A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored?()

  • A、Identify which systems are the most critical and bring them up by level of importance.
  • B、Retrieve the latest backup tapes for immediate system restore using the GFS rotation.
  • C、Identify the least critical systems and then power those systems on first.
  • D、Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.

参考答案

更多 “A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored?()A、Identify which systems are the most critical and bring them up by level of importance.B、Retrieve the latest backup tapes for immediate system restore using the GFS rotation.C、Identify the least critical systems and then power those systems on first.D、Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.” 相关考题
考题 When data() , it has to be analyzed to decide what it all means. A.had been collectedB.has collectedC.has been collected

考题 Since 1780, when the town’s first hat factory ______ in Danbury, Connecticut, the town has been a center for hat manufacturing in the United States.A、were establishedB、was establishingC、had been establishedD、was established

考题 Which three are benefits of A virtualized data center solution over A typical implementation?()A、simplified cablingB、more efficient routingC、fewer applications per serverD、more efficient power consumptionE、more control over each serverF、less rack space

考题 Cisco UCS Manager provides the ability to manage power utilization to the blades. Which two statements about UCS Manager power policies are true? ()A、 Power capping helps mainly in reducing data center footprint.B、 Power capping helps reduce data center cooling.C、 A single power cap group policy allows you to set power limits across multiple UCS domains. D、 You can have multiple power cap groups per UCS domain.E、 Each blade within a UCS 5108 chassis can belong to a separate power cap group.

考题 Company.com has recently received a new p5-570 in the data center and intends to Micro-Partition the server. In which order should installation steps be taken?()A、Connect to the network,power on the server,Micro-Partition the serverB、Connect to the HMC,power on the server,Micro-Partition the server,connect to the networkC、Power on server,connect to the network,Micro-Partition the server,connect to the HMCD、Power on the server,connect to the HMC,Micro-Partition the server,connect to the network

考题 Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()A、Removes the requirement for Intelligent PDUsB、Monitor and balance disk speeds according to utilization needsC、Is a required element for EnergyStar certification of the server/data centerD、Monitor and report power and thermal trending to optimize energy consumption

考题 A failure of the primary data center has occurred.  A warm site is available for use.  Which of the following should be done FIRST to bring the critical applications online?()A、Run cabling and power to the warm site.B、Restore data to the equipment.C、Transfer all data tapes over to the warm site.D、Restore least critical applications online to test to make sure the site is functioning.

考题 A technician has had several support requests for one PC. The technician has reseated the PCIcards and replaced the hard drive in the PC located in a school cafeteria kitchen. PCs located in the business office or the classrooms have not had this issue. Which of the following is MOST likely causing this PC’s issue?()A、Faulty RAMB、240 volt Kitchen outletsC、Power BrownoutsD、Excessive Heat

考题 An SNMP alert has been generated by a server in the main data center.The alert stated that the internal temperature of the server has exceeded the threshold.No other servers in the rack have experienced problems,and no other alerts have come from that server about any other events.Which of the following is the cause of this issue?()A、Rack cooling equipment failureB、Dust collection in the serverC、Server processor failureD、Server power supply failure

考题 A customer is implementing a new streaming audio application and has requested a storageresource management product that will provide performance metrics for their IBM System StorageDS5100. The requirements are for controller read rates as well as controller data rate, amongothers. What IBM storage resource management tool would a technical specialist recommend?()A、Tivoli Storage Productivity Center for DataB、Tivoli Storage Productivity Center Basic EditionC、Tivoli Storage Productivity Center for Data Midrange EditionD、Tivoli Storage Productivity Center for Disk Midrange Edition

考题 A client has a SAP production database with 10 TB of usable storage on a DS4700. The growthrate of the data is 50% per year. The majority of the data rapidly becomes reference data and isnot frequently accessed. The customer would like to implement a solution that would migrate thereference data to a less expensive disk. Which of the following would be the most cost effectivesolution?()A、 N3400 Express with SnapVault B、 DS5020 using SATA drives and TSM with HSM C、 DS5300 with Tivoli Storage Productivity Center for Data D、 DS8700 with Tivoli Storage Productivity Center for Replication

考题 A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers.  Which of the following should the Sales Specialist emphasize to address the pricing difference?()A、Higher rack density that reduces data center footprintsB、Internal upgrades that only IBM can offerC、Total Cost of Ownership (TCO) related to innovative components such as Integrated Switches D、The Rear Door Heat eXchanger that only IBM can offer

考题 A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A、 vmstat and iostat data from the older machines B、 The number of CPUs that were installed in the original machines C、 Data from Workload Estimator (WLE) and IBM Performance Management (PM) D、 Performance data that is collected from the new system after it has been put into production

考题 ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical specialist perform to set the service processor network address for a static IP?()A、Configure the IP address through the first client partition.B、Configure the IP address through the ASMI menus.C、Configure the POWER5 service processor for DHCP from the HMC DHCP server.D、Configure the HMC to use the default IP address on the service processor when acquiring the managed server.

