网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Which of the following should be performed after a maintenance kit has been applied and fullfunctionality tested?()
A

Roller regenerator applied

B

Page count reset

C

New network settings applied

D

Printer drum replacement


参考答案

参考解析
解析: 暂无解析
更多 “单选题Which of the following should be performed after a maintenance kit has been applied and fullfunctionality tested?()A Roller regenerator appliedB Page count resetC New network settings appliedD Printer drum replacement” 相关考题
考题 Which of the following is included in the typical laser printer maintenance kit?() A. Print headB. TonerC. FuserD. Main drive assemblyE. Pickup rollers

考题 A network technician is installing a new managed 10/100 Mbps switch on the network. The network has an older printer with a 10Mbps network adapter that will be moved to the new switch.Which of the following settings on the switch will need to be configured to support the printer?()A. MAC filteringB. IP addressC. PoED. Port speed

考题 A parallel printer has just been connected. There are not selections in the SMIT menu to configure the printer. Which of the following procedures should be performed to complete the configuration?() A.chdevB.rebootC.lpstat -QD.smit install

考题 Which of the following is included in the typical laser printer maintenance kit?()A、Print headB、TonerC、FuserD、Main drive assemblyE、Pickup rollers

考题 A laser printer displays ‘perform user maintenance’. The manufacturer’s information was not available when the user performed the maintenance, and the laser printer continues to display the maintenance code. Which of the following items needs to be performed?()A、The printer needs to be sent to the manufacturer for maintenance.B、The printer’s firmware needs to be updated.C、A printer system reset must be performed.D、The maintenance page counter must be reset.

考题 A network technician is installing a new managed 10/100 Mbps switch on the network. The network has an older printer with a 10Mbps network adapter that will be moved to the new switch. Which of the following settings on the switch will need to be configured to support the printer?()A、MAC filteringB、IP addressC、PoED、Port speed

考题 A graphics card has been added to the system. After rebooting, the system hangs during the login process with a blue screen indicating "CDE please wait". Which of the following procedures should be performed next?()A、Reinstall the CDE softwareB、Check the name resolutionC、Uncomment the last line in .dtprofileD、Boot in maintenance mode and perform fsck on file systems

考题 Which of the following should be performed after a maintenance kit has been applied and fullfunctionality tested?()A、Roller regenerator appliedB、Page count resetC、New network settings appliedD、Printer drum replacement

考题 A server has failed after a tested and scheduled change control has been implemented.  Which of the following is the FIRST thing the server technician should do?()A、Perform a root cause analysis.B、Escalate the problem.C、Notify stakeholders.D、Establish a plan of action.

考题 A technician has resolved a paper jam. After the jam is cleared, the display continues to indicate that the printer is jammed. Which of the following should be performed NEXT?()A、Power cycle the printerB、Print a test pageC、Remove all the paper trays and restart the printerD、Remove and replace the roller

考题 A user notices the department laser printer is printing light. Which of the following items should a technician do FIRST to fix this issue? ()A、Remove and clean the fuser assembly with an alcohol based cleaner.B、Install a maintenance kit and reset all page counts to zero.C、Perform a full power cycle on the printer.D、Clean the paper path with a damp cloth and canned air to remove any debris.

考题 A user is browsing to a newly created internal site called www.comptia.org. After putting incredentials the page comes up blank. Which of the following is MOST likely the cause?()A、The user must add the new site to the local log file.B、A proxy exception has not been configured.C、SMTP has not been configured.D、The loopback address has not been configured.

考题 A patch has been applied to the operating system.  After rebooting, the system is hung.  Which of the following commands should have been performed to prevent the system from hanging?()A、 lppchk, bosboot B、 lslpp -l, oslevel C、 installp -C, lppchk D、 bosboot, synclvodm 

考题 A parallel printer has just been connected. There are not selections in the SMIT menu to configure the printer. Which of the following procedures should be performed to complete the configuration?()A、chdevB、rebootC、lpstat -QD、smit install

考题 单选题A server has failed after a tested and scheduled change control has been implemented.  Which of the following is the FIRST thing the server technician should do?()A Perform a root cause analysis.B Escalate the problem.C Notify stakeholders.D Establish a plan of action.

考题 单选题A graphics card has been added to the system. After rebooting, the system hangs during the login process with a blue screen indicating "CDE please wait". Which of the following procedures should be performed next?()A Reinstall the CDE softwareB Check the name resolutionC Uncomment the last line in .dtprofileD Boot in maintenance mode and perform fsck on file systems

考题 单选题A technician has resolved a paper jam. After the jam is cleared, the display continues to indicate that the printer is jammed. Which of the following should be performed NEXT?()A Power cycle the printerB Print a test pageC Remove all the paper trays and restart the printerD Remove and replace the roller

考题 单选题A laser printer displays ‘perform user maintenance’. The manufacturer’s information was not available when the user performed the maintenance, and the laser printer continues to display the maintenance code. Which of the following items needs to be performed?()A The printer needs to be sent to the manufacturer for maintenance.B The printer’s firmware needs to be updated.C A printer system reset must be performed.D The maintenance page counter must be reset.

考题 单选题A user notices the department laser printer is printing light. Which of the following items should a technician do FIRST to fix this issue? ()A Remove and clean the fuser assembly with an alcohol based cleaner.B Install a maintenance kit and reset all page counts to zero.C Perform a full power cycle on the printer.D Clean the paper path with a damp cloth and canned air to remove any debris.

考题 多选题Which of the following is included in the typical laser printer maintenance kit?()APrint headBTonerCFuserDMain drive assemblyEPickup rollers

考题 单选题The technician has suspicions that a browser has been hijacked. Which of the following should the technician look for in this situation?()A A new default gateway has been setup.B A new Internet shortcut has been added.C A new web browser has been installed and is now the default.D A proxy server has been enabled.

考题 单选题A network technician is installing a new managed 10/100 Mbps switch on the network. The network has an older printer with a 10Mbps network adapter that will be moved to the new switch. Which of the following settings on the switch will need to be configured to support the printer?()A MAC filteringB IP addressC PoED Port speed

考题 单选题A new department is formed and a new section of the building is being built out for them. All 50 new employees will need access to the wireless network. Which of the following should be completed to allow these new employees access to the wireless network?()A Frequency settings should be changedB Additional WAPs should be installedC Channels should be changedD VLANs should be added

考题 单选题A technician is setting up a new inkjet printer and notices that the images appear hazy. Which of the following should the technician perform FIRST to resolve the issue?()A Refill the cartridgesB Replace the tonerC Replace the network cableD Calibrate the inkjet printer

考题 单选题A vessel has been equipped with an oil lubricated stern bearing and is undergoing a routine dry-dock.Which of the following inspection should be made when the tail-shaft has been drawn?()A The overall condition of the bearing surface should be examinedB The shaft liner should be inspected for cracks and tested to insure a tight fitC The stern tube should be tested for cracks with dye penetrantD all of above

考题 单选题A patch has been applied to the operating system.  After rebooting, the system is hung.  Which of the following commands should have been performed to prevent the system from hanging?()A  lppchk, bosboot B  lslpp -l, oslevel C  installp -C, lppchk D  bosboot, synclvodm 

考题 单选题A parallel printer has just been connected. There are not selections in the SMIT menu to configure the printer. Which of the following procedures should be performed to complete the configuration?()A chdevB rebootC lpstat -QD smit install