网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The SWL of the derricks are different from 5 tons to 10 tons.()
A

吊杆的安全工作负荷从5吨到10吨不等。

B

安全规则规定,吊杆是5吨和10吨。

C

吊杆自身的重量从5吨到10吨不等。

D

起重机的安全工作负荷从5吨到10吨不等。


参考答案

参考解析
解析: 暂无解析
更多 “单选题The SWL of the derricks are different from 5 tons to 10 tons.()A 吊杆的安全工作负荷从5吨到10吨不等。B 安全规则规定,吊杆是5吨和10吨。C 吊杆自身的重量从5吨到10吨不等。D 起重机的安全工作负荷从5吨到10吨不等。” 相关考题
考题 We suggest your order()a minimum quantity of 10,000 tons. A、call forB、calls forC、call onD、call up

考题 From ________ the information concerning the tons per inch or centimeter immersion of a vessel shall be usually found.A.Stability CurveB.Deadweight ScaleC.Table of AzimuthD.Freeboard Assignment

考题 A shipboard oil pollution emergency plan is required of ______.A.all vessels, regardless of size and commercial applicationB.any barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboardC.an oil tanker of 150 gross tons or above, or other ship of 400 gross tons or aboveD.an oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above

考题 The Tonnage Certificate indicates ______.A.deadweight tonsB.displacement tonsC.net tons and gross tonsD.volume tons

考题 The SWL of the derricks are different from 5 tons to 10 tons.()A、吊杆的安全工作负荷从5吨到10吨不等。B、安全规则规定,吊杆是5吨和10吨。C、吊杆自身的重量从5吨到10吨不等。D、起重机的安全工作负荷从5吨到10吨不等。

考题 水手应该知道船上吊杆的安全工作负荷。()A、Sailors should know the SWL of cranes on board their ship.B、Sailors should know the SWL of derricks on board their ship.C、Officers should know the SWL of derricks on board their ship.D、Officers should know the SWL of cranes on board their ship.

考题 We are in receipt of your letter dated Jan 8, ____ we are pleased to learn that you want to order 100 tons of the subject goods.A、in whichB、from whichC、to whichD、at which

考题 ()an order for one thousand tons or more we grant a special discount of 10%.A、onB、ForC、ToD、On

考题 这个吊杆的安全工作负荷是6吨。()A、The SWL of the derrick is five tons.B、The SWL of the heavy derrick is six tons.C、The SWL of the derrick is six tons.D、The SWL of the crane is six tons.

考题 Lifting capacities of derricks vary from three to ten tons. ()A、吊杆的起吊能力为三至十吨不等B、克令吊的起吊能力为三至十吨不等C、他们每24个小时值两次班D、起重机的起吊能力为为三至十吨不等

考题 单选题If your vessel bums 8 tons of fuel per hour at 15 knots, how many tons per hour will it burn at 18 knots?()A 1382 tonsB 1561 tonsC 1600 tonsD 1637 tons

考题 单选题这个吊杆的安全工作负荷是6吨。()A The SWL of the derrick is five tons.B The SWL of the heavy derrick is six tons.C The SWL of the derrick is six tons.D The SWL of the crane is six tons.

考题 单选题The Tonnage Certificate indicates ().A deadweight tonsB displacement tonsC net tons and gross tonsD volume tons

考题 单选题Every new crude oil tanker of 20000 tons deadweight and above and every new product carrier of 30000 tons deadweight and above shall be()with segregated ballast tanks.A compliedB providedC dividedD supplied

考题 单选题At least()two-way VHF radiotelephone apparatus shall be provided on every cargo ship of 300 tons gross tonnage and upwards but less than 500 tons gross tonnage.A oneB twoC threeD four

考题 单选题From()the information concerning the tons per inch or centimeter immersion of a vessel shall be usually found.A variation curveB dead weight scaleC table of azimuthD freeboard assignment

考题 单选题A shipboard oil pollution emergency plan is required of ().A all vessels, regardless of size and commercial applicationB any barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboardC an oil tanker of 150 gross tons or above, or other ship of 400 gross tons or aboveD an oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above

考题 单选题A shipboard Oil Pollution Emergency Plan is required of().A all vessels,regardless of size and commercial applicationB any barge or ship constructed or operated in such a manner that no oil in any form can be carried aboardC an oil tanker of 150 gross tons and above,or other ship of 400 gross tons and aboveD an oil tanker of 400 gross tons and above,or other ships of 150 gross tons and above

考题 单选题The designed () is 20 tons per day, but the fresh water generator can only distil 15 tons at present.A displacementB weightC powerD capacity

考题 单选题The ()of the derrick is 5 tons.A GTB SWLC DWTD TDW

考题 单选题At least two two-way VHF radiotelephone apparatus shall be provided on every cargo ship of()tons gross tonnage and upwards but less than 500 tons gross tonnage.A 200B 300C 400D 800

考题 单选题()an order for one thousand tons or more we grant a special discount of 10%.A onB ForC ToD On

考题 单选题What is MTI?().A The foot/tons needed to trim the vessel by 1 inchB The foot/tons needed to trim the vessel by 1 footC The moments needed to trim the vessel by 1 centimeterD The amount of vessel will trim when loading 100 tons 100 feet from the tipping Center

考题 单选题The designed capacity is 25 tons a day, but the fresh water generator can only () 22 tons at present.A consumeB distillC runD operate

考题 单选题From()the information concerning the tons per inch or centimeter immersion of a vessel shall be usually found.A Stability curveB Deadweight scaleC Table of AzimuthD Freeboard assignment

考题 单选题Lifting capacities of derricks vary from three to ten tons. ()A 吊杆的起吊能力为三至十吨不等B 克令吊的起吊能力为三至十吨不等C 他们每24个小时值两次班D 起重机的起吊能力为为三至十吨不等

考题 单选题Every()shall be fitted with a cargo tank cleaning system using crude oil washing.A existing crude oil tanker of 20000 tons deadweight and underB new crude oil tanker of 20000 tons deadweight and underC existing crude oil tanker of 20000 tons deadweight and aboveD new crude oil tanker of 20000 tons deadweight and above