网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
供水性 water supplying capability
参考答案
更多 “供水性 water supplying capability” 相关考题
考题
WhichoneisNOTincludedinnursingjobsforpatients’health?()
A.Supplying3mealsB.GivingmedicationsC.MouthtoiletD.X-raycheck
考题
Which of the following factors tends to increase scale formation on the saltwater side of a heat exchanger used in a diesel engine cooling water system?A.Baffle plates that have been bent during prior removalB.Leaks m the cooler tube nestC.Operating the engine while maintaining a high sea water outlet temperatureD.A punctured sea water strainer supplying cooling water to the heat exchanger
考题
The visitors are impressed by the hospitality of the local people.A.friendlinessB.banquetC.presentD.capability
考题
The most serious effect of air trapped in a diesel engine jacket water cooling system is that it ______.A.Causes colloid suspension in the cooling waterB.Reduces the capability of the lubrication systemC.Can form pockets which block the flow of coolant through the systemD.Leads to the scuffing of cylinder walls
考题
A fire hose with a nozzle attached must be connected to each hydrant except when exposed to heavy weather or when the ______.A.Fire hose might be damaged by cargo operationsB.Vessel is in portC.Fire-main system is not chargedD.Fire pumps are used for purposes other than supplying water to the fire main
考题
用户变更是指供水公司与用户在签订()履约过程中,或虽未与用户签订合同,但已经发生的供用水关系中,因用水一方的名称、用水性质、用户水表、销户等原因导致的供用水关系具体内容发生了变更。A、《用水性质变更申请表》B、《供用水合同》C、《新增用户申请表》D、《用水性质变更审批表》
考题
CID是()的缩写。A、Capability IED DescriptionB、Current IED DescriptionC、Capability Intelligen tDeviceD、configured IED Description
考题
ICD是()的缩写。A、lED Capability DescriptionB、IED Current DescriptionC、Intelligent Capability DeviceD、IED Capability Device
考题
单选题Which of the following factors tends to increase scale formation on the saltwater side of a heat exchanger used in a diesel engine cooling water system?()A
Baffle plates that have been bent during prior removalB
Leaks in the cooler tube nestC
Operating the engine while maintaining a high sea water outlet temperatureD
A punctured sea water strainer supplying cooling water to the heat exchanger
考题
单选题Which option best describes the features of the Personal Worklist page, as compared with AdvancedWorklist?()A
provides an overview of notificationsB
provides the capability to administer notificationsC
provides the most detailed options for searching workflowD
provides the most detailed options for searching workflow, and provides the capability to administer notifications
考题
单选题Why the cooling water of the diesel engine should be treated? Because the()A
Cooling water is alkalescenceB
cooling water is acidityC
cooling water has salinityD
cooling water has impurity
考题
单选题The straight stream capability of an all-purpose nozzle is used in fighting a class A fire to().A
shield fire fighters from radiant heatB
break up burning materialC
get the most water possible on the fireD
drive heat and smoke ahead of the fire fighters
考题
单选题用户变更是指供水公司与用户在签订()履约过程中,或虽未与用户签订合同,但已经发生的供用水关系中,因用水一方的名称、用水性质、用户水表、销户等原因导致的供用水关系具体内容发生了变更。A
《用水性质变更申请表》B
《供用水合同》C
《新增用户申请表》D
《用水性质变更审批表》
考题
单选题The most serious effect of air trapped in a diesel engine jacket water cooling system is that it().A
causes colloid suspension in the cooling waterB
reduces the capability of the lubrication systemC
can form pockets which block the flow of coolant through the systemD
leads to the scuffing of cylinder walls
考题
单选题()belongs to emergency power supplying equipments.A
Navigation lampB
WindlassC
Main sea water pumpD
Compressor
考题
单选题Supposing there is a water container. The taller the container, _____at the bottom.A
greater will the water pressure beB
the water pressure will be greaterC
the greater will be the water pressureD
greater the water pressure will be
考题
单选题Which of the following statements is correct concerning diesel engine cooling water systems?()A
Each engine must have its own engine driven cooling water pump capable of providing cooling for all ranges of operationB
propulsion engines with bores exceeding 200 mm are to be fitted with a means to display the cooling water temperature of each cylinderC
At least two independent sea suctions are to be provided for supplying water to the engine jackets or to the heat exchangersD
Suitable strain are to be fitted between the circulating pumps and heat exchangers when sea water is used for direct cooling
考题
单选题()belongs to emergency power supplying equipments.A
Emergency fire pumpB
WindlassC
Main sea water pumpD
Fresh water pump
考题
单选题A () boiler is an auxiliary boiler sometimes included in a steamships installation for supplying steam to auxiliaries in port.A
monkeyB
donkeyC
waste heatD
main
考题
单选题When sailing in cold zones, the() should be drained of water.A
the ventilation pipeB
the water line for fire fighting on the deckC
the fuel oil lineD
the water supplying line in bath room
考题
单选题A fire hose with a nozzle attached must be connected to each hydrant except when exposed to heavy weather or when the().A
fire hose might be damaged by cargo operationsB
vessel is in portC
fire-main system is not chargedD
fire pumps are used for purposes other than supplying water to the fire main
考题
单选题Diesel engine automated control systems may utilize sensing devices of dual function, with sensing ranges providing both alarm and engine shut down capability.Which of the key points would only require an alarm sensor?()A
Lube oil pressure and temperatureB
jacket water pressure and temperatureC
Engine over-speedD
Lube oil sump level
考题
单选题The deep-sea listening system makes use of ______.A
the sophisticated technology of focusing sounds under waterB
the capability of sound to travel at high speedC
the unique property of layers of ocean water in transmitting soundD
low-frequency sounds traveling across different layers of water
考题
单选题()belongs to emergency power supplying equipments.A
argo winchB
WindlassC
Steering gearD
Air compressor
考题
单选题Diesel engines are started by supplying () into the cylinders in the appropriate sequence for the required direction.A
fuel oilB
diesel oilC
compressed airD
jacket water
考题
单选题When the incinerator is stopped, which of the following is wrong?()A
After stopping supplying sludge oil, the value and pipe should be flushed by flushed by diesel oil and the incinerator continue burning for 10 minutesB
Close auxiliary burner firstly and then close main burnerC
After stopping fuel, restoring the position of main fuel supply valveD
Stop blower as soon as stopping supplying fuel oil
考题
名词解释题供水性 water supplying capability
热门标签
最新试卷