网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
(),the cargo plan is not well done.
A
Frank speaked
B
Frankly to speak
C
Frankly spoken
D
Frankly speaking
参考答案
参考解析
解析:
暂无解析
更多 “单选题(),the cargo plan is not well done.A Frank speakedB Frankly to speakC Frankly spokenD Frankly speaking” 相关考题
考题
– What do you think of this business plan? -- _______________.A、Excuse me.B、I think it’s perfect.C、Very well.D、That’s fine.
考题
The tentative cargo plan ________ .A.eliminates confusion with the final stowage planB.shows the approximate amount of cargo to be loaded in each holdC.expedites the total operationD.requires an unproportional number of gang hours of work to discharge the cargo
考题
A Master would be well advised to file a note of protest if ______.A.Portions of his vessel’s cargo were illegally impoundedB.Longshore labor went on strike in a port causing undue vessel delayC.Cargo was received at ship side which was damaged in land transitD.The vessel encountered heavy weather which might have caused bottom damage
考题
The capacity of the segregated ballast tanks shall be ______ determined that the ship may operate safely on ballast voyages without recourse to the use of cargo tanks for water ballast except as provided otherwise.A.SuchB.AsC.SoD.Well
考题
Which statement is TRUE concerning deep well self-priming pumps ________.A.When loading oil cargo,it is always loaded via the discharge line through to the pump until the tank is topped offB.Stripping systems are generally eliminated for the purposes of cargo handlingC.In recent years deep well pumps have become increasingly unpopular in product tankers and medium size crude shipsD.There is no danger of damaging the pump from overheating
考题
To determine the weight capacity of a deck in a cargo hold,you would refer to the ______.A.Deadweight scaleB.Deck capacity planC.Cubic capacity tablesD.General arrangement plan
考题
Before loading bulk grain, bilge wells must be covered to ______.A.add strength to the bilge well strainerB.permit rapid flow of water to the bilge wellsC.prevent cargo sifting into the bilge wellsD.prevent oil, water, or other liquid from reaching the cargo
考题
Manifest and cargo plan are the two most important shipping papers required for ______.A.discharging planningB.safety inspectionC.entry reportD.provision order
考题
()is the process of identifying individual project risks as well as source of overall project risk,and documenting their characteristics.A.identify risks
B.monitor risks
C.implement risks responses
D.plan risk management
考题
Every week the magazine presents the profile of a well-known sports personality.A: successB: descriptionC: evidenceD: plan
考题
Examine the parameter for your database instance: You generated the execution plan for the following query in the plan table and noticed that the nested loop join was done. After actual execution of the query, you notice that the hash join was done in the execution plan: Identify the reason why the optimizer chose different execution plans.()A、The optimizer used a dynamic plan for the query.B、The optimizer chose different plans because automatic dynamic sampling was enabled.C、The optimizer used re-optimization cardinality feedback for the query.D、The optimizer chose different plan because extended statistics were created for the columns used.
考题
单选题The well preparation of stowage plan will().A
increase the ship's officers' knowledgeB
extend the ship's officers' knowledgeC
improve the ship's cargo-handling equipmentD
raise the working efficiency
考题
单选题Before loading bulk grain,bilge wells must be covered to().A
add strength to the bilge well strainerB
permit rapid flow of water to the bilge wellsC
prevent cargo sifting into the bilge wellsD
prevent oil,water,or other liquid from reaching the cargo
考题
单选题Making cargo plan for appropriate distribution of the cargo on board is()duty.A
a ship's officer'sB
a Tallyman'sC
a port planner'sD
a foreman's
考题
单选题The tentative cargo plan().A
eliminates confusion with the final stowage planB
shows the approximate amount of cargo to be loaded in each holdC
expedites the total operationD
requires an unproportional number of gang hours of work to discharge the cargo
考题
单选题()means a plan developed to ensure the application of measures designed to protect the port facility and ships, persons, cargo, cargo transport units and ships stores within the port facility from the risks of a security incident.A
Ship security planB
Company security planC
Port facility security planD
National security plan
考题
单选题()means a plan developed to ensure the application of measures on board the ship designed to protect persons on board, cargo, cargo transport units, ship’s stores or the ship from the risks of a security incident.A
Ship security planB
Company security planC
Port facility security planD
National security plan
考题
单选题Examine the parameter for your database instance: You generated the execution plan for the following query in the plan table and noticed that the nested loop join was done. After actual execution of the query, you notice that the hash join was done in the execution plan: Identify the reason why the optimizer chose different execution plans.()A
The optimizer used a dynamic plan for the query.B
The optimizer chose different plans because automatic dynamic sampling was enabled.C
The optimizer used re-optimization cardinality feedback for the query.D
The optimizer chose different plan because extended statistics were created for the columns used.
考题
单选题The document which acknowledges that the cargo has been received and is in the carrier’s custody is called the().A
Dock ReceiptB
Hatch Report and RecapitulationC
Cargo ManifestD
Stowage Plan
考题
单选题Why shiprepair is an inherently difficult business to manage in the conventional sense?()A
Because it is difficult to plan and manageB
Because it is cannot be well categorizedC
Because it is a difficult work for people to undergoD
Because it is seldom researched by research
考题
单选题Manifest and cargo plan are the two most important shipping papers required for().A
provision orderB
discharging planningC
annual repairD
outward clearance
考题
单选题I don’t doubt ______ the plan will be well-conceived.A
thatB
whetherC
whyD
when