单选题
When designing an expansion within the same data center, when is a pre-sales TDA absolutely required by IBM?()
A

for a SAN768B Director

B

for a second TS3500 Tape Library

C

for a second EXP5060 Expansion Unit

D

for an additional DS8300 Expansion Frame


参考答案

参考解析
解析: 暂无解析
更多 “单选题When designing an expansion within the same data center, when is a pre-sales TDA absolutely required by IBM?()A for a SAN768B DirectorB for a second TS3500 Tape LibraryC for a second EXP5060 Expansion UnitD for an additional DS8300 Expansion Frame” 相关考题
考题 Which of the following expansion cards would be necessary to increase fault tolerance in a VoIP server?() A. Second ModemB. Second CPUC. Second HBAD. Second PBX card

考题 When designing an expansion within the same data center, when is a pre-sales TDA absolutely required by IBM?() A. for a SAN768B DirectorB. for a second TS3500 Tape LibraryC. for a second EXP5060 Expansion UnitD. for an additional DS8300 Expansion Frame

考题 How many expansion frames can be attached to an IBM TS3500 model L23 or L53 base frame? () A. 15B. 16C. 17D. 18

考题 When the refrigeration demand is small,_______.A.the expansion valve will move toward the wide open positionB.the expansion valve will move toward the closing positionC.the feeler bulb will conveys the high temperatureD.the superheat degree will raise

考题 When compared to a high-expansion foam,a low-expansion foam will ______.A.Be dryerB.Be lighterC.Be less heat resistantD.Not cling to vertical surfaces

考题 Which of the following features is an IBM advantage when comparing the Oracle/Storage TekVirtual Storage Manager (VSM) to the IBM Virtualization Engine TS7700 (VTS)?()A、throughput B、automatic tape reclamation C、3490E tape volume emulation D、disk and tape (physical) storage included in same frame

考题 Which of the following expansion cards would be necessary to increase fault tolerance in a VoIP server?()A、Second ModemB、Second CPUC、Second HBAD、Second PBX card

考题 When designing an expansion within the same data center, when is a pre-sales TDA absolutely required by IBM?()A、for a SAN768B DirectorB、for a second TS3500 Tape LibraryC、for a second EXP5060 Expansion UnitD、for an additional DS8300 Expansion Frame

考题 A customer has an IBM System Storage DS8100 with 128 DDMs and needs to add additional capacity.  What must be verified by the Business Partner during the visit to the computer room()A、the space for the upgrade to a DS8700B、the space on the left of the DS8000 for an expansion frameC、the space on the right of the DS8000 for an expansion frameD、the space to install additional DDMs in the base frame

考题 When booting the p5 590 server in full system partition mode, which location is preferred for the fastest boot?()A、A SAN deviceB、First I/O drawerC、Any I/O drawer within the main frameD、First I/O drawer within the expansion frame

考题 A machine’s ONLY external interface is configured with an address of 192.168.5.1 and a netmask of 255.255.255.0.  No slots are available for expansion. Which of the following procedures should be performed to make it function as a gateway?()A、Enable ipforwarding onlyB、Configure an alias on the same interface and enable ipforwardingC、Add a second interface into the same subnet and enable ipforwardingD、Add a second interface into a different subnet, and enable ipforwarding

考题 A customer wants to purchase an IBM System Storage DS8700 to support a high-performance database environment.  Which technical solution gives the customer the best relationship between I/O performance at the machine’s backend vs. capacity installed in the machine()A、additional installation of the first and second expansion frame will increase the backend performance capabilityB、the usage of 300 GB/15k FC disks will give the server a high-performance backend capabilityC、performance Accelerator restricts the number of disks connected to one device adapter pair to 32 disksD、the second RIO-G loop between the base frame and the first expansion increases the backend performance

考题 A media customer has an IBM BladeCenter E with ten HS22 Blade server installed. Currently only one Ethernet port is available for each server. What is required to enable the second port on eachserver?()A、Fiber Channel Switch ModuleB、Gb Ethernet expansion cardC、Myrinet Cluster expansion cardD、Ethernet Switch Module

考题 How many expansion frames can be attached to an IBM TS3500 model L23 or L53 base frame? ()A、15B、16C、17D、18

考题 A current System z customer has 10,000 IBM 3490 tape cartridges, most of which are only 10%utilized, in their tape shelf storage adjacent to the computer room. The customer currently has nospace for the new DS8700 that is on order. What should the IBM storage specialist propose as asolution?()A、IBM Information Archive B、TS3500 with LTO-5 drives C、TS7700 Virtual Tape Server D、TS3310 with two expansion frames

