网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A system administrator installed a new switch using a script to configure it. IP connectivity was tested using pings to SwitchB. Later attempts to access NewSwitch using Telnet from SwitchA failed. Which statement is true?()
A

Executing password recovery is required.

B

The virtual terminal lines are misconfigured.

C

Use Telnet to connect to RouterA and then to NewSwitch to correct the error.

D

Power cycle of NewSwitch will return it to a default configuration.


参考答案

参考解析
解析: 暂无解析
更多 “单选题A system administrator installed a new switch using a script to configure it. IP connectivity was tested using pings to SwitchB. Later attempts to access NewSwitch using Telnet from SwitchA failed. Which statement is true?()A Executing password recovery is required.B The virtual terminal lines are misconfigured.C Use Telnet to connect to RouterA and then to NewSwitch to correct the error.D Power cycle of NewSwitch will return it to a default configuration.” 相关考题
考题 The network administrator has just finished installing a new 10/100/1000 switch, but receives reports from the server administrator that servers connected to the new switch seem to be experiencing slow LAN connections. The network administrator checks the port connecting the new switch to the core switch and sees the following information:Which of the following is the MOST likely cause of the slow connections?()A. The servers have not had VLAN tagging enabled on their NICs.B. Speed and duplex have not been set.C. VLAN tagging was not set on the trunk.D. The servers have been connected with CAT5 cable.

考题 A network administrator has installed an N7K-F248-25XP module into an existing chassis. The module is powered on, but the interfaces are all in VDC0. What is the reason for this?()   A、 The chassis needs an EPLD upgrade to support the new module type.B、 The default VDC cannot support F2 modules.C、 The interfaces must be allocated into a VDC for F2 modules only.D、 The module has failed GOLD diagnostics, and the switch has isolated the ports to protect the integrity of the system.

考题 Enabling jumbo frame support on a Cisco Nexus 5500 Switch can be done through which method?()   A、 changing the default policy map from a default MTU of 1500 to 9216B、 using the command system jumbomtu 9216C、 using the command interface MTU 9216D、 configuring the default Ethernet system class to an MTU of 9216 with a new network QoS policy map

考题 An administrator installed new components on a server. After the device installation, two of the components fail.Which of the following is the cause of the problem?()A、The server was not powered off correctly.B、The proper ESD procedures were not used.C、The devices were installed in the incorrect sequence.D、The devices are incompatible with the system.

考题 A storage specialist needs to automate some tasks triggered in the event of disaster recovery.  What is the best solution to accomplish this()A、using the DS GUI, step through Real Time Manager, Copy Services, Create custom scripts; actions and event conditions can be defined that triggerthe script; there is no need for a passwordB、create a shell script usingdscli commands; trigger the script from the operating system, and call the script using the -pwd option with the passwordC、create a password file; create a shell script using dscli commands; trigger the script from the operating systemD、create a password file; create a shell script usingdscli commands; trigger the script from the operating system; call the dscli script with the dscli -script  -pwdfile command

考题 You are planning a new VLAN-based network solution.  What is one item you should consider when creating your implementation plan as it concerns VLANs?()A、generic router and switch configuration parametersB、end-to-end test plan after all components have been installed and  configuredC、administrator assignmentsD、rollback plan

考题 A system administrator installed a new switch using a script to configure it. IP connectivity was tested using pings to SwitchB. Later attempts to access NewSwitch using Telnet from SwitchA failed. Which statement is true?()A、Executing password recovery is required.B、The virtual terminal lines are misconfigured.C、Use Telnet to connect to RouterA and then to NewSwitch to correct the error.D、Power cycle of NewSwitch will return it to a default configuration.

考题 The administrator has just installed a new memory module into the server. Now, the server is not showing the new memory. Which of the following should the administrator perform FIRST?()A、System rebootB、Reseat the memoryC、Install the latest firmwareD、Install the latest driver

考题 A system administrator is doing an AIX 5L New and Complete Overwrite installation on a system with a 64-bit processor using the default settings. Which of the following will be the resulting installed environment?()A、Only the 32-bit kernel will be installed and enabledB、Only the 64-bit kernel will be installed and enabledC、Both the 32-bit and 64-bit kernel will be installed and the 32-bit kernel will be enabledD、Both the 32-bit and 64-bit kernel will be installed and the 64-bit kernel will be enabled

考题 A system administrator has just installed a new maintenance level, but "oslevel -r" does not show the correct maintenance level. What command can be used to determine which filesets are downlevel?()A、lppchkB、instfixC、fixdistD、maintlvl

考题 A System p administrator has just installed a new technology level, but "oslevel -r" does not show the expected technology level.  Which of the following commands would determine which filesets are downlevel()A、lppchkB、instfixC、oslevelD、installp

