A customer has two locations located 7 kilometers apart. The production site has a Cisco 9509chassis with 48 Fibre Channel ports activated, and the disaster recovery site has a Cisco 9509chassis with 48 Ethernet ports activated. Which of the following products will be used to get thedata from one location to the other?()
A
IBM SAN40-B4
B
Cisco MDS 9222i
C
Cisco MDS 9148
D
IBM SAN32B-E4 with encryption
参考答案
参考解析
解析:
暂无解析
更多 “单选题A customer has two locations located 7 kilometers apart. The production site has a Cisco 9509chassis with 48 Fibre Channel ports activated, and the disaster recovery site has a Cisco 9509chassis with 48 Ethernet ports activated. Which of the following products will be used to get thedata from one location to the other?()A IBM SAN40-B4B Cisco MDS 9222iC Cisco MDS 9148D IBM SAN32B-E4 with encryption” 相关考题
考题
A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A. operator trainingB. cache size of the two clustersC. fibre bandwidth capability between the sitesD. number of stacked tape drives attached to each cluster
考题
A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites.Which of the following solutions satisfies the customer‘s recovery time objective?()A. DS8700 systems at each site running Metro MirrorB. DS5300 systems at each site running Metro MirrorC. DS5100 systems at each site running Global MirrorD. XIV systems at each site running synchronous mirroring
考题
A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance.Which of the following products best accomplishes this task?()A. Global CopyB. Metro MirrorC. Global MirrorD. Metro/Global Mirror
考题
A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()A.VLANB.zoningC.trunkingD.LUN masking
考题
A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated. The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage. Each system has the following: ? 2 integrated network ports ? 2 fibre channel adapter cards ? 1 power supply and redundant cooling ? HACMP v5.1 In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()A、One fibre channel switchB、Two fibre channel switchesC、Two Ethernet cardsD、Nothing
考题
A customer has four AIX partitions that require a SAN. The disk subsystem must replicate to aremote site via an IP network. Each site has two Cisco MDS 9509 directors with fibre channel linecards. Which of the following must be added to each director to meet the IP requirement?()A、tri-rate SFPB、update to the latest Cisco IOSC、FCIP activation on the existing 16 FC line cardsD、Multiprotocol Services Module with FCIP activation
考题
A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()A、VLANB、zoningC、trunkingD、LUN masking
考题
A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A、operator trainingB、cache size of the two clustersC、fibre bandwidth capability between the sitesD、number of stacked tape drives attached to each cluster
考题
A customer has installed an IBM System Storage DS8700 with 20 TB of storage, two-way processor version, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues. To address this performance consideration with minimal cost to the customer, which of the following should be the FIRST step to resolve the problem()A、add an expansion frame with additionalFibre Channel portsB、increase the amount of storage by 20 TBC、conduct a Disk Magic study to identify the source of the performance issueD、add additionalFibre Channel ports to the existing DS8700
考题
A customer has two sites located 500 kilometers apart. The customer has both a high-speedInternet link and dark fiber between the sites. The customer wants to utilize storage resources ateither site leveraging replication for disaster recovery implementations. The customer wants to linkthese two sites together. Which option provides the highest performance and is most reliable?()A、iFCP routerB、FCIP routerC、DWDM and CWDMD、LC multi-mode 50 micron fiber
考题
A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site. Which IBM System Storage DS8000 solution should the storage specialist propose to the client()A、Metro/Global MirrorB、Metro MirrorC、Global CopyD、Global Mirror
考题
A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup. Which factor is a primary consideration when proposing a solution for this customer()A、compatibility of copy functionsB、difference in capacities in the two systemsC、cache size discrepancies between the two systemsD、the necessity of using two storage management products
考题
A customer has two locations located 7 kilometers apart. The production site has a Cisco 9509chassis with 48 Fibre Channel ports activated, and the disaster recovery site has a Cisco 9509chassis with 48 Ethernet ports activated. Which of the following products will be used to get thedata from one location to the other?()A、IBM SAN40-B4B、Cisco MDS 9222iC、Cisco MDS 9148D、IBM SAN32B-E4 with encryption
考题
