POWER 570是POWER Systems的高端主流产品,采用模块化的设计,请问最大支持几个CEC模块?()
A

2个

B

4个

C

6个

D

8个


参考答案

参考解析
解析: 暂无解析
更多 “单选题POWER 570是POWER Systems的高端主流产品,采用模块化的设计,请问最大支持几个CEC模块?()A 2个B 4个C 6个D 8个” 相关考题
考题 POWER570是POWERSystems的高端主流产品,采用模块化的设计,请问最大支持几个CEC模块?() A.2个B.4个C.6个D.8个

考题 与HP的rx3600相对应的POWER系列产品是() A.POWER570B.POWER520C.POWER550D.POWER595

考题 POWER570采用模块化设计,每个模块占用多少空间() A.4UB.5UC.6UD.8U

考题 Which system provides redundant system clocks?() A.Power 595B.Power 560C.Power 570D.Power 550

考题 与HPrx3600相比,哪一款POWER Systems服务器性能即可胜出?()A、POWER520即可B、需要POWER550C、需要POWER570D、需要POWER595

考题 与HP的rx3600相对应的POWER 系列产品是()A、POWER 570B、POWER 520C、POWER 550D、POWER 595

考题 A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored?()A、Identify which systems are the most critical and bring them up by level of importance.B、Retrieve the latest backup tapes for immediate system restore using the GFS rotation.C、Identify the least critical systems and then power those systems on first.D、Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.

考题 POWER 570是POWER Systems的高端主流产品,采用模块化的设计,请问最大支持几个CEC模块?()A、2个B、4个C、6个D、8个

考题 Which is a supported method to upgrade firmware on an IBM Power Systems 570?()  A、Use the /usr/sbin/invscout AIX command.B、Use the ’Updates’ panel on the managing HMcC、Boot the 570 using an IBM-provided microcode CdD、Use the /usr/lpp/diagnostics/bin/update_flash AIX command.

考题 POWER 570采用模块化设计, 每个模块占用多少空间()A、4UB、5UC、6UD、8U

考题 请问下列哪款IBM产品是由IBM负责免费安装的产品?()A、POWER 520B、POWER 550C、POWER 570D、以上都不是

考题 A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or laterB、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMCC、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing oneD、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

考题 与Sun SPARC Enterprise M4000相比,哪一款POWER Systems服务器性能即可胜出?()A、POWER520即可B、需要POWER550C、需要POWER570D、需要POWER595

考题 有关IBM POWER 520 服务器,下面的哪些说法是合理的()A、p520 是IBM POWER Systems 服务器一款入门级产品,可配置1核、2核、4核CPUB、p520 采用power6芯片,支持4.2GHz主频C、p520 支持AIX,LINUX操作系统D、以上都正确

考题 Which is a supported method to upgrade firmware on an IBM Power Systems 570?()A、Use the /usr/sbin/invscout AIX commandB、Use the 'Updates' panel on the managing HMCC、Boot the 570 using an IBM-provided microcode CDD、Use the /usr/lpp/diagnostics/bin/update_flash AIX command

考题 由于TPC组织不对中低端机器进行测试,那么POWER Systems中低端产品的tpc-c 是如何计算的?()A、根据CPU个数估计B、IBM自己测试结果C、根据POWER 570测试值和相关rperf推算D、以上都不对

考题 A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()A、A desk, as it not rack mountableB、Ethernet connections to the POWER5 systemsC、Serial connections to the POWER5 systemsD、USB connections for the keyboard and mouse

考题 Which system provides redundant system clocks?()A、Power 595B、Power 560C、Power 570D、Power 550

考题 关于POWER Systems和x系列服务器,下列陈述错误的是()A、POWER Systems是UNIX小型机B、X系列是X86服务器C、X系列可以运行linux操作系统D、POWER Systems不可以运行linux操作系统

考题 与HP rx8640相比,哪一款POWER Systems服务器性能即可胜出?()A、POWER520即可B、需要POWER550C、需要POWER570D、需要POWER595

考题 单选题A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()A A desk, as it not rack mountableB Ethernet connections to the POWER5 systemsC Serial connections to the POWER5 systemsD USB connections for the keyboard and mouse

考题 单选题A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored? ()A  Identify which systems are the most critical and bring them up by level of importance.B  Retrieve the latest backup tapes for immediate system restore using the GFS rotation.C  Identify the least critical systems and then power those systems on first.D  Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.

考题 单选题与HPrx3600相比,哪一款POWER Systems服务器性能即可胜出?()A POWER520即可B 需要POWER550C 需要POWER570D 需要POWER595

考题 单选题有关IBM POWER 520 服务器,下面的哪些说法是合理的()A p520 是IBM POWER Systems 服务器一款入门级产品,可配置1核、2核、4核CPUB p520 采用power6芯片,支持4.2GHz主频C p520 支持AIX,LINUX操作系统D 以上都正确

考题 单选题与SUN V490相比,哪一款POWER Systems服务器性能即可胜出?()A POWER520即可B 需要POWER550C 需要POWER570D 需要POWER595

考题 单选题与SUN SPARC Enterprise T5220相比,哪一款POWER Systems服务器性能即可胜出?()A POWER520即可B 需要POWER550C 需要POWER570D 需要POWER595

考题 单选题由于TPC组织不对中低端机器进行测试,那么POWER Systems中低端产品的tpc-c 是如何计算的?()A 根据CPU个数估计B IBM自己测试结果C 根据POWER 570测试值和相关rperf推算D 以上都不对