考题 A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A、 vmstat and iostat data from the older machines B、 The number of CPUs that were installed in the original machines C、 Data from Workload Estimator (WLE) and IBM Performance Management (PM) D、 Performance data that is collected from the new system after it has been put into production

考题 A new application has been added to a system which needs to automatically be started at system startup. The system administrator has decided to accomplish this by using the /etc/inittab file. Which command would be used to accomplish this in a supported manner?()A、viB、mkitabC、telinitD、startsrc

考题 How does a system administrator add a new user to a system?()A、mkuserB、cruserC、adduserD、edit /etc/password

考题 An administrator has integrated a new application into an existing resource group. An application server withstart and stop scripts was defined and added to the resource group definition. The cluster was thensynchronized. How can the new application be started with minimal downtime?()A、The administrator will need to perform an rg_move operationB、The administrator will need to un-manage and re-manage the resource groupC、The administrator will need to execute the new start script from the command lineD、The new start script will be executed as part of the DARE operation to synchronize the cluster

考题 What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A、The new system requires 1 installed processor card for the GX++ bus adapterB、The new system requires a minimum of 2 installed processor cards for the GX++ bus adapterC、The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterD、The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter

考题 A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS.  Which of the following must be completed prior to this migration ()A、Upgrade system firmware to latest levelB、Upgrade to AIX 5.3C、Upgrade HMC to version 6.1D、Convert rootvg filesystems to JFS2

考题 While configuring a new adapter using cfgmgr, an administrator receives a warning message indicating that some device packages are not installed.  Additionally, the adapter displays in the Defined state.  Which command will resolve the issue and make the adapter available?()  A、shutdown -FrB、cfgmgr -i C、mkdev -l D、mknode /dev/

考题 单选题Enabling jumbo frame support on a Cisco Nexus 5500 Switch can be done through which method?()A  changing the default policy map from a default MTU of 1500 to 9216B  using the command system jumbomtu 9216C  using the command interface MTU 9216D  configuring the default Ethernet system class to an MTU of 9216 with a new network QoS policy map

考题 单选题An administrator installed new components on a server. After the device installation, two of the components fail.Which of the following is the cause of the problem?()A The server was not powered off correctly.B The proper ESD procedures were not used.C The devices were installed in the incorrect sequence.D The devices are incompatible with the system.

考题 单选题What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A The new system requires 1 installed processor card for the GX++ bus adapterB The new system requires a minimum of 2 installed processor cards for the GX++ bus adapterC The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterD The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter

考题 单选题An administrator has integrated a new application into an existing resource group. An application server withstart and stop scripts was defined and added to the resource group definition. The cluster was thensynchronized. How can the new application be started with minimal downtime?()A The administrator will need to perform an rg_move operationB The administrator will need to un-manage and re-manage the resource groupC The administrator will need to execute the new start script from the command lineD The new start script will be executed as part of the DARE operation to synchronize the cluster

考题 单选题An administrator wants to rackmount a new server.  Power and network outlets are available and cooling in the room is adequate to support the additional server. The new server is identical to the other servers already installed.  Which of the following items should the administrator FIRST verify before installing the server?()A HBA is compatible with the SAN fiber switch.B Update the newly installed server with the latest KVM drivers.C The UPS will continue to perform as expected with the additional load.D Verify the server NIC is compatible with the NAS.

考题 单选题A System p administrator plans to install a new system with AIX 5.3 TL5 using a NIM server.  Which of the following provide post install diagnostics()A SPOTB lpp_sourceC mksysbD install CD

考题 单选题A storage specialist needs to automate some tasks triggered in the event of disaster recovery.  What is the best solution to accomplish this()A using the DS GUI, step through Real Time Manager, Copy Services, Create custom scripts; actions and event conditions can be defined that triggerthe script; there is no need for a passwordB create a shell script usingdscli commands; trigger the script from the operating system, and call the script using the -pwd option with the passwordC create a password file; create a shell script using dscli commands; trigger the script from the operating systemD create a password file; create a shell script usingdscli commands; trigger the script from the operating system; call the dscli script with the dscli -script  -pwdfile command

考题 单选题You are using Enterprise Manager to schedule backups for your database.  Which type of script wouldbe generated by the backup scheduler()A XML scriptB PL/SQL scriptC Operating system scriptD Recovery Manager (RMAN) script

考题 单选题An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A An additional switch for the new HMc  B Asynchronous adapters on the new HMcC The two 570 servers are directly connected to the new HMc  D One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

考题 单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A An additional switch for the new HMCB Asynchronous adapters on the new HMCC The two 570 servers are directly connected to the new HMCD One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC