网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The clutch band of a constant tensioning mooring winch must be set up tight enough to drive the winch drum and should slip only when ().
A

excessive loads are placed on the winch

B

minimum pull is being exerted by the winch

C

automatic operation of the winch is desired

D

wire is being retrieved at the maximum rate


参考答案

参考解析
解析: 暂无解析
更多 “单选题The clutch band of a constant tensioning mooring winch must be set up tight enough to drive the winch drum and should slip only when ().A excessive loads are placed on the winchB minimum pull is being exerted by the winchC automatic operation of the winch is desiredD wire is being retrieved at the maximum rate” 相关考题
考题 EVDO的标准支持从()频段。 A.Band0到Band7B.Band1到Band7C.Band1到Band6D.Band0到Band6

考题 Which one of the followings is not a right way to behave during mooring unmooring operation?—_______.A.Stay close to the towline at all timeB.Beware the bightsC.When operating the winch/windlass,ensure that yourself understand the controlsD.When the tug is being secured or let go, monitor the operation closely

考题 When the ship, its main propulsion device equipped with clutch, arrived at the port and finished with the engine, the correct operation should be______.A.disengaging the clutch firstly, then stopping the main engineB.stopping the main engine firstly, then disengaging the clutchC.stopping the cooling water pump firstly, then stopping the main engineD.stopping the main engine and disengaging the clutch at the same time

考题 Mooring winch should be equipped with mechanical brakes capable of holding ______.A.half the breaking strength of the mooring lineB.the full breaking strength of the mooring lineC.the maximum expected tension of the mooring lineD.50% over the working tension of the mooring line

考题 During the valve overlap period, the exhaust pressure of a turbocharged four-stroke/cycle diesel engine must be less than the intake manifold pressure to ensure ______.A.effective cylinder scavenging and coolingB.constant pressure from the turbochargersC.cooler operation of the exhaust systemD.effective constant pressure for turbocharger operation

考题 Mooring winch should be equipped with mechanical brakes which are capable of holding ______.A.half the breaking strength of the mooring lineB.the full breaking strength of the mooring lineC.the maximum expected tension of the mooring lineD.50% over the working tension of the mooring line

考题 If two mooring lines are to be placed on the same bollard,which method is BEST?______.A.Place the eye from the forward line on the bollard and then place the eye from the second line directly over the firstB.It makes no difference how the lines are placedC.Place the eye from either line on the bollard,and then bring the eye of the other line up through the eye of the first,and place it on the bollardD.Place both eyes on the bollard,in any manner,but lead both lines to the same winch head on the vessel and secure them on the winch

考题 起货机出故障时,水手要去叫电工来修理。()A、When the windlass is in trouble, the sailor must go and call the electrician to repair it.B、When the derrick is in trouble, the sailor must go and call the electrician to repair it.C、When the winch is in trouble, the sailor must go and call the electrician to repair it.D、When the winch is in trouble, the sailor must go and call the carpenter to repair it.

考题 EVDO的标准支持从()频段。A、Band0到Band7B、Band1到Band7C、Band1到Band6D、Band0到Band6

考题 单选题A white buoy with a blue band is().A an isolated danger markB a hydrographic data collection buoyC a mooring buoyD marking a restricted area

考题 单选题To prevent the riser system from buckling under its own weight,upward tension is provided by the().A riser stabilizersB guideline tensioning systemC riser tensioning systemD guideline stabilizers

考题 单选题()is put into use in the late years to maintain a preset tension in a mooring line after a ship has been tied up at a pier.A The large-tension mooringB The small-tension mooringC The variable-tension mooringD The constant-tension mooring

考题 单选题(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.A The winch motorB The band brakeC The winch barrelD The anchor capstan

考题 单选题We must()the mooring lines when the tide rises and falls.A slack awayB take onC take inD adjust

考题 单选题If you are given the job of adding hydraulic fluid to a mooring winch, and are not certain as to the type of fluid to use, you should ().A add fluid that is the same color as the fluid in the reservoirB add turbine oil because it is always a good substituteC add any oil that has the same viscosity as the hydraulic fluidD check the winch manufacturers instruction book

考题 单选题In the constant-tension mooring, the mooring lines holding the ship to the pier will maintain a constant tension even with changes in tide or ship’s draft, ().A without the necessity of manually adjusting the linesB without the necessity of automatically adjusting the linesC with the necessity of manually adjusting the linesD with the un-necessity of automatically adjusting the lines

考题 单选题In which of the listed hydraulic systems will the installation of an oil cooler be necessary?()A Constant tension mooring winch systemB Hatch cover systemC Watertight door systemD Internal combustion engine hydraulic starter system

考题 单选题A mooring system that results in a spread system without anchor buoys is called a().A permanent chasing systemB wire rope mooring systemC shepherd's crook mooring systemD spring buoy mooring system

考题 单选题The crane jib is raised and lowered by means of ()A a mooring winchB a hoisting winchC a slewing winchD a luffing winch

考题 单选题If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().A when the line pull reaches the rated winch capacityB after the line pull exceeds the rated winch capacityC after a short build-up of torqueD immediately

考题 单选题When the winch is in trouble, the sailor must call the ()(电工) to repair it.A carpenterB ratingC electricianD bosun

考题 单选题The duty of a deck winch is to lift and lower a load by means of a fixed rope on ().A a warp endB a mooring winchC a worm gearD a barrel

考题 单选题Winch gears must be maintained in proper alignment to prevent ().A overheating of the lube oilB over-speeding of the motorC wear on the braking systemD damage to the teeth

考题 单选题An anchor winch should be equipped with mechanical brakes capable of holding().A half the breaking strength of the mooring lineB the full breaking strength of the mooring lineC the maximum expected tension of the mooring lineD 50% over the working tension of the mooring line

考题 单选题If two mooring lines are to be placed on the same bollard,which method is BEST?().A Place the eye from the forward line on the bollard and then place the eye from the second line directly over the firstB It makes no difference how the lines are placedC Place the eye from either line on the bollard,and then bring the eye of the other line up through the eye of the first,and place it on the bollardD Place both eyes on the bollard,in any manner,but lead both lines to the same winch head on the vessel and secure them on the winch

考题 单选题The soot blowers are operating in the oil fuel boiler the air/fuel ratio must () throughout the action, and blowers greased after use.A be increasedB be decreasedC remain constantD either be increased or remain constant

考题 单选题When the ship, its main propulsion device equipped with clutch, arrived at the port and finished with the engine, the correct operation should be()A disengaging the clutch firstly, then stopping the main engineB stopping the main engine firstly, then disengaging the clutchC stopping the cooling water pump firstly, then stopping the main engineD stopping the main engine and disengaging the clutch at the same time