单选题
A continual worsening of the list or trim indicates().
A

negative GM

B

propressive flooding

C

structural failure

D

an immediate need to ballast


参考答案

参考解析
解析: 暂无解析
更多 “单选题A continual worsening of the list or trim indicates().A negative GMB propressive floodingC structural failureD an immediate need to ballast” 相关考题
考题 Itisour______policythatwewillachieveunitythroughpeacefulmeans.A)consistentB)continuousC)considerateD)continual

考题 In the absence of external forces,adding weight on one side of a floating vessel causes the vessel to ().A.heel until the angle of loll is reachedB.list until the center of buoyancy is aligned vertically with the center of gravityC.trim to the side opposite TCG until all moments are equalD.decrease draft at the center of flotation

考题 Refer to the exhibits. Router B should advertise the network co nnected to the E0/0/0 interface to router A and block all other network advertisements. The IP routing table on router A indicates that it is not receiving this prefix from router B. What is the probable cause of the problem?()A. An access list on router B is causing the 192.168.3.16/28 network to be deniedB. An access list on router B is causing the 192.168.3.32/28 network to be deniedC. The distribute list on router B is referencing a numbered access list that does not exist on router BD. The d istribute list on router B is referencing the wrong interface

考题 A list signal of one white light indicates that the vessel is ______.A.on an even keelB.listing about 1° to the side the light is displayed onC.listing over 5°With the light displayed on the high sideD.listing,and the chutes should be directed to the side where the light is displayed

考题 A tow astern is veering from side to side on its towline.The best way of controlling the action is to ______.A.Trim the tow by the bowB.Trim the tow by the sternC.List the tow to windwardD.Adjust the length of the towing bridle

考题 For a vessel with longitudinal inclination, an increase in GML causes ______.A.list to stabilize at an angle of lollB.trim to stabilize at an angle of lollC.trim to increaseD.trim to decrease

考题 For a vessel with transverse inclination, an increase in GMT causes ______.A.list to stabilize at an angle of lollB.trim to decreaseC.list to increaseD.list to decrease

考题 If a vessel takes a sudden severe list or trim from an unknown cause, you should FIRST____.A.determine the cause before taking countermeasuresB.assume the shift is due to off-center loadingC.counterflood on the side opposite the list or trimD.assume the cause is environmental forces

考题 Most of the measures F.D.Roosevelt took in the first hundred days he was in the White House were to()Astop bank failuresBprevent radical actions in the United StatesCprevent the further worsening of the economic situation and lessen the personal sufferings of the peopleDprevent further worsening of the unstable political situation

考题 设a、b为字符型变量,与a-b等价的表达式是().A、trim(a)+b+space(len(a)-len(trim(a)))B、trim(a)=bC、a+bD、a*b

考题 单选题Your vessel was damaged and initially assumed a significant list and trim; however,further increase has been slow. Based on this data,what should you expect?()A The slowing is only temporary and the vessel will probably suddenly capsize or plunge from loss of stability due to change in the waterplane areaB The vessel can probably be saved if further flooding can be stoppedC The vessel will continue to slowly list and/or trim due to the free surface effect and free communication effectD The vessel will suddenly flop to the same or greater angle of list on the other side and may capsize

考题 单选题Which will most likely occur when entering shallow water? ()A Rudder action will become more effectiveB The vessel's list will changeC The vessel's trim will changeD An increase in speed will occur

考题 单选题The TPC curve,one of the hydrostatic curves in a vessel’s plans,gives the number of tons().A necessary to change the angle of list 1°at a given draftB necessary to change trim 1 cm at a given draftC pressure per square cm on the vessel's hull at a given draftD necessary to further immerse the vessel 1 cm at a given draft

考题 单选题Your vessel is damaged with no list,but down by the stern. There is progressive flooding and trim by the stern is increasing. What is the effect on transverse stability after the deck edge at the stern is submerged?()A KB increases,increasing BM and therefore GMB KG increases due to the weight of the added water on deckC BM decreases from loss of water plane and greater volumeD There is no effect on transverse stability

考题 单选题Progressive flooding may be indicated by().A ballast control alarmsB excessive draftC excessive list or trimD a continual worsening of list or trim

考题 单选题A continual worsening of the list or trim of any floating ship indicates().A negative GMB progressive floodingC structural failureD an immediate need to counterflood

考题 单选题If the cause of a sudden severe list or trim is negative initial stability,counter flooding into empty tanks may().A increase the righting momentB cause an increase in the righting armC bring the unit to an upright equilibrium positionD cause the unit to flop to a greater angle

考题 单选题While loading cargo,a white trimming light on the starboard side comes on. This indicates that().A the vessel has a list of about 1` to starboardB the chutes should be directed to the starboard sideC the chutes in No. 1 hold should be directed to the starboard sideD a severe list to starboard has developed and all loading should cease

考题 单选题Most of the measures F.D.Roosevelt took in the first hundred days he was in the White House were to()A stop bank failuresB prevent radical actions in the United StatesC prevent the further worsening of the economic situation and lessen the personal sufferings of the peopleD prevent further worsening of the unstable political situation

考题 单选题A continual worsening of the list or trim indicates().A negative GMB propressive floodingC structural failureD an immediate need to ballast

考题 单选题What is NOT a problem area when loading barges on a LASH type vessel? ()A Frequent stability calculations requiredB Thorough pre-planning requiredC Limiting depths alongside berths restrict barge draftsD Minimum trim and 0°list are required for optimum operations

考题 单选题A list signal of one white light indicates that the vessel is ().A on an even keelB listing about 1° to the side the light is displayed onC listing over 5° With the light displayed on the high sideD listing,and the chutes should be directed to the side where the light is displayed

考题 单选题What is MTI?().A The foot/tons needed to trim the vessel by 1 inchB The foot/tons needed to trim the vessel by 1 footC The moments needed to trim the vessel by 1 centimeterD The amount of vessel will trim when loading 100 tons 100 feet from the tipping Center

考题 单选题If a vessel takes a sudden,severe list or trim from an unknown cause,you should FIRST().A determine the cause before taking countermeasuresB assume the shift is due to off-center loadingC counterfloodD assume the cause is environmental forces

考题 单选题During counterflooding to correct a severe list aggravated by an off-center load,your vessel suddenly takes a list or trim to the opposite side. You should().A continue counterflooding in the same directionB continue counterflooding,but in the opposite directionC immediately stop counterfloodingD deballast from the low side

考题 单选题If the cause of severe list or trim is off-center ballast,counterflooding into empty tanks will().A increase the righting momentB increase the righting armC increase list or trimD decrease list or trim

考题 单选题During counterflooding to correct a severe list or trim aggravated by an off-center load,a ship suddenly takes a list or trim to the opposite side. You should().A continue counterflooding in the same directionB continue counterflooding,but in the opposite directionC immediately stop counterfloodingD deballast from the low side

考题 单选题If a vessel takes a sudden severe list or trim from an unknown cause, you should first().A determine the cause before taking countermeasuresB assume the shift is due to off-center loadingC counterflood on the side opposite the list or trimD assume the cause is environment forces