网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

A verification plan shows a network diagram with branch office Routers B1 through B100, plus two ABRs, ABR1, and ABR2, all in area 100. The branches connect to the ABRs using Frame Relay point - to - point subinterfaces. The verification plan lists the output of the show i p ospf database summary 10.100.0.0 command on a router B1, one of the branches. Which of the following is true regarding the output that could be listed for this command?()

  • A、The output lists nothing unless 10.100.0.0 has been configured as a summary rou te using the area range command.
  • B、If 10.100.0.0 is a subnet in area 0, the output lists one Type 3 LSA, specifically the LSA with the lower metric when comparing ABR1's and ABR2's LSA for 10.100.0.0.
  • C、If 10.100.0.0 is a subnet in area 0, the output lists two Type 3 LSAs, one each created by BR1 and ABR2.
  • D、None, because the Type 3 LSAs would exist only in the ABR's LSDBs.

参考答案

更多 “ A verification plan shows a network diagram with branch office Routers B1 through B100, plus two ABRs, ABR1, and ABR2, all in area 100. The branches connect to the ABRs using Frame Relay point - to - point subinterfaces. The verification plan lists the output of the show i p ospf database summary 10.100.0.0 command on a router B1, one of the branches. Which of the following is true regarding the output that could be listed for this command?()A、The output lists nothing unless 10.100.0.0 has been configured as a summary rou te using the area range command.B、If 10.100.0.0 is a subnet in area 0, the output lists one Type 3 LSA, specifically the LSA with the lower metric when comparing ABR1's and ABR2's LSA for 10.100.0.0.C、If 10.100.0.0 is a subnet in area 0, the output lists two Type 3 LSAs, one each created by BR1 and ABR2.D、None, because the Type 3 LSAs would exist only in the ABR's LSDBs.” 相关考题
考题 In which of the following scope management processes is the scope management plan prepared?A . InitiationB . Scope planningC . Scope DefinitionD . Scope change controlE . Scope verification

考题 143 In which of the following scope management processes is the scope management plan prepared?A. InitiationB. Scope planningC. Scope DefinitionD. Scope change controlE. Scope verification

考题 The identification and removal of bugs in a program is called”(73)A.checkingB.debuggingC.revisionD.verification

考题 You are developing a verification plan for an upcoming OSPF implementation. Part of this plan is to verify the status of type 3 LSAs within the network. Which routers should you verify first to ensure that the configuration s are correct for generating type 3 LSAs?()A. Internal routers within the backbone area (area 0)B. Internal routers within the NSSAsC. Internal routers within the stubby areasD. ASBRsE. ABRsF. DRs and BDRs

考题 下面哪些路由器带有LCD显示屏(). A.NE20B.NE40C.NE80ED.NE5000E

考题 The tentative cargo plan ________ .A.eliminates confusion with the final stowage planB.shows the approximate amount of cargo to be loaded in each holdC.expedites the total operationD.requires an unproportional number of gang hours of work to discharge the cargo

考题 The identification and removal ofbugs in a program is called "( )".A.checking B.debugging C.revision D.verification

考题 Validation是(),Verification是()。

考题 NE40E包括下列哪几个型号()A、NE40E-2B、NE40E-4C、NE40E-6D、NE40E-8

考题 5520 AMS GUI上,要创建一个NE组,则必须给用户分配哪些安全功能。A、NE-创建B、NE-删除C、NE-编辑D、NE-移动

考题 下面哪些路由器带有LCD显示屏().A、NE20B、NE40C、NE80ED、NE5000E

考题 NE20系列路由器有包括:()。A、NE20-2B、NE20-4C、NE20-6D、NE20-8

考题 料饼提升机的型号()A、NE600B、NE400C、NE800D、NE200

考题 以下对NE80和NE40的主控板说法正确的是()。A、NE80的MPU板可以和NE40的SRU板混用B、NE80的MPU板可用在NE40上,但NE40的SRU板不能用在NE80上C、NE40的SRU板可用在NE80,但NE80的MPU板不可以用在NE40上D、NE80的MPU板不可以和NE40的SRU板混用

考题 You have just created a new VLAN on your network.  What is one step that you should include in your VLAN-based implementation and verification plan? ()A、Verify that trunked links are configured to allow the VLAN traffic.B、Verify that the switch is configured to allow for trunking on the switch ports.C、Verify that each switch port has the correct IP address space assigned to it for the new VLAN.D、Verify that different native VLANs exist between two switches for security purposes.

考题 You are developing a verification plan for an upcoming OSPF implementation. Part of this plan is to verify the status of type 3 LSAs within the network. Which routers should you verify first to ensure that the configuration s are correct for generating type 3 LSAs?()A、Internal routers within the backbone area (area 0)B、Internal routers within the NSSAsC、Internal routers within the stubby areasD、ASBRsE、ABRsF、DRs and BDRs

考题 You have just completed an OSPF implementation. While executing your verification plan, you determine that R1 is not able to establish full OSPF adjacency with R2. The show ip ospf neighbor comman d output on R1 shows that R2 is stuck in the INIT state. What could be the cause of this problem?()A、DR and BDR election errors between R1 and R2.B、The R2 router has not received the OSPF hello packets from the R1 router.C、Mismatched interface ma ximum transmission unit (MTU) configuration between the R1 and R2.D、Mismatched OSPF hello interval configuration between the R1 and R2E、Corrupted LSAs exchanges between the R1 and R2.

