An administrator is configuring an LPAR for a NIM installation and is unsure if the 'Ping Test' option within SMS is a required configuration step. Which statement best describes the 'Ping Test' option?()
A

The 'Ping Test' is a recommended step to verify the IP information entered into the RIPL SMS panel.

B

The 'Ping Test' is a mandatory step required to commit the IP information entered into the RIPL SMS panel.

C

The 'Ping Test' is an optional step to verify network configuration entered into the RIPL SMS panel on older copper-based networks.

D

The 'Ping Test' is an optional step to verify network connectivity between client and server, where ICMP traffic is allowed on the connecting network.


参考答案

参考解析
解析: 暂无解析
更多 “单选题An administrator is configuring an LPAR for a NIM installation and is unsure if the 'Ping Test' option within SMS is a required configuration step. Which statement best describes the 'Ping Test' option?()A The 'Ping Test' is a recommended step to verify the IP information entered into the RIPL SMS panel.B The 'Ping Test' is a mandatory step required to commit the IP information entered into the RIPL SMS panel.C The 'Ping Test' is an optional step to verify network configuration entered into the RIPL SMS panel on older copper-based networks.D The 'Ping Test' is an optional step to verify network connectivity between client and server, where ICMP traffic is allowed on the connecting network.” 相关考题
考题 An administrator is creating a new LPAR with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool.  Which weight should be assigned to this LPAR?()A、 0B、 1C、 255D、 256

考题 An administrator has implemented the following LPARs on a Power 570 with 32 GB memory with 512 MB remaining for allocation: LPAR 1 memory : min = 10 GB des = 15 GB max = 24 GB  LPAR 2memory : min = 10 GB des = 15 GB max = 24 GB The administrator receives a request to add 2 GB to LPAR 1. The only way to do this is by moving memory from LPAR 2 to LPAR 1. The administrator attempts to move the memory, but the operation fails. The administrator can  however allocate 512 MB that is free to LPAR 1 on the 570.  What is the most likely cause of this failure when dynamically moving memory?()A、 Maxperm% is set too low on LPAR 2B、 Insufficient paging space on LPAR 1C、 Service IBM.DRM is unavailable on LPAR 1D、 Insufficient pinnable memory frames available on LPAR 2

考题 A system administrator has been instructed to attach storage in their client LPARs, in a Power 770, with fibre channel adapters using N_port ID virtualization (NPIV). Which of the following partitions has the minimum requirements to utilize virtual fibre channel?()A、LPAR-A with 1Gb FC HBA and SAN connectionB、LPAR-B with 2Gb FC HBA and SAN connectionC、LPAR-C with 4Gb FC HBA and SAN connectionD、LPAR-D with 8Gb FC HBA and SAN connection

考题 An administrator is configuring an LPAR for a NIM installation and is unsure if the 'Ping Test' option within SMS is a required configuration step. Which statement best describes the 'Ping Test' option?()A、The 'Ping Test' is a recommended step to verify the IP information entered into the RIPL SMS panel.B、The 'Ping Test' is a mandatory step required to commit the IP information entered into the RIPL SMS panel.C、The 'Ping Test' is an optional step to verify network configuration entered into the RIPL SMS panel on older copper-based networks.D、The 'Ping Test' is an optional step to verify network connectivity between client and server, where ICMP traffic is allowed on the connecting network.

考题 Which command should the administrator use to display the IPL progress/LED code of the partition?()A、lsled -m System -r lpar B、lsrefcode -m System -r lpar C、lshwinfo -m System -r led_code D、lssyscfg -m System -r sys -F lpar_name,led_code

考题 An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A、LPAR Planning Tool.B、System Planning Tool.C、LPAR Validation Tool.D、System Validation Tool.

考题 A customer is in the process of testing their configuration prior to going live. The administrator discovers thatPowerHA is taking 31 seconds to deal with a standard NIC failure. What can the administrator do to speed upthe process of NIC failure detection and diagnosis?()A、Tune the topsvcs NIM settingsB、Tune the grpsvcs NIM settingsC、Activate the fast failure detection (FFD) featureD、Activate the Gigabit fast failover feature on the physical adapters

考题 An administrator is creating a new logical partition (LPAR) with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool. Which weight should be assigned to this LPAR?()A、 0B、 1C、 255D、 256

考题 An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A、LPAR Planning Tool.B、System Planning Tool.C、LPAR Validation Tool.D、System Validation Tool.

考题 For NIM to install client machines located in a non-adjacent network, which routing must be defined?()  A、Boot/install servers will be required on each intermediate network.B、When an install is initiated by the client, routing is only required from the LPAR back to the NIM master.C、When an install is initiated by the NIM master, routing is only required from the NIM master to the client.D、Appropriate network NIM resources need to be defined to the NIM master to allow routing in both directions.

考题 What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX6.1()? A、128 MBB、256 MBC、512 MBD、1024 MB

考题 An administrator is configuring a PowerHA cluster consisting of two nodes across two physical Power systems,570-1 and 570-2. Node1 is an LPAR on 570-1Node2 is an LPAR on 570-2. Dev1 is an LPAR on 570-2 (this LPAR is not part of the cluster). The cluster will manage a single resource group, RG1, with a single application server, APP1. The resourcegroup will have a home node of Node1. Node1 is configured with 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processorsNode2 isconfigured with 0.4 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors Dev1 is configuredwith 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors When the resource group RG1 is acquired by Node2 the administrator would like to dynamically move 3.6processor entitlement units from Dev1 to Node2. How could the administrator achieve this in the PowerHAcluster?()A、Create a custom event script to perform the change to CPU entitlementB、Modify the extended performance tuning parameters for the cluster to modify CPU entitlement uponresource group acquisitionC、Customize the resource group attributes of RG1 so that the CPU entitlement is modified for Node2 uponresource group acquisitionD、Customize the application server attributes of APP1 so that the CPU entitlement is modified for Node2upon resource group acquisition

考题 After making changes to the profile for an LPAR, the administrator asks the operator to bring the LPAR back up into a running state with the new changes. Which of the following is the correct way to do this?()A、Shutdown and activate the partition profileB、Reboot the partition using the reboot commandC、Reboot the partition using the 'shutdown -r' commandD、Right click on the partition profile and select the 'apply changes' option

考题 An administrator has installed 1 VIO Server and 5 client LPARs on a 16-core Power 570 with the following CPU requirements: Virtual Processors Processing Units Min Desired Max Min Desired Max VIOS1 1 2 4 0.1 1.0 2.0 LPAR1 4 4 4 4.0 4.0 4.0 LPAR2 2 5 8 1.0 5.0 6.0 LPAR3 1 3 4 0.1 0.3 1.0 LPAR4 3 6 9 0.5 3.0 6.0 LPAR5 1 3 6 1.0 3.0 .06 If the administrator activates the LPARs in the above order,  what will be the result? ()A、 All LPARs will start except LPAR5.B、 All LPARs will start with desired capacity.C、 All LPARs will start but LPAR5 will have its minimum capacity assigned.D、 All LPARs will start but LPAR5 will have less than its desired capacity.

考题 An administrator is installing AIX. The SMS panel lists the following network adapter:  NIC Adapters DeviceLocation CodeHardware. 1.Interpartition Logical LANU9123.710.1008B1A-V4-C2-T15e5a00004002. The NIM server is running in another LPAR on the same managed system. What speed and duplex should be configured on this adapter?()A、100/FullB、1000/HalfC、1000/AutoD、Auto/Auto

考题 多选题When configuring a DHCP server, which of the following can the administrator define for DHCPusers?()ADatabase serverBNTP serverCDHCP serverDSQL serverEDNS serverFDomain name

考题 单选题An administrator has implemented the following LPARs on a Power 570 with 32 GB memory with 512 MB remaining for allocation: LPAR 1 memory : min = 10 GB des = 15 GB max = 24 GB  LPAR 2memory : min = 10 GB des = 15 GB max = 24 GB The administrator receives a request to add 2 GB to LPAR 1. The only way to do this is by moving memory from LPAR 2 to LPAR 1. The administrator attempts to move the memory, but the operation fails. The administrator can  however allocate 512 MB that is free to LPAR 1 on the 570.  What is the most likely cause of this failure when dynamically moving memory?()A  Maxperm% is set too low on LPAR 2B  Insufficient paging space on LPAR 1C  Service IBM.DRM is unavailable on LPAR 1D  Insufficient pinnable memory frames available on LPAR 2

考题 单选题An administrator is creating a new LPAR with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool.  Which weight should be assigned to this LPAR?()A  0B  1C  255D  256

考题 单选题What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX6.1?()A 128MBB 256MBC 512MBD 1024MB

考题 单选题What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX 6.1?()A 128MB 256MC 512MD 1024M

考题 单选题A system administrator is creating four LPARs on a Power 550. The Power 550 has 64GB of memoryinstalled and 32GB activated. The system administrator sets the minimum dedicated memory to 8GB in the profile for each LPAR. After activating three LPARs, he is not able to activate the fourth LPAR. What is the likely cause of the problem?()A The Power 550 is licensed for three LPARs only.B There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. A faulty memory DIMM is detected in the POWER5 550.C There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The HMC reserves some memory toperform logical partition tasks.D There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The hypervisor reserves some memory to perform logical partition tasks.

考题 单选题While attempting to load a base operating system to a machine, an administrator is receiving bootp timeout error messages. What steps should be followed to troubleshoot communications between the NIM master and the client machine?()A View debug logs on NIM master for errors or failures.B Boot the client machine to SMS, and view the POST Error log.C Boot the client machine to SMS, setup remote IPL, and execute a ping test.D Boot the client machine to diagnostics, and ping the client from the NIM master.

考题 单选题An administrator is creating a new logical partition (LPAR) with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool. Which weight should be assigned to this LPAR?()A  0B  1C  255D  256

考题 单选题An administrator is installing AIX. The SMS panel lists the following network adapter:NIC Adapters DeviceLocation CodeHardware 1.Interpartition Logical LANU9123.710.1008B1A-V4-C2-T15e5a00004002The NIM server is running in another LPAR on the same managed system. What speed and duplex should be configured on this adapter?()A 100/FullB 1000/HalfC 1000/AutoD Auto/Auto

考题 单选题What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX6.1()?A 128 MBB 256 MBC 512 MBD 1024 MB

考题 单选题An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A LPAR Planning Tool.B System Planning Tool.C LPAR Validation Tool.D System Validation Tool.