考题 While upgrading an existing x445 with a second SMP expansion module and four processors, a technician notices the SMP connector cables are missing on the back, so the technician connects the cables.  Upon powering up, the technician notices the upper SMP expansion module is disabled.  Which of the following is the most likely cause of the problem?()A、The system requires 220V power to enable the upper SMP expansion module.B、The technician cabled the SMP expansions wrong.C、The Xcel4 cache needs to be reset in the BIOS because of the addition of the second SMP expansion module.D、If no hardware licenses keys have been purchased for the processors in the upper SMP expansion module, it will not be activated.

考题 单选题A machine’s ONLY external interface is configured with an address of 192.168.5.1 and a netmask of 255.255.255.0.  No slots are available for expansion. Which of the following procedures should be performed to make it function as a gateway?()A Enable ipforwarding onlyB Configure an alias on the same interface and enable ipforwardingC Add a second interface into the same subnet and enable ipforwardingD Add a second interface into a different subnet, and enable ipforwarding

考题 单选题A media customer has an IBM BladeCenter E with ten HS22 Blade server installed. Currently only one Ethernet port is available for each server. What is required to enable the second port on eachserver?()A Fiber Channel Switch ModuleB Gb Ethernet expansion cardC Myrinet Cluster expansion cardD Ethernet Switch Module

考题 单选题When the refrigeration demand is small,()A the expansion valve will move toward the wide open positionB the expansion valve will move toward the closing positionC the feeler bulb will conveys the high temperatureD the superheat degree will raise

考题 单选题When designing an expansion within the same data center, when is a pre-sales TDA absolutely required by IBM?()A for a SAN768B DirectorB for a second TS3500 Tape LibraryC for a second EXP5060 Expansion UnitD for an additional DS8300 Expansion Frame

考题 单选题How many expansion frames can be attached to an IBM TS3500 model L23 or L53 base frame? ()A 15B 16C 17D 18

考题 单选题Which of the following features is an IBM advantage when comparing the Oracle/Storage TekVirtual Storage Manager (VSM) to the IBM Virtualization Engine TS7700 (VTS)?()A throughput B automatic tape reclamation C 3490E tape volume emulation D disk and tape (physical) storage included in same frame

考题 单选题While upgrading an existing x445 with a second SMP expansion module and four processors, a technician notices the SMP connector cables are missing on the back, so the technician connects the cables.  Upon powering up, the technician notices the upper SMP expansion module is disabled.  Which of the following is the most likely cause of the problem?()A The system requires 220V power to enable the upper SMP expansion module.B The technician cabled the SMP expansions wrong.C The Xcel4 cache needs to be reset in the BIOS because of the addition of the second SMP expansion module.D If no hardware licenses keys have been purchased for the processors in the upper SMP expansion module, it will not be activated.

考题 单选题A customer wants to boot from an iSCSI SAN with their IBM BladeCenter infrastructure running Microsoft Windows Server 2000.  What is required for the customer to be able to perform this?()A Fibre Channel Expansion Card for each Blade ServerB cKVM Card for each Blade ServerC iSCSI Expansion Card for each Blade ServerD 4Gb Modular Flash Drive

考题 单选题Which of the following expansion cards would be necessary to increase fault tolerance in a VoIP server?()A  Second ModemB  Second CPUC  Second HBAD  Second PBX card

考题 单选题A customer has an IBM System Storage DS8100 with 128 DDMs and needs to add additional capacity.  What must be verified by the Business Partner during the visit to the computer room()A the space for the upgrade to a DS8700B the space on the left of the DS8000 for an expansion frameC the space on the right of the DS8000 for an expansion frameD the space to install additional DDMs in the base frame

考题 单选题A customer wants to purchase an IBM System Storage DS8700 to support a high-performance database environment.  Which technical solution gives the customer the best relationship between I/O performance at the machine’s backend vs. capacity installed in the machine()A additional installation of the first and second expansion frame will increase the backend performance capabilityB the usage of 300 GB/15k FC disks will give the server a high-performance backend capabilityC performance Accelerator restricts the number of disks connected to one device adapter pair to 32 disksD the second RIO-G loop between the base frame and the first expansion increases the backend performance

考题 单选题When booting the p5 590 server in full system partition mode, which location is preferred for the fastest boot?()A A SAN deviceB First I/O drawerC Any I/O drawer within the main frameD First I/O drawer within the expansion frame