网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The safety valves should be tested and adjusted when the boiler survey is ()
A

completed

B

carried out

C

cleaned

D

steamed


参考答案

参考解析
解析: 暂无解析
更多 “单选题The safety valves should be tested and adjusted when the boiler survey is ()A completedB carried outC cleanedD steamed” 相关考题
考题 The law requires all cars () for safety and efficiency. A.being tested regularlyB.to be regularly testedC.be regularly testedD.regularly tested

考题 When a process is in control, what do you want to do with the process?().A.The process should not be adjustedB.The process may be adjusted for continuous improvementC.The process should be always adjusted for continuous qualityD.The process should be regularly adjusted

考题 How should cargo tank hatches be protected when the ullage opening is open and the tank NOT gas free?A.With gooseneck ventsB.With warning signsC.With flame screensD.With pressure-vacuum relief valves

考题 For safety reasons,when assistance towing ______.A.the disabled vessel should be towed to the nearest portB.the disabled vessel should be inspected for flammable gasesC.passengers should always be removed from the disabled vesselD.personnel on the disabled vessel should don PFD's

考题 ()do you want the derrick adjusted?A、WhatB、WhereC、HowD、When

考题 Which of the following safety procedures is the BEST when lifting heavy equipment onto a repairbench?()A、The technician should always bend at the waist and lift with their arms.B、The technician should seek assistance from an available customer.C、The technician should always bend at the waist and lift with their back.D、The technician should get assistance from another technician.

考题 Which of the following multimeter settings should only be used when there is no electrical flow through the part being tested? ()(Select TWO).A、AmpereB、ContinuityC、VoltD、ResistanceE、Wattage

考题 单选题To avoid excessive surge pressure when bunkering, you should ()A bunker at a normal rateB check for kinks in hoseC close valves slowlyD shut valves before topping off

考题 单选题The safety valves should be tested and adjusted when the boiler survey is ()A completedB carried outC cleanedD steamed

考题 单选题The safety valves are mounted in pairs to () the boiler against overpressure.A useB releaseC protectD effect

考题 单选题If a hydraulic governor has been refilled with oil, the engine should be operated until it reaches normal temperaturethen the air should be purged, and the()A rack position should be adjustedB compensating needle valve should be opened fully compensatingC needle valve should be adjusted to stabilize operationD speed limiting device should be adjusted

考题 单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()A The safety valve escape piping should be disconnected from the valve body and a blank insertedB The boiler vent valves should be openedC All hand-hole/manhole covers should be tightened up as much as possible to preclude any leaksD All of the above

考题 单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()A The safety valve escape piping should be disconnected from the valve body and a blank insertedB The boiler vent valves should be openedC All handhole/manhole covers should be tightened up as much as possible to preclude any leaksD All of the above

考题 单选题When the renewal verification is completed more than three months before the expiry date of the existing Document of Compliance or Safety Management Certificate, the new Document of Compliance or the new Safety Management Certificate should be valid from the date of () for a period not exceeding five years.A beginningoftherenewalverificationB completionoftherenewalverificationC beginningofscheduleddrydockingD completionofscheduleddrydocking

考题 单选题A vessel has been equipped with an oil lubricated stern bearing and is undergoing a routine dry-dock.Which of the following inspection should be made when the tail-shaft has been drawn?()A The overall condition of the bearing surface should be examinedB The shaft liner should be inspected for cracks and tested to insure a tight fitC The stern tube should be tested for cracks with dye penetrantD all of above

考题 单选题For safety reasons,when assistance towing().A the disabled vessel should be towed to the nearest portB the disabled vessel should be inspected for flammable gasesC passengers should always be removed from the disabled vesselD personnel on the disabled vessel should don PFD's

考题 单选题Which of the following actions should normally be taken during each watch when the auxiliary boilers is in operation?()A clean the flame scanner photocell windowB Inspect and clean all solenoid valvesC lift the safety valves by handD Inspect for oil or water leaks

考题 单选题What is NOT a requirement for testing the line throwing appliance on a vessel? ()A The appliance should be tested every three monthsB A regular service line should be used when testingC A regular projectile should be used when testingD An entry about the test must be made in the Official Log Book

考题 多选题Which of the following multimeter settings should only be used when there is no electrical flow through the part being tested? ()(Select TWO).AAmpereBContinuityCVoltDResistanceEWattage

考题 单选题Safety valves on a boiler vent to the ().A fuel tankB bilgeC atmosphereD auxiliary exhaust line

考题 单选题If you observe any situation which presents a safety or pollution hazard during fuel transfer operations, which of the following actions should be taken FIRST?()A Close the valves at the transfer manifoldB Notify the person in charge of the shore facilityC Shut down the transfer operationD Sound the fire alarm

考题 单选题() should be tested and adjusted when the boiler survey is carried out.A The boiler oil tankB The steam pipeC The fire sideD The safety valves

考题 单选题Which statement is TRUE concerning lifeboat gripes?()A They must be released by freeing a safety shackleB They should not be released until the boat is in lowering positionC They may be adjusted by a turnbuckleD They are normally used only with radial davits

考题 单选题Thermostatic expansion valves can be adjusted for ().A suction pressure onlyB head pressure onlyC superheat onlyD suction pressure and box temperature

考题 单选题In some type of two-stroke engines, besides some small holes for(), starting valve, safety valve, indicator cock, and central opening in each cylinder cover for mounting the()A fuel valves;exhaust valveB exhaust valves;inlet valveC fuel valves;inlet valveD exhaust valves;fuel valve

考题 单选题The emergency communication set’s transmitter should not be tested except when()by a public radio inspector.A inspectingB inspectedC inspectsD having inspected

考题 单选题In setting the valves on a steam-smothering system on a tanker,the master control valve to cargo tanks should be().A open and individual tank valves openB open and the individual tank valves closedC closed and the individual tank valves closedD closed and the individual tank valves open

考题 单选题Which action should be taken when an auxiliary boiler in is operation?()A Clean all electrical connectionsB Lift the relief valves by handC Inspect and clean all solenoid valvesD Inspect for oil and water leaks