网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A towboat has the same draft as the barges it is pushing ahead. If the distance from the stern of the towboat to the head of the tow is 260m,where is the approximate location of the pivot point of the unit?()
A

At the head of the tow

B

75m from the head of the tow

C

120m from the head of the tow

D

180m from the head of the tow


参考答案

参考解析
解析: 暂无解析
更多 “单选题A towboat has the same draft as the barges it is pushing ahead. If the distance from the stern of the towboat to the head of the tow is 260m,where is the approximate location of the pivot point of the unit?()A At the head of the towB 75m from the head of the towC 120m from the head of the towD 180m from the head of the tow” 相关考题
考题 The purchaser of a draft/documents presented under a straight documentary credit only has the right ______.A.to protest the issuing bankB.to present the drafts/documents on behalf of the beneficiaryC.to purchase the beneficiary's drafts/documentsD.to present the draft/documents by himself

考题 听力原文:M: Good morning! This is a demand draft for one thousand American dollars. May I have it discounted here?W: Sorry, immediate encashment of a foreign bill is not allowed. You may entrust it to us for collection. But it takes time.Q: What should the man do if he wants to get the payment of the draft?(18)A.He has to show the clerk his passport.B.He has to entrust the draft for collection to the bank.C.He has to fill in some forms.D.He has to endorse the draft.

考题 听力原文:If a customer informs his bank that a draft which has been issued to him has been lost, the drawee bank should be noticed immediately.(8)A.The customer should first notify the drawee bank of the loss of his draft.B.The customer should first notify the drawer bank of the loss of his draft.C.The customer should first notify the remitting bank of the loss of his draft.D.The customer should first notify the collecting bank of the loss of his draft.

考题 By the time Robert()writing the first draft of his paper, most of the other students will be completing their final draft.A、finishesB、has finishedC、finishedD、finishing

考题 As operator of a 199 GT towing vessel sailing foreign,it shall be your duty to enter in the Official Logbook or other permanent record ______.A.all information contained on the barge's Certificate of InspectionB.the condition of all towing gear to be usedC.all navigational aids to be usedD.the barges load line and draft readings

考题 A tow of 9 barges is made up three abreast by three long. The towboat is faced up to the last barge of the center string. The outer two strings of barges are the ______.A.port and starboard stringsB.outer stringsC.drag stringsD.side strings

考题 You are pushing a tow ahead,at high speed,near the right hand bank of a canal.The forces affecting your towboat and tow will tend to ______.A.Push both the head of the tow and the stern of the towboat away from the right hand bankB.Push the head of the tow away from,and pull the stern of the towboat into,the right hand bankC.Pull both the head of the tow and the stern of the towboat into the right hand bankD.Pull the head of the tow into,and push the stern of the towboat away from,the right hand bank

考题 When attempting an upstream landing while pushing empty barges ahead in a hard onshore wind,the approach is best made ______.A.With bow out,stern inB.With bow in,stern outC.Parallel to the dock,as close in as possibleD.Parallel to the dock,as far out as possible

考题 Regulations require that cargo tanks carrying grades D or E liquids on tank barges be vented with ______.A.Gooseneck vents and flame screensB.Pressure-vacuum relief valvesC.Branch vent lines and a vent headerD.Forced draft blowers

考题 单选题A towing vessel 30 meters in length is pushing barges ahead. How many white masthead lights is the vessel REQUIRED to show at night?()A OneB TwoC ThreeD Four

考题 单选题Keeping the draft at or below the load line mark will insure that the vessel has adequate().A ballastB reserve buoyancyC displacementD rolling periods

考题 单选题The ship has()of more than 10 meters at full load.A an engineB an overall lengthC a displacementD a draft

考题 单选题A tow of 9 barges is made up three abreast by three long. The towboat is faced up to the last barge of the center string. The outer two strings of barges are the().A port and starboard stringsB outer stringsC drag stringsD side strings

考题 单选题When pushing ahead,wires leading from the quarters of the after outboard barges to the bow of a towboat().A prevent the towboat from sliding when the rudder is movedB prevent the barges from spreading out when backing downC hold the towboat securely to the bargesD prevent the sidewise movement of the face barges

考题 单选题The Vessel Bridge-to-Bridge Radiotelephone Act applies to which towboat?()A A 100 GT towboat,24 feet in lengthB A 90-foot towboat tied to the pierC A 60-foot towboat towing by pushing aheadD A 400 GT towboat anchored

考题 单选题What doesn’t the old tree tell us?A He’s afraid to be cut down somedayB He has fewer and fewer friendsC The trees have the longest lives in the worldD He has lived for thousands of years

考题 单选题Regulations require that cargo tanks carrying grades D or E liquids on tank barges be vented with().A gooseneck vents and flame screensB pressure-vacuum relief valvesC branch vent lines and a vent headerD forced draft blowers

考题 单选题A tow of 9 barges is made up three abreast and three long. The towboat is faced up to the center string which is known as the().A main stringB push stringC power stringD face string

考题 单选题A towboat is pushing barges ahead at a dangerously fast speed when().A the towboat vibrates when backing downB the roostertail exceeds the height of the main deckC a strain is placed on the face wiresD water comes over the foredeck of the lead barges

考题 单选题Due to the shape of the(),whereby forward- and aft ship are differently shaped,a trim correction on the draft measurement has to be done.A spheroidB loxodromeC careneD sphere

考题 单选题Not a single mistake ______ in the test.A he madeB did he makeC he has madeD made he

考题 单选题When attempting an upstream landing while pushing empty barges ahead in a hard onshore wind,the approach is best made().A with bow out,stern inB with bow in,stern outC parallel to the dock,as close in as possibleD parallel to the dock,as far out as possible

考题 单选题A face line is used to().A prevent barge movement in a lockB secure two barges end-to-endC secure barges to the towboatD secure barges side-by-side

考题 单选题_____A He has changed his plan.B He has canceled his trip.C He is arriving this afternoon.D He forgot to arrange his trip.

考题 单选题The energy for pushing this piston up can be supplied from (), so that the piston can keep moving up and down.A the same pistonB the piston nearbyC the other pistonsD the generators on board

考题 单选题In a storm,the leeward lines of a ship’s mooring system will().A pull the unit in the same direction that the weather is pushing itB pull the unit in the opposite direction that the weather is pushing itC tend to keep the unit on its original location over the well headD affect the unit's draft and inclination as maximum mooring tensions are reached

考题 单选题As operator of a 199 GT towing vessel sailing foreign,it shall be your duty to enter in the Official Logbook or other permanent record().A all information contained on the barge's Certificate of InspectionB the condition of all towing gear to be usedC all navigational aids to be usedD the barges load line and draft readings