网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
shore crane ()
A

龙门吊

B

浮吊

C

岸吊

D

起重机


参考答案

参考解析
解析: 暂无解析
更多 “单选题shore crane ()A 龙门吊B 浮吊C 岸吊D 起重机” 相关考题
考题 The electrical components for each single crane are installed in its ______.A.crane houseB.machinery baseC.turntableD.All of the above

考题 The net productivity per gang-hour can be improved through a decrease of ______.A.cranes/derricksB.crane/derrick cyclesC.crane/derrick cycle timeD.weight per package

考题 The term LEE SHORE refers to the ______.A.shore on the lee side of the vesselB.shore that is in the leeC.western shore of the Lesser AntillesD.shore in a harbor of refuge

考题 On no account ______ to be exceeded.A.is the SWL of the craneB.are the SWL of the craneC.the SWL of the crane isD.the SWL of the crane are

考题 Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels ________.A.A centerline crane can never be operated in tandemB.One crane is able to work one end of two adjacent hatchesC.These cranes are more economical and weigh less than outboard-mounted cranesD.One crane is able to work both sides of the ship

考题 Which of the following statements is TRUE regarding crane operations ________.A.Radio communications allow the crane operator to disregard the use of hand signalsB.The crane operators and signalman must be familiar with the correct hand signalsC.The forward cranes can be operated from the bridgeD.The aft cranes can be operated from the aft steering station

考题 The international shore connection ______.A.Allows hook up of fire fighting water from shore facilitiesB.Satisfies pollution prevention requirementsC.Allows emergency use of the fire main for deballastingD.Permits discharge of waste oil to shore facilities

考题 During which condition should the operator of a pedestal crane shutdown operations ________.A.Bunkering barge alongsideB.Potable water spill on deckC.Crane hydraulic hose burstsD.Trim greater than 4 feet

考题 浮吊()A、gantry craneB、floating craneC、shore craneD、overhead crane

考题 滨海(shore)

考题 前滨(fore shore)

考题 送撇缆上岸。()A、Send rope to shore .B、Send heavy line to shore .C、Send heaving line ashore .D、Send light line ashore .

考题 I think you’d better use the ()(岸吊).A、derrickB、heavy derrickC、shore craneD、floating crane

考题 shore crane ()A、龙门吊B、浮吊C、岸吊D、起重机

考题 水鹤 water crane

考题 英译中:Crane

考题 单选题The ()(笨重货) must be handled by jumbo boom or shore crane.A awkward cargoB drummed cargoC cased cargoD heavy cargo

考题 单选题On no account()to be exceeded.A is the S.W.L. of the craneB are the S.W.L. of the craneC the S.W.L. of the crane isD the S.W.L.of the crane are

考题 单选题On no account()to be exceeded.A is the SWL of the craneB are the SWL of the craneC the SWL of the crane isD the SWL of the crane are

考题 单选题Which of the following statements is TRUE regarding crane operations().A Radio communications allow the crane operator to disregard the use of hand signalsB The crane operators and signalman must be familiar with the correct hand signalsC The forward cranes can be operated from the bridgeD The aft cranes can be operated from the aft steering station

考题 单选题Which action(s) should the operator of a pedestal crane take if crane control is lost?()A Let go of both control levers and return to neutral positionB Press the emergency stopC Notify the mate on watchD All of the above

考题 单选题My radar is not working.I require shore based radar assistance.Is shore based radar assistance()?A usedB availableC in useD can be used

考题 单选题Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().A A centerline crane can never be operated in tandemB One crane is able to work one end of two adjacent hatchesC These cranes are more economical and weigh less than outboard-mounted cranesD One crane is able to work both sides of the ship

考题 单选题What following is not among the functions of SOLAS ships?()A receive shore-to-ship distress alertingB transmit ship-to-shore distress alertingC receive message for public correspondenceD transmit and receive locating signals

考题 名词解释题水鹤 water crane

考题 单选题In a ordinary cargo crane, () is fitted to rotate the crane.A the slewing motorB the lulling motorC the hoisting motorD none of the above

考题 单选题An oceangoing ship of 400 gross tons and above must be fitted with a standard discharge shore connectionWhat is the size of the bolt circle diameter of the shore connection required to transfer oily ballast to a shore side reception facility?()A 125 mmB 183 mmC 215 mmD It depends on outside pipe diameter

考题 单选题The term LEE SHORE refers to the().A shore on the lee side of the vesselB shore that is in the leeC western shore of the Lesser AntillesD shore in a harbor of refuge