网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
A customer has a new p5-550 running AIX 5.2 that is SAN-attached to a FAStT900. They have encountered hangs lasting over a minute on their new system during application load testing. They called the pSeries technical specialist for advice. Which of the following would be the most appropriate questions to determine their next step in resolving the problem?()
- A、Are there any errors in the error log? Do they indicate any hardware or software errors?
- B、Has performance data been collected? What do the results show in terms of I/O statistics?
- C、Has performance data been collected? What do the results show in terms of CPU utilization?
- D、What type of SAN switch is the customer using? What are the microcode levels on the switch?
参考答案
更多 “A customer has a new p5-550 running AIX 5.2 that is SAN-attached to a FAStT900. They have encountered hangs lasting over a minute on their new system during application load testing. They called the pSeries technical specialist for advice. Which of the following would be the most appropriate questions to determine their next step in resolving the problem?()A、Are there any errors in the error log? Do they indicate any hardware or software errors?B、Has performance data been collected? What do the results show in terms of I/O statistics?C、Has performance data been collected? What do the results show in terms of CPU utilization? D、What type of SAN switch is the customer using? What are the microcode levels on the switch?” 相关考题
考题
The pSeries sales representative has done an excellent job in educating the customer on the benefits of working with IBM. The customer is planning to implement their first ERP application. This new application will be critical to running their business. The customer has only a competitor’s UNIX systemcurrently installed. They are interested in obtaining a proposal from IBM. In addition to the AIX hardware and HACMP software, what else should be included in the IBM proposal for the new ERP solution?()A、I/T services and education to help with the implementation of the hardware and softwareB、A Supportline specialist to work directly with the customer to manage any issues that ariseC、The services required to move the currently installed applications from the competitor’s systems to the IBM systemsD、A slimmed down solution to ensure that the IBM solution is less expensive than the competitor’s solution
考题
A customer has requested a proposal for a p5-520 with AIX 5.2 and Sysback. There are no plans to run LPARs or Micro-Partitions on the p5-520 in the near future. The customer has asked the pSeries technical specialist to recommend anything else that may be needed. Which of the following should be recommended in this situation?()A、HMCB、DVD-ROMC、Tape driveD、Network switch
考题
After visiting several customers, the pSeries technical specialist returns to the office late in the day and makes a list of the various customer requests. The specialist decided to complete at least one task before leaving for the day. Which of the following is most important to complete immediately?()A、Send a flyer on new p5-520. B、Provide shipment delivery status.C、Order a new system per the purchase order.D、Retrieve and send a whitepaper on SCSI performance.
考题
A customer has budget sign-off to purchase a new p5-550 2-way server to replace their aging 2-way 7025-6F0. They like the advantages of the Simultaneous Multi Processing (SMT) ability of this server. Their application is certified at AIX 5.2 and is scheduled for AIX 5.3 certification in six months. The Chief Information Officer is concerned that they will lose the budget if they do not purchase the server this fiscal year. What is the most relevant and cost-effective advice the pSeries technical specialist can offer?()A、Purchase a 4-way p630 to compensate for not using SMT.B、Purchase the p5-550 server and install AIX 5.2, which can be upgraded to AIX 5.3 later.C、Purchase the p5-550 server and install AIX 5.2 and enable SMT.D、Suspend the purchase of a new machine at this time and upgrade the current server to a 4-way server.
考题
A financial industry customer will consolidate their Intel-based servers to a p5-550 running AIX, and needs experienced technical services. What information should the account executive provide to the customer to assure them that the technical specialist has the required experience?()A、The technical specialist has supported multiple Cluster 1350 environments. References will be provided.B、The technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.C、The technical specialist has worked on multiple UNIX consolidation projects. References will be provided.D、The technical specialist has worked on Linux consolidation efforts. References will be provided.
考题
A customer needs both a database and application server to communicate over a network. The new systems will be connected to the same network as the current IBM equipment with known IBM serial numbers. How could a pSeries technical specialist best determine which type of network card is appropriate, without making an additional call to the customer?()A、Use an Inventory Services retrieval to show adapter features.B、Retrieve previous eConfig proposals to see what others had shown.C、Call the Account Executive to ask what the customer has used in the past.D、Query the Supportline problem record database for the customer and LAN keyword matches.
考题
Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool. Prior to the implementation of the system, the customer informs the technical specialist that one of the applications is only supported on AIX 5L 5.2. Which of the following changes to the system design should the technical specialist make to accommodate this change?()A、Create all the partitions as AIX 5.2, each having two dedicated processors.B、Purchase a system with two additional processors that can be assigned to the AIX 5.2 Partition.C、Specify an AIX 5.2 partition using dedicated processors, reducing the number of processors in the shared pool.D、Use the virtual I/O server to manage the disks and network connections removing the need for different levels of device drivers.