考题 A cluster administrator has decided to add a cluster verification to the weekly maintenance scripts  That are run from corn.  When a cluster verification is performed,which of the following will require a custom verification method?()  A、 HACMP ODM object classesB、 HACMP Error NotificationC、 HACMP Topology  ResourcesD、 HACMP Application Server Start/Stop scripts

考题 The Database Resource Manager is not currently active in your database that is up and running. You created a resource plan named DAY_PLAN that contains two sub-plans named MANAGERS_PLAN and CLERKS_PLAN. You decided to activate DAY_PLAN by executing the following statement:       SQLALTER SYSTEM SET RESOURCE_MANAGER_PLAN = ’managers_plan’;  What will be the outcome of this statement?()  A、 The statement will deactivate DAY_PLAN.B、 The statement will activate DAY_PLAN as the top plan.C、 The statement will activate MANAGERS_PLAN as the top plan.D、 The statement will return an error because MANAGERS_PLAN is not the top plan.

考题 Which three statements are true about adaptive SQL plan management?()A、It automatically performs verification or evolves non-accepted plans, in COMPREHENSIVE mode when they perform better than existing accepted plans.B、The optimizer always uses the fixed plan, if the fixed plan exists in the plan baseline.C、It adds new, bettor plans automatically as fixed plans to the baseline.D、The non-accepted plans are automatically accepted and become usable by the optimizer if they perform better than the existing accepted plans.E、The non-accepted plans in a SQL plan baseline are automatically evolved, in COMPREHENSIVE mode, during the nightly maintenance window and a persistent verification report is generated.

考题 单选题A cluster administrator has decided to add a cluster verification to the weekly maintenance scripts  That are run from corn.  When a cluster verification is performed,which of the following will require a custom verification method?()A  HACMP ODM object classesB  HACMP Error NotificationC  HACMP Topology  ResourcesD  HACMP Application Server Start/Stop scripts

考题 单选题一条无保护链由四个网元:NE1、NE2、NE3、NE4组成;创建一条NE1-NE4的端到端的VC4路径,然后,扩容,在NE2、NE3之间增加一站点NE5;原有配置不改变;这时,无保护链变为:NE1、NE2、NE5、NE3、NE4;进行路径搜索,能搜索到()条VC4路径。(NE1-NE5;NE5-NE4;)A 0B 1C 2D 3

考题 单选题Company.com performs a cluster verification on a regular basis. Cluster verification is successfulbut the cluster sometimes fails to start the applications during a fallover. Investigation of the issue has revealed that the non-shared component of the application configuration information is not being kept up to date on the secondary nodes.  What can be used to help resolve this issue?()A  A pre-eventB  Error notificationC  Application monitoringD  Custom verification methods

考题 单选题You are developing a verification plan for an upcoming OSPF implementation. Part of this plan is to verify the status of type 3 LSAs within the network. Which routers should you verify first to ensure that the configuration s are correct for generating type 3 LSAs?()A Internal routers within the backbone area (area 0)B Internal routers within the NSSAsC Internal routers within the stubby areasD ASBRsE ABRsF DRs and BDRs

考题 多选题Which three statements are true about adaptive SQL plan management?()AIt automatically performs verification or evolves non-accepted plans, in COMPREHENSIVE mode when they perform better than existing accepted plans.BThe optimizer always uses the fixed plan, if the fixed plan exists in the plan baseline.CIt adds new, bettor plans automatically as fixed plans to the baseline.DThe non-accepted plans are automatically accepted and become usable by the optimizer if they perform better than the existing accepted plans.EThe non-accepted plans in a SQL plan baseline are automatically evolved, in COMPREHENSIVE mode, during the nightly maintenance window and a persistent verification report is generated.

考题 单选题A verification plan shows a network diagram with branch office Routers B1 through B100, plus two ABRs, ABR1, and ABR2, all in area 100. The branches connect to the ABRs using Frame Relay point - to - point subinterfaces. The verification plan lists the output of the show i p ospf database summary 10.100.0.0 command on a router B1, one of the branches. Which of the following is true regarding the output that could be listed for this command?()A The output lists nothing unless 10.100.0.0 has been configured as a summary rou te using the area range command.B If 10.100.0.0 is a subnet in area 0, the output lists one Type 3 LSA, specifically the LSA with the lower metric when comparing ABR1's and ABR2's LSA for 10.100.0.0.C If 10.100.0.0 is a subnet in area 0, the output lists two Type 3 LSAs, one each created by BR1 and ABR2.D None, because the Type 3 LSAs would exist only in the ABR's LSDBs.

考题 单选题You have just created a new VLAN on your network for inter-VLAN routing.  What is one step that you should include in your VLAN-based implementation and verification plan?()A Verify that different native VLANs exist between two switches for security purposes.B Verify that the switch is configured to allow for trunking on the switch ports.C Verify that each switch port has the proper IP address space assigned to it for the new VLAN. D Verify that the VLAN virtual interface has been correctly created and enabled.