●Ravi, like many project (71) ,had studied the waterfall model of software development as the primary software life-cycle (72) .He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (73) and not as (74) .

The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice.To be the most suitable, an existing process must be (75) to the new problem.A

development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.

(71) A.customers B.managers C.users D.administrators

(72) A.activity B.procedure C.process D.progress

(73) A.parts B.modules C.software D.a whole

(74) A.parts B.modules C.software D.a whole

(75) A.modified B.used C.suited D.tailored


参考答案

更多 “ ●Ravi, like many project (71) ,had studied the waterfall model of software development as the primary software life-cycle (72) .He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (73) and not as (74) .The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice.To be the most suitable, an existing process must be (75) to the new problem.Adevelopment process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.(71) A.customers B.managers C.users D.administrators(72) A.activity B.procedure C.process D.progress(73) A.parts B.modules C.software D.a whole(74) A.parts B.modules C.software D.a whole(75) A.modified B.used C.suited D.tailored ” 相关考题
考题 Many ______ large and big business ______ been built up from small ones. A. a, hasB. /, hasC. a, haveD. a, had

考题 ● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.(71)A.riskB.problemC.resultD.data

考题 ● Software (71) refers to that the software to meet the specification must be produced.(71)A. testB. supportC. developmentD. process

考题 Computer systems consist of two very different types of elements: Hardware, which includes all the physical things that can be touched and(71)which tells the hardware how to do.A.Operating systemB.I/O devicesC.CoursewareD.Software

考题 Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.A.riskB.problemC.resultD.data

考题 Asystems architecture is a representation of a system in which there is amapping of(71)onto hardware and softwarecomponents, a mapping of the(72)onto thehardware architecture. and a concern for the human interaction with thesecomponents. That is, system architecture is concerned with a total system, includinghardware. software, and humans.Softwarearchitectural structures can be divided into three major categories, dependingon the broad nature of the elements they show.1)(73)embodydecisions as a set of code or data units that have to be constructed orprocured.2)(74)embody decisions as to how the systemis to be structured as set of elements that have runtime behavior. andinteractions.3)(75)embody decisions as to how thesystem will relate to nonsoftware structures in itsenvironment(suchas CPUs, file systems, networks, development teams, etc.).71.( )A.attributesB.constraintC.functionalityD.requirements

考题 Examine the following options, Multicasting supports applications that communicate.() A. many - to - oneB. one - to - oneC. one - to - manyD. many - to - many

考题 Software engineering is the study and an application of engineering to the design,development,and(71)of software.A.maintenance B.service C.running D.deployment

考题 英汉互译: waterfall