考题
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()A、The EMC storage specialist has not participated in the TDA meetingB、The FC HBAs are 4 Gbps technologyC、The Technical and Delivery Assessment review actions were not executedD、The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
考题
A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications. The pSeries technical specialist should recommend purchasing which of the following?()A、p5 hardware, AIX 5.2, Virtual I/O ServerB、POWER4 hardware, AIX 5.3, Virtual I/O Server,C、p5 hardware, AIX 5.3, Advanced POWER Virtualization featureD、POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature
考题
A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()A、IBM TechlineB、IBM SupportlineC、IBM Software DistributionD、IBM Hardware Support
考题
A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()A、The technical support specialist has completed a UNIX course at college.B、The technical specialist has supported several similar projects and has earned an IBM AIX certification.C、The technical support specialist’s company sells $3M of UNIX computer systems every year.D、The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
考题
A customer is considering the purchase of an XIV system to leverage thin provisioning. They are concerned that their application will use all available space during formatting, which will remove any thin provisioning benefits. What should the storage specialist discuss with the customer?()A、the possibility of changing the application so this no longer happensB、with the XIV system's SATA basedapproach, storage costs are so low that over-provisioning is not an issueC、the XIV system has immediate zero page reclamation features that will immediately return the volume to its original sizeD、the XIV system has a white space reclamation feature that will return the volume to its original thin provisioned size over time
考题
A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs. The current applications are certified on AIX 5.2 but not yet on AIX 5.3. The customer wants to understand the advantages and disadvantages of this solution versus a pair of 4-way p5-550s with 16GB each in testing their current applications. Which of the following points should the pSeries technical specialist highlight?()A、The p5-570 would save rack space over a pair of p5-550 servers.B、The p5-570 allows for more CPU and memory resources to be dynamically allocated to any LPAR for performance testing.C、The p5-570 can only be upgraded to 64GB of RAM without replacing memory.D、The p5-570 supports advanced features such as Micro-Partitioning and Virtual I/O allowing more LPARs of the customer’s applications with fewer processors and fewer I/O adapters.
考题
Companycom is migrating their application that was built on AIX 4.3, to a new p5 590 system that is running AIX 5.3. The application was a 32-bit program. What will need to be done with the application to allow it to run on the new system?()A、Run without recompiling on AIX 5.3B、Relink to the 32-bit kernel in order to run the applicationC、Recompile to run on AIX 5.3 because the libraries are in different locationsD、Recompile 32-bit applications because the compiler flags and versions have changed
考题
A customer is getting ready to install a new pSeries system into their data center. They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance. What reference material should the pSeries technical specialist provide to the customer?()A、Sales ManualB、Announcement LetterC、Site and Hardware Planning InformationD、Adapter, Devices, and Cable Information for Multiple Bus Systems
考题
A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future. Which pSeries system would be positioned best to meet this customer’s requirements?()A、p5-550 with the Advanced POWER Virtualization feature and AIX 5.2B、p5-550 with the POWER5 processor technology and AIX 5.2C、p5-570 with the Advanced POWER Virtualization feature and AIX 5.3D、p5-570 with the POWER5 processor technology and AIX 5.2
考题
A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()A、Direct the customer to the Installation Guide for each system to identify the power requirements.B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.
考题
A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers. They have four identical new applications each requiring a minimum of seven processors and 96GB of memory. Which solution would best meet the customer’s requirements?()A、Two p670 serversB、Four p650 serversC、Two p5-570 serversD、Four p5-550 servers
考题
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A、Order a new HMC to support the p5 system.B、Attach the new p5 system to the existing HMC.C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D、Do nothing. This system does not require an HMC.
考题
A customer has several small AIX applications that are expected to grow over the next several years. The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth. They are also concerned about the under-utilization of their IT resources. What should the pSeries technical specialist recommend to address this challenge?()A、Install a p615 per application.B、Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.C、Install the appropriate solution once the requirements are understood.D、Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.
考题
A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()A、Explain to the customer that they need an additional HMC for the POWER5 system.B、Obtain a PO from the customer to purchase additional serial connections to the HMC.C、Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.D、Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
考题
单选题A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()A
The technical support specialist has completed a UNIX course at college.B
The technical specialist has supported several similar projects and has earned an IBM AIX certification.C
The technical support specialist’s company sells $3M of UNIX computer systems every year.D
The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
考题
单选题A customer left a message on the pSeries technical specialist’s voicemail that a proposal is needed for a p5-550 4-way 1.4GHz 8GB machine. The specialist configured a p5-570 4-way 1.5GHz 8GB machine and sent it to the customer with a note that this system was the closest match to that requested.could the specialist have done to minimize any customer dissatisfaction in an efficient manner?()A
AB
BC
CD
D
考题
单选题A financial industry customer will consolidate their Intel-based servers to a p5-550 running AIX, and needs experienced technical services. What information should the account executive provide to the customer to assure them that the technical specialist has the required experience?()A
The technical specialist has supported multiple Cluster 1350 environments. References will be provided.B
The technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.C
The technical specialist has worked on multiple UNIX consolidation projects. References will be provided.D
The technical specialist has worked on Linux consolidation efforts. References will be provided.
考题
单选题A customer has a new p5-550 running AIX 5.2 that is SAN-attached to a FAStT900. They have encountered hangs lasting over a minute on their new system during application load testing. They called the pSeries technical specialist for advice. Which of the following would be the most appropriate questions to determine their next step in resolving the problem?()A
Are there any errors in the error log? Do they indicate any hardware or software errors?B
Has performance data been collected? What do the results show in terms of I/O statistics?C
Has performance data been collected? What do the results show in terms of CPU utilization? D
What type of SAN switch is the customer using? What are the microcode levels on the switch?
考题
单选题An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()A
The EMC storage specialist has not participated in the TDA meetingB
The FC HBAs are 4 Gbps technologyC
The Technical and Delivery Assessment review actions were not executedD
The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
热门标签
最新试卷