单选题
No claim for constructive total loss based upon the cost of recovery and/or repair of the Vessel shall be recoverable hereunder unless such cost would exceed().
A

the stated value

B

the sound valve of the vessel at the time of occurrence

C

the lost value

D

the insured value


参考答案

参考解析
解析: 暂无解析
更多 “单选题No claim for constructive total loss based upon the cost of recovery and/or repair of the Vessel shall be recoverable hereunder unless such cost would exceed().A the stated valueB the sound valve of the vessel at the time of occurrenceC the lost valueD the insured value” 相关考题
考题 The scope of a project can be expected to change if:A.The project manager must provide cost estimates without having a design conceptB.Oversimplification (underestimating) of the nature of the work occursC.The project manager is assigned after the project is defined, and the cost and schedule are approvedD.A clear objective is not providedE.All of the above are possible based upon the situation

考题 A network has been developed with resources from six different departments. One of the six departments has just informed you that they can increase the number of employees from to . This will result in:A.A shortening of the critical path.B.A shortening of the noncritical path.C.A decrease in the total cost of the project.D.An increase in the cost of the project.E.A through D are possible based upon where the resources are deployed.

考题 Statistical cost estimating techniques (based upon history), are called _____ estimates and are a _____ approach.A . Definitive, bottom up.B . Analogy, top down.C . Parametric, bottom up.D . Parametric, top down.E . Analogy, bottom up.

考题 104 A network has been developed with resources from six different departments. One of the six departments has just informed you that they can increase the number of employees from 5 to 8. This will result in:A. A shortening of the critical path.B. A shortening of the noncritical path.C. A decrease in the total cost of the project.D. An increase in the cost of the project.E. A through D are possible based upon where the resources are deployed

考题 50 Statistical cost estimating techniques (based upon history), are called _____ estimates and are a _____ approach.A. Definitive, bottom up.B. Analogy, top down.C. Parametric, bottom up.D. Parametric, top down.E. Analogy, bottom up.

考题 41 The scope of a project can be expected to change if:A. The project manager must provide cost estimates without having a design concept B. Oversimplification (underestimating) of the nature of the work occursC. The project manager is assigned after the project is defined, and the cost and schedule are approvedD. A clear objective is not providedE. All of the above are possible based upon the situation

考题 123 The scope of a project can be expected to change if:A. The project manager must provide cost estimates without having a design concept B. Oversimplification (underestimating) of the nature of the work occursC. The project manager is assigned after the project is defined, and the cost and schedule are approved D. A clear objective is not providedE. All of the above are possible based upon the situation

考题 ● The scope of a project can be expected to change if:A The project manager must provide cost estimates without having a design conceptB Oversimplification (underestimating) of the nature of the work occursC The project manager is assigned after the project is defined, and the cost and schedule are approvedD A clear objective is not providedE All of the above are possible based upon the situation

考题 总固定成本〔Total cost)

考题 By default, which of the following factors determines the spanning-tree path cost?A.It is the individual link cost based on latencyB.It is the sum of the costs based on bandwidthC.It is the total hop countD.It is dynamically determined based on loadE.None of the above

考题 In the case of ________ the Insured ship,this Company shall be liable for the reasonable costs of replacements and repairs.A.loss of or damage toB.a partial loss toC.the missing ofD.a total loss of

考题 A fire has damaged 20 bales of cotton on a freighter loaded with general cargo. This claim would come under ______.A.constructive total lossB.general averageC.particular averageD.total loss of a part

考题 Where a vessel is redelivered to the Shipowner and is not in the same good order as when delivered due to the Charterer's fault,and repairs to her have to be effected in order to restore her to that condition,the Shipowner can ______ the cost of repairs and any loss of profit whilst she is being repaired.A.wantB.sendC.deliverD.claim

考题 A vessel has been damaged by fire. The survey shows the cost of repairs will exceed the value of the repaired vessel. This is an example of a(n) ______.A.constructive total lossB.salvage lossC.actual lossD.preferred loss

考题 The trading company () a big loss raised a claim against the exporter.Abe sufferedBsufferedCto sufferDsuffering

考题 The trading company () a big loss raised a claim against the exporter.A、be sufferedB、sufferedC、to sufferD、suffering

考题 GMPLS is based upon Non-Packet-based devices.()A、TrueB、False

考题 总成本(Total cost)

考题 Pipeline is able to deliver the products based on the advantages of low rate of loss and damage, minimal climatic effects and reduced labor cost. Do you agree? ()A、Yes, I do.B、No, I do think so.C、I don’t find it hereD、I can’t find it here

考题 By default, which of the following factors determines the spanning-tree path cost?()A、It is the individual link cost based on latencyB、It is the sum of the costs based on bandwidthC、It is the total hop countD、It is dynamically determined based on load

考题 单选题A vessel has been damaged by fire. The survey shows the cost of repairs will exceed the value of the repaired vessel. This is an example of a(n)().A constructive total lossB salvage lossC actual lossD preferred loss

考题 单选题By default, which of the following factors determines the spanning-tree path cost?()A It is the individual link cost based on latencyB It is the sum of the costs based on bandwidthC It is the total hop countD It is dynamically determined based on load

考题 单选题A fire has damaged 20 bales of cotton on a freighter loaded with general cargo. This claim would come under().A constructive total lossB general averageC particular averageD total loss of a part

考题 单选题The trading company () a big loss raised a claim against the exporter.A be sufferedB sufferedC to sufferD suffering

考题 单选题GMPLS is based upon Non-Packet-based devices.()A TrueB False

考题 单选题A ballasted vessel sinks enroute to a drydock. Under these circumstances,the vessel’s owner can claim().A actual total lossB constructive total lossC general averageD particular average

考题 单选题A ballasted vessel sinks enroute to a dry dock. Under these circumstances,the vessel’s owner can claim().A actual total lossB constructive total lossC general averageD particular average