考题 A customer has the following equipment installed in their data center:  (1)an IBM BladeCenter H chassis (2)two power supplies  (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5.  Which of the following must be added to install the HX5 with MAX5?()A、Two additional power suppliesB、Fibre Channel (FC) switches and SAN storageC、A Nortel 1/10 GB ESMD、SSD for the HX5

考题 A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()A、A desk, as it not rack mountableB、Ethernet connections to the POWER5 systemsC、Serial connections to the POWER5 systemsD、USB connections for the keyboard and mouse

考题 An administrator has had a request from the data center for method to monitor the status of an  HACMP cluster. The monitoring software environment currently used is not compatible with SNM at this time, and there is not time to crate a new tool. There is also a restriction that the data center personnel not be allowed to login to the HACMP cluster nodes. What method will provide the solution for customer?()  A、 The clstat.cgi program will provide a solution.B、 The customer must install Tivoli with the HACMP plugin for monitoring the cluster.C、 The clinfo program included in the HACMP distribution will solve the monitoring issues.D、 Customize the cluster to send error notifications for every event to an email at the network control center.

考题 单选题A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()A The room temperature has reached 23C (73.4F). B A Blade within the chassis has been shut down. C The ambient temperature in the data center has increased D One of the additional System X servers in the BladeCenter rack has failed.

考题 单选题A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored? ()A  Identify which systems are the most critical and bring them up by level of importance.B  Retrieve the latest backup tapes for immediate system restore using the GFS rotation.C  Identify the least critical systems and then power those systems on first.D  Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.

考题 单选题An administrator has had a request from the data center for method to monitor the status of an  HACMP cluster. The monitoring software environment currently used is not compatible with SNM at this time, and there is not time to crate a new tool. There is also a restriction that the data center personnel not be allowed to login to the HACMP cluster nodes. What method will provide the solution for customer?()A  The clstat.cgi program will provide a solution.B  The customer must install Tivoli with the HACMP plugin for monitoring the cluster.C  The clinfo program included in the HACMP distribution will solve the monitoring issues.D  Customize the cluster to send error notifications for every event to an email at the network control center.

考题 单选题Certkiller .com has a remote data center with servers connected to a local datacenter through a high-speed network. Which of the following methods is the most convenient to use to install and upgrade the servers in the remote center using locally managed install images?()A NIMB HAGEO/HACMPC NFSD ftp, rsh and rexec

考题 多选题Cisco UCS Manager provides the ability to manage power utilization to the blades. Which two statements about UCS Manager power policies are true? ()APower capping helps mainly in reducing data center footprint.BPower capping helps reduce data center cooling.CA single power cap group policy allows you to set power limits across multiple UCS domains.DYou can have multiple power cap groups per UCS domain.EEach blade within a UCS 5108 chassis can belong to a separate power cap group.

考题 单选题A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A  vmstat and iostat data from the older machines B  The number of CPUs that were installed in the original machines C  Data from Workload Estimator (WLE) and IBM Performance Management (PM) D  Performance data that is collected from the new system after it has been put into production

考题 单选题Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()A Order a POWER5 HMCB Connect to the existing HMCC Install an 8-port asynchronous card in the managed server to connect to the existing HMCD Install an additional network card to the existing HMC and connect to the POWER5 service processor

考题 单选题Company.com has recently received a new p5-570 in the data center and intends to Micro-Partition the server. In which order should installation steps be taken?()A Connect to the network,power on the server,Micro-Partition the serverB Connect to the HMC,power on the server,Micro-Partition the server,connect to the networkC Power on server,connect to the network,Micro-Partition the server,connect to the HMCD Power on the server,connect to the HMC,Micro-Partition the server,connect to the network

考题 单选题Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()A Removes the requirement for Intelligent PDUsB Monitor and balance disk speeds according to utilization needsC Is a required element for EnergyStar certification of the server/data centerD Monitor and report power and thermal trending to optimize energy consumption

考题 多选题Which three are benefits of A virtualized data center solution over A typical implementation?()Amore efficient power consumptionBfewer applications per serverCless rack spaceDmore efficient routingEmore control over each serverFsimplified cabling