10 GB des = 15 GB max = 24 GB The administrator receives a request to add 2 GB to LPAR 1. The only way to do this is by moving memory from LPAR 2 to LPAR 1. The administrator attempts to move the memory, but the operation fails. The administrator can  however allocate 512 MB that is free to LPAR 1 on the 570.  What is the most likely cause of this failure when dynamically moving memory?()A  Maxperm% is set too low on LPAR 2B  Insufficient paging space on LPAR 1C  Service IBM.DRM is unavailable on LPAR 1D  Insufficient pinnable memory frames available on LPAR 2

考题 单选题What type of configuration can provide the best availability in a Virtual IO Server environment?()A Provide multiple paths to all resources through 2 or more Virtual IO ServersB Mirror all disk resources on the Virtual IO Server to present to the client LPARC Mirror all disk resources on the client LPAR to the shared SCSI on the Virtual IO ServerD Trunk multiple Ethernet adapters on the Virtual IO Server to a single Shared Ethernet Adapter (SEA)

考题 单选题System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems. What is the most probable cause of this problem?()A The LPAR Configuration backup is corruptB The LPAR Configuration has been altered using DLPARC The LPAR Configuration backup was performed on a different HMCD The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed

考题 单选题An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A LPAR Planning Tool.B System Planning Tool.C LPAR Validation Tool.D System Validation Tool.

考题 单选题Companycom has a p5 590 that has their production LPAR, their Tivoli Storage Manager (TSM) LPAR, and several other LPARs. What method would provide connectivity between the production LPAR, and the TSM LPAR, but be isolated from the other LPARs in the system without utilizing a Virtual IO Server or physical adapter resources?()A Use shared memory and semaphores to transfer the data to the TSM LPARB Provide gigabit Ethernet adapters in each LPAR and run a crossover cableC Create a Virtual Ethernet between the production server and the TSM LPARsD Create a Virtual Ethernet between the TSM server LPAR and the non-production LPARs

考题 单选题A resource was dynamically assigned to an LPAR. The customer wants to make the assignment permanent.  What does the technical specialist need to do to reconfigure the LPARs to make the assignment permanent?()A Reboot the source LPAR.B Remove the resource from the source LPAR.C Rediscover the managed system from the HMC.D Add the resource to the profile of the LPAR.

考题 单选题A System p customer is planning to implement virtualization and is concerned about how to respond  to an increased workload and what limitations there are for very small workloads.  Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()A Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.B Smallest partition 10% of a processor, as small 1% of a processor may be transferred.C Smallest partition one processor, as small 1% of a processor may be transferred.D Smallest partition one core, as small 10% of a processor may be transferred.

考题 单选题Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated. Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()A Dynamic LPARB Workload ManagerC Partition Load ManagerD Shared Processor Pools

考题 单选题Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB Use DLPAR to move resources from the test LPAR to training when training is activeC Install Partition Load Manager to share resources between the test and training environmentsD Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs