网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

供水性 water supplying capability


参考答案

更多 “供水性 water supplying capability” 相关考题
考题 WhichoneisNOTincludedinnursingjobsforpatients’health?() A.Supplying3mealsB.GivingmedicationsC.MouthtoiletD.X-raycheck

考题 Which of the following factors tends to increase scale formation on the saltwater side of a heat exchanger used in a diesel engine cooling water system?A.Baffle plates that have been bent during prior removalB.Leaks m the cooler tube nestC.Operating the engine while maintaining a high sea water outlet temperatureD.A punctured sea water strainer supplying cooling water to the heat exchanger

考题 The visitors are impressed by the hospitality of the local people.A.friendlinessB.banquetC.presentD.capability

考题 The most serious effect of air trapped in a diesel engine jacket water cooling system is that it ______.A.Causes colloid suspension in the cooling waterB.Reduces the capability of the lubrication systemC.Can form pockets which block the flow of coolant through the systemD.Leads to the scuffing of cylinder walls

考题 A fire hose with a nozzle attached must be connected to each hydrant except when exposed to heavy weather or when the ______.A.Fire hose might be damaged by cargo operationsB.Vessel is in portC.Fire-main system is not chargedD.Fire pumps are used for purposes other than supplying water to the fire main

考题 用户变更是指供水公司与用户在签订()履约过程中,或虽未与用户签订合同,但已经发生的供用水关系中,因用水一方的名称、用水性质、用户水表、销户等原因导致的供用水关系具体内容发生了变更。A、《用水性质变更申请表》B、《供用水合同》C、《新增用户申请表》D、《用水性质变更审批表》

考题 CID是()的缩写。A、Capability IED DescriptionB、Current IED DescriptionC、Capability Intelligen tDeviceD、configured IED Description

考题 ICD是()的缩写。A、lED Capability DescriptionB、IED Current DescriptionC、Intelligent Capability DeviceD、IED Capability Device

考题 单选题Which of the following factors tends to increase scale formation on the saltwater side of a heat exchanger used in a diesel engine cooling water system?()A Baffle plates that have been bent during prior removalB Leaks in the cooler tube nestC Operating the engine while maintaining a high sea water outlet temperatureD A punctured sea water strainer supplying cooling water to the heat exchanger

考题 单选题Which option best describes the features of the Personal Worklist page, as compared with AdvancedWorklist?()A provides an overview of notificationsB provides the capability to administer notificationsC provides the most detailed options for searching workflowD provides the most detailed options for searching workflow, and provides the capability to administer notifications

考题 单选题Why the cooling water of the diesel engine should be treated? Because the()A Cooling water is alkalescenceB cooling water is acidityC cooling water has salinityD cooling water has impurity

考题 单选题The straight stream capability of an all-purpose nozzle is used in fighting a class A fire to().A shield fire fighters from radiant heatB break up burning materialC get the most water possible on the fireD drive heat and smoke ahead of the fire fighters

考题 单选题用户变更是指供水公司与用户在签订()履约过程中,或虽未与用户签订合同,但已经发生的供用水关系中,因用水一方的名称、用水性质、用户水表、销户等原因导致的供用水关系具体内容发生了变更。A 《用水性质变更申请表》B 《供用水合同》C 《新增用户申请表》D 《用水性质变更审批表》

考题 单选题The most serious effect of air trapped in a diesel engine jacket water cooling system is that it().A causes colloid suspension in the cooling waterB reduces the capability of the lubrication systemC can form pockets which block the flow of coolant through the systemD leads to the scuffing of cylinder walls

考题 单选题()belongs to emergency power supplying equipments.A Navigation lampB WindlassC Main sea water pumpD Compressor

考题 单选题Supposing there is a water container. The taller the container, _____at the bottom.A greater will the water pressure beB the water pressure will be greaterC the greater will be the water pressureD greater the water pressure will be

考题 单选题Which of the following statements is correct concerning diesel engine cooling water systems?()A Each engine must have its own engine driven cooling water pump capable of providing cooling for all ranges of operationB propulsion engines with bores exceeding 200 mm are to be fitted with a means to display the cooling water temperature of each cylinderC At least two independent sea suctions are to be provided for supplying water to the engine jackets or to the heat exchangersD Suitable strain are to be fitted between the circulating pumps and heat exchangers when sea water is used for direct cooling

考题 单选题()belongs to emergency power supplying equipments.A Emergency fire pumpB WindlassC Main sea water pumpD Fresh water pump

考题 单选题A () boiler is an auxiliary boiler sometimes included in a steamships installation for supplying steam to auxiliaries in port.A monkeyB donkeyC waste heatD main

考题 单选题When sailing in cold zones, the() should be drained of water.A the ventilation pipeB the water line for fire fighting on the deckC the fuel oil lineD the water supplying line in bath room

考题 单选题A fire hose with a nozzle attached must be connected to each hydrant except when exposed to heavy weather or when the().A fire hose might be damaged by cargo operationsB vessel is in portC fire-main system is not chargedD fire pumps are used for purposes other than supplying water to the fire main

考题 单选题Diesel engine automated control systems may utilize sensing devices of dual function, with sensing ranges providing both alarm and engine shut down capability.Which of the key points would only require an alarm sensor?()A Lube oil pressure and temperatureB jacket water pressure and temperatureC Engine over-speedD Lube oil sump level

考题 单选题The deep-sea listening system makes use of ______.A the sophisticated technology of focusing sounds under waterB the capability of sound to travel at high speedC the unique property of layers of ocean water in transmitting soundD low-frequency sounds traveling across different layers of water

考题 单选题()belongs to emergency power supplying equipments.A argo winchB WindlassC Steering gearD Air compressor

考题 单选题Diesel engines are started by supplying () into the cylinders in the appropriate sequence for the required direction.A fuel oilB diesel oilC compressed airD jacket water

考题 单选题When the incinerator is stopped, which of the following is wrong?()A After stopping supplying sludge oil, the value and pipe should be flushed by flushed by diesel oil and the incinerator continue burning for 10 minutesB Close auxiliary burner firstly and then close main burnerC After stopping fuel, restoring the position of main fuel supply valveD Stop blower as soon as stopping supplying fuel oil

考题 名词解释题供水性 water supplying capability