A financial customer has three data centers that are four kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds. Which solution satisfies the customer’s recovery time objective()A、DS8700 systems at each site running Metro MirrorB、DS8700 systems at each site running Global MirrorC、DS5300 systems at each site running Global MirrorD、XIV systems at each site running Remote Mirroring
考题
A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance. Which of the following products best accomplishes this task?()A、Global CopyB、Metro MirrorC、Global MirrorD、Metro/Global Mirror
考题
A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites. Which of the following solutions satisfies the customer's recovery time objective?()A、DS8700 systems at each site running Metro MirrorB、DS5300 systems at each site running Metro MirrorC、DS5100 systems at each site running Global MirrorD、XIV systems at each site running synchronous mirroring
考题
单选题A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated. The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage. Each system has the following: ? 2 integrated network ports ? 2 fibre channel adapter cards ? 1 power supply and redundant cooling ? HACMP v5.1 In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()A
One fibre channel switchB
Two fibre channel switchesC
Two Ethernet cardsD
Nothing
考题
单选题A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites. Which of the following solutions satisfies the customer's recovery time objective?()A
DS8700 systems at each site running Metro MirrorB
DS5300 systems at each site running Metro MirrorC
DS5100 systems at each site running Global MirrorD
XIV systems at each site running synchronous mirroring
考题
单选题A customer has two locations located 7 kilometers apart. The production site has a Cisco 9509chassis with 48 Fibre Channel ports activated, and the disaster recovery site has a Cisco 9509chassis with 48 Ethernet ports activated. Which of the following products will be used to get thedata from one location to the other?()A
IBM SAN40-B4B
Cisco MDS 9222iC
Cisco MDS 9148D
IBM SAN32B-E4 with encryption
考题
单选题A financial customer has three data centers that are four kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds. Which solution satisfies the customer’s recovery time objective()A
DS8700 systems at each site running Metro MirrorB
DS8700 systems at each site running Global MirrorC
DS5300 systems at each site running Global MirrorD
XIV systems at each site running Remote Mirroring
考题
单选题A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site. Which IBM System Storage DS8000 solution should the storage specialist propose to the client()A
Metro/Global MirrorB
Metro MirrorC
Global CopyD
Global Mirror
考题
单选题A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A
operator trainingB
cache size of the two clustersC
fibre bandwidth capability between the sitesD
number of stacked tape drives attached to each cluster
考题
单选题A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance. Which of the following products best accomplishes this task?()A
Global CopyB
Metro MirrorC
Global MirrorD
Metro/Global Mirror
考题
单选题A customer has installed an IBM System Storage DS8700 with 20 TB of storage, two-way processor version, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues. To address this performance consideration with minimal cost to the customer, which of the following should be the FIRST step to resolve the problem()A
add an expansion frame with additionalFibre Channel portsB
increase the amount of storage by 20 TBC
conduct a Disk Magic study to identify the source of the performance issueD
add additionalFibre Channel ports to the existing DS8700
考题
单选题A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup. Which factor is a primary consideration when proposing a solution for this customer()A
compatibility of copy functionsB
difference in capacities in the two systemsC
cache size discrepancies between the two systemsD
the necessity of using two storage management products
考题
单选题A customer has four AIX partitions that require a SAN. The disk subsystem must replicate to aremote site via an IP network. Each site has two Cisco MDS 9509 directors with fibre channel linecards. Which of the following must be added to each director to meet the IP requirement?()A
tri-rate SFPB
update to the latest Cisco IOSC
FCIP activation on the existing 16 FC line cardsD
Multiprotocol Services Module with FCIP activation
考题
单选题A customer has two sites located 500 kilometers apart. The customer has both a high-speedInternet link and dark fiber between the sites. The customer wants to utilize storage resources ateither site leveraging replication for disaster recovery implementations. The customer wants to linkthese two sites together. Which option provides the highest performance and is most reliable?()A
iFCP routerB
FCIP routerC
DWDM and CWDMD
LC multi-mode 50 micron fiber
考题
单选题A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()A
VLANB
zoningC
trunkingD
